{"title":"具有序列相关设置时间的不相关并行机调度问题的混合整数规划模型,以最小化完工时间和总延迟","authors":"Papimol Kongsri, J. Buddhakulsomsiri","doi":"10.1109/ICIEA49774.2020.9102086","DOIUrl":null,"url":null,"abstract":"This paper involves an unrelated parallel machine scheduling problem. Setup times are sequence dependent. A mixed integer linear programming model that represents the system is formulated. Two measures of performance, makespan, total tardiness, and a combination of both measures, are minimize. Results from a numerical example show that, with a proper weight between the two measures, a compromise solution can be found.","PeriodicalId":306461,"journal":{"name":"2020 IEEE 7th International Conference on Industrial Engineering and Applications (ICIEA)","volume":"58 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2020-04-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":"{\"title\":\"A Mixed Integer Programming Model for Unrelated Parallel Machine Scheduling Problem with Sequence Dependent Setup Time to Minimize Makespan and Total Tardiness\",\"authors\":\"Papimol Kongsri, J. Buddhakulsomsiri\",\"doi\":\"10.1109/ICIEA49774.2020.9102086\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This paper involves an unrelated parallel machine scheduling problem. Setup times are sequence dependent. A mixed integer linear programming model that represents the system is formulated. Two measures of performance, makespan, total tardiness, and a combination of both measures, are minimize. Results from a numerical example show that, with a proper weight between the two measures, a compromise solution can be found.\",\"PeriodicalId\":306461,\"journal\":{\"name\":\"2020 IEEE 7th International Conference on Industrial Engineering and Applications (ICIEA)\",\"volume\":\"58 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2020-04-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"2\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2020 IEEE 7th International Conference on Industrial Engineering and Applications (ICIEA)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ICIEA49774.2020.9102086\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2020 IEEE 7th International Conference on Industrial Engineering and Applications (ICIEA)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICIEA49774.2020.9102086","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
A Mixed Integer Programming Model for Unrelated Parallel Machine Scheduling Problem with Sequence Dependent Setup Time to Minimize Makespan and Total Tardiness
This paper involves an unrelated parallel machine scheduling problem. Setup times are sequence dependent. A mixed integer linear programming model that represents the system is formulated. Two measures of performance, makespan, total tardiness, and a combination of both measures, are minimize. Results from a numerical example show that, with a proper weight between the two measures, a compromise solution can be found.