电力工业改革框架下萨尔瓦多和尼加拉瓜电力控制中心的经验

L. P. Prado, F. Soto
{"title":"电力工业改革框架下萨尔瓦多和尼加拉瓜电力控制中心的经验","authors":"L. P. Prado, F. Soto","doi":"10.1109/DRPT.2000.855702","DOIUrl":null,"url":null,"abstract":"This paper gives a brief description of the concepts and goals of the electricity industry reforms process with some references about the Central America context. It presents a brief description of the operation of the electricity control centers in the competitive market as a result of such electricity industry reforms, where two main functions are treated, the system operation and the power exchange administration. Two Central American countries, El Salvador and Nicaragua, are specifically treated in this paper. The electricity industry organisation is given as context for both countries. The electricity control center operation is explained for each of these countries. The operations of the electricity control center in each country are presented using a novel functional model, based in intuitive graphical representation of the information flow. With this model approach the functions change under demands, because the reforms, can be added, placed, linked and documented. Some conclusions about the induced changes at the electricity control centers in El Salvador and Nicaragua are considered.","PeriodicalId":127287,"journal":{"name":"DRPT2000. International Conference on Electric Utility Deregulation and Restructuring and Power Technologies. Proceedings (Cat. No.00EX382)","volume":"2 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2000-04-04","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Experiences at the electricity control centers in El Salvador and Nicaragua in the frame of the Electricity Industry Reforms\",\"authors\":\"L. P. Prado, F. Soto\",\"doi\":\"10.1109/DRPT.2000.855702\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This paper gives a brief description of the concepts and goals of the electricity industry reforms process with some references about the Central America context. It presents a brief description of the operation of the electricity control centers in the competitive market as a result of such electricity industry reforms, where two main functions are treated, the system operation and the power exchange administration. Two Central American countries, El Salvador and Nicaragua, are specifically treated in this paper. The electricity industry organisation is given as context for both countries. The electricity control center operation is explained for each of these countries. The operations of the electricity control center in each country are presented using a novel functional model, based in intuitive graphical representation of the information flow. With this model approach the functions change under demands, because the reforms, can be added, placed, linked and documented. Some conclusions about the induced changes at the electricity control centers in El Salvador and Nicaragua are considered.\",\"PeriodicalId\":127287,\"journal\":{\"name\":\"DRPT2000. International Conference on Electric Utility Deregulation and Restructuring and Power Technologies. Proceedings (Cat. No.00EX382)\",\"volume\":\"2 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2000-04-04\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"DRPT2000. International Conference on Electric Utility Deregulation and Restructuring and Power Technologies. Proceedings (Cat. No.00EX382)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/DRPT.2000.855702\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"DRPT2000. International Conference on Electric Utility Deregulation and Restructuring and Power Technologies. Proceedings (Cat. No.00EX382)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/DRPT.2000.855702","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

本文简要介绍了电力工业改革的概念和目标,并参考了中美洲的情况。简要介绍了电力行业改革后电力控制中心在竞争市场中的运行情况,其中主要讨论了系统运行和电力交换管理两个功能。两个中美洲国家,萨尔瓦多和尼加拉瓜,在本文中具体处理。电力行业组织是两国的背景。介绍了这些国家的电力控制中心的运行情况。每个国家的电力控制中心的运作采用一种新颖的功能模型,基于直观的图形表示信息流。使用此模型方法,功能会根据需求而变化,因为可以添加、放置、链接和记录改革。对萨尔瓦多和尼加拉瓜两国电力控制中心的诱发变化进行了分析。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Experiences at the electricity control centers in El Salvador and Nicaragua in the frame of the Electricity Industry Reforms
This paper gives a brief description of the concepts and goals of the electricity industry reforms process with some references about the Central America context. It presents a brief description of the operation of the electricity control centers in the competitive market as a result of such electricity industry reforms, where two main functions are treated, the system operation and the power exchange administration. Two Central American countries, El Salvador and Nicaragua, are specifically treated in this paper. The electricity industry organisation is given as context for both countries. The electricity control center operation is explained for each of these countries. The operations of the electricity control center in each country are presented using a novel functional model, based in intuitive graphical representation of the information flow. With this model approach the functions change under demands, because the reforms, can be added, placed, linked and documented. Some conclusions about the induced changes at the electricity control centers in El Salvador and Nicaragua are considered.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Degeneracy and duality gap on optimization-based electricity auctions Evaluation of the Romanian electricity industry restructuring process in comparison with the experience in the United Kingdom The use of tangent vectors for voltage collapse analysis Study of interrelations between electric power systems and large consumers in Russia Short-term investment scheduling in transmission power systems by evolutionary computation
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1