{"title":"大规模木材生产-减少现场安装过程中非增值活动的意义。","authors":"R. Brisland, P. Forsythe, Alirezea Ahmadian Fard Fini","doi":"10.29173/MOCS98","DOIUrl":null,"url":null,"abstract":"The recent uptake of Mass Timber (M.T.), a prefabricated timber panelised form of construction, provides a potential sustainable resource to facilitate improved productivity outcomes to the construction industry. However, in Australia as well as U.S. and Canada, M.T. is in its infancy and there is a lack of empirical information available to industry. This consequently has resulted in reluctance by contractors and professionals to uptake this new innovative system. The aim of this paper is to undertake a comprehensive review of the on-site productivity outcomes. A quantitative Case Study approach was implemented by way of time-lapse digital video recording of three M.T. multi-storey buildings located in NSW, Australia. Crane cycles of the installation of the M.T. prefabricated panels were found to be the most representative and repeatable process and as a consequence were used to measure the M.T. productivity. Discussion is provided on potential areas of process and consequential productivity improvement. The M.T. crane cycles productivity at an Activity Level compared to M.T. productivity at Project Level revealed large differential between the two levels. The quantum of Non-Value Add activities was found to be a significant factor in the overall Project Level productivity outcome. This review paper undertakes a review of the outcomes of the case studies on the M.T. installation on three multi-storey buildings, the factors found that affected the resultant on-site construction productivity and its resultant beneficial implications to the construction industry.","PeriodicalId":422911,"journal":{"name":"Modular and Offsite Construction (MOC) Summit Proceedings","volume":"48 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2019-05-24","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":"{\"title\":\"Mass Timber Productivity- the Significance of Reduction in Non-Value Add Activities during On-Site Installation Sequence.\",\"authors\":\"R. Brisland, P. Forsythe, Alirezea Ahmadian Fard Fini\",\"doi\":\"10.29173/MOCS98\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The recent uptake of Mass Timber (M.T.), a prefabricated timber panelised form of construction, provides a potential sustainable resource to facilitate improved productivity outcomes to the construction industry. However, in Australia as well as U.S. and Canada, M.T. is in its infancy and there is a lack of empirical information available to industry. This consequently has resulted in reluctance by contractors and professionals to uptake this new innovative system. The aim of this paper is to undertake a comprehensive review of the on-site productivity outcomes. A quantitative Case Study approach was implemented by way of time-lapse digital video recording of three M.T. multi-storey buildings located in NSW, Australia. Crane cycles of the installation of the M.T. prefabricated panels were found to be the most representative and repeatable process and as a consequence were used to measure the M.T. productivity. Discussion is provided on potential areas of process and consequential productivity improvement. The M.T. crane cycles productivity at an Activity Level compared to M.T. productivity at Project Level revealed large differential between the two levels. The quantum of Non-Value Add activities was found to be a significant factor in the overall Project Level productivity outcome. This review paper undertakes a review of the outcomes of the case studies on the M.T. installation on three multi-storey buildings, the factors found that affected the resultant on-site construction productivity and its resultant beneficial implications to the construction industry.\",\"PeriodicalId\":422911,\"journal\":{\"name\":\"Modular and Offsite Construction (MOC) Summit Proceedings\",\"volume\":\"48 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2019-05-24\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"2\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Modular and Offsite Construction (MOC) Summit Proceedings\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.29173/MOCS98\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Modular and Offsite Construction (MOC) Summit Proceedings","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.29173/MOCS98","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2

摘要

最近采用的大量木材(M.T.),一种预制木材镶板的建筑形式,提供了一种潜在的可持续资源,以促进提高建筑行业的生产力成果。然而,在澳大利亚、美国和加拿大,M.T.还处于起步阶段,缺乏可供工业界使用的经验信息。因此,承包商和专业人员不愿采用这种新的创新系统。本文的目的是对现场生产力结果进行全面审查。通过对澳大利亚新南威尔士州三座mt多层建筑的延时数字视频记录,实施了定量案例研究方法。安装M.T.预制板的起重机周期被认为是最具代表性和可重复的过程,因此被用来衡量M.T.的生产率。讨论了过程和相应的生产力改进的潜在领域。活动水平的M.T.起重机循环生产率与项目水平的M.T.生产率相比,显示了两个水平之间的巨大差异。非增值活动的数量被发现是整个项目水平生产力结果的一个重要因素。本检讨文件旨在检讨在三栋多层大厦安装机电设备的个案研究结果、发现影响现场施工生产力的因素,以及对建造业的有益影响。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Mass Timber Productivity- the Significance of Reduction in Non-Value Add Activities during On-Site Installation Sequence.
The recent uptake of Mass Timber (M.T.), a prefabricated timber panelised form of construction, provides a potential sustainable resource to facilitate improved productivity outcomes to the construction industry. However, in Australia as well as U.S. and Canada, M.T. is in its infancy and there is a lack of empirical information available to industry. This consequently has resulted in reluctance by contractors and professionals to uptake this new innovative system. The aim of this paper is to undertake a comprehensive review of the on-site productivity outcomes. A quantitative Case Study approach was implemented by way of time-lapse digital video recording of three M.T. multi-storey buildings located in NSW, Australia. Crane cycles of the installation of the M.T. prefabricated panels were found to be the most representative and repeatable process and as a consequence were used to measure the M.T. productivity. Discussion is provided on potential areas of process and consequential productivity improvement. The M.T. crane cycles productivity at an Activity Level compared to M.T. productivity at Project Level revealed large differential between the two levels. The quantum of Non-Value Add activities was found to be a significant factor in the overall Project Level productivity outcome. This review paper undertakes a review of the outcomes of the case studies on the M.T. installation on three multi-storey buildings, the factors found that affected the resultant on-site construction productivity and its resultant beneficial implications to the construction industry.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
VDC management in the industrialization process using prefabricated reinforcement cages. Case Study: Ovalo Monitor Bridge Keyword identification framework for speech communication on construction sites Offsite Construction education adoption in Civil Engineering undergraduate curriculum: analysis and proposal Layout modelling of the built environment for autonomous mobile robots using Building Information Modelling (BIM) and simulation An holistic approach to product evaluation and selection in industrialised building: Benchmarking of long span, low carbon floor systems
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1