分布式资源约束下多项目调度问题的层次模型

Yuanxun Shi, Zongzhan Du, Jianxun Li
{"title":"分布式资源约束下多项目调度问题的层次模型","authors":"Yuanxun Shi, Zongzhan Du, Jianxun Li","doi":"10.1145/3364335.3364363","DOIUrl":null,"url":null,"abstract":"Multi-projects are quite common in industries, especially in made-to-order enterprises. These projects usually require limited local or global resources distributed and controlled by different departments. The scheduling problem for this kind of multi-projects is known as distributed resource constrained multi-projects scheduling problem (DRCMPSP). It is difficult to resolve the conflict of interest between different departments during scheduling. In this paper, a new hierarchy model using heuristic method based on priority rules for solving the problem. The decision making process is supposed to be hierarchical and decentralized, with one global decision maker and as many local decision makers as the resources managers. The difference between the method proposed and other hierarchical methods is that its decision stages and makers are divided from the department or manager, not from projects. It can achieve the benefit coordination between project managers and resources managers, and thus generate the overall optimal scheduling.","PeriodicalId":403515,"journal":{"name":"Proceedings of the 5th International Conference on Industrial and Business Engineering","volume":"8 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2019-09-27","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Hierarchy Model for Distributed Resource Constrained Multi-project Scheduling Problem\",\"authors\":\"Yuanxun Shi, Zongzhan Du, Jianxun Li\",\"doi\":\"10.1145/3364335.3364363\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Multi-projects are quite common in industries, especially in made-to-order enterprises. These projects usually require limited local or global resources distributed and controlled by different departments. The scheduling problem for this kind of multi-projects is known as distributed resource constrained multi-projects scheduling problem (DRCMPSP). It is difficult to resolve the conflict of interest between different departments during scheduling. In this paper, a new hierarchy model using heuristic method based on priority rules for solving the problem. The decision making process is supposed to be hierarchical and decentralized, with one global decision maker and as many local decision makers as the resources managers. The difference between the method proposed and other hierarchical methods is that its decision stages and makers are divided from the department or manager, not from projects. It can achieve the benefit coordination between project managers and resources managers, and thus generate the overall optimal scheduling.\",\"PeriodicalId\":403515,\"journal\":{\"name\":\"Proceedings of the 5th International Conference on Industrial and Business Engineering\",\"volume\":\"8 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2019-09-27\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Proceedings of the 5th International Conference on Industrial and Business Engineering\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1145/3364335.3364363\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of the 5th International Conference on Industrial and Business Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1145/3364335.3364363","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

摘要

多项目在工业中非常普遍,特别是在定制企业中。这些项目通常需要有限的本地或全球资源,由不同的部门分配和控制。这种多项目调度问题称为分布式资源约束多项目调度问题(DRCMPSP)。在调度过程中,各部门之间的利益冲突难以解决。本文提出了一种新的基于优先级规则的启发式层次模型来求解该问题。决策过程应该是分层和分散的,有一个全球决策者和尽可能多的本地决策者作为资源管理者。该方法与其他分层方法的不同之处在于,它的决策阶段和决策者是从部门或经理中划分出来的,而不是从项目中划分出来的。它可以实现项目管理者和资源管理者之间的利益协调,从而产生整体的最优调度。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Hierarchy Model for Distributed Resource Constrained Multi-project Scheduling Problem
Multi-projects are quite common in industries, especially in made-to-order enterprises. These projects usually require limited local or global resources distributed and controlled by different departments. The scheduling problem for this kind of multi-projects is known as distributed resource constrained multi-projects scheduling problem (DRCMPSP). It is difficult to resolve the conflict of interest between different departments during scheduling. In this paper, a new hierarchy model using heuristic method based on priority rules for solving the problem. The decision making process is supposed to be hierarchical and decentralized, with one global decision maker and as many local decision makers as the resources managers. The difference between the method proposed and other hierarchical methods is that its decision stages and makers are divided from the department or manager, not from projects. It can achieve the benefit coordination between project managers and resources managers, and thus generate the overall optimal scheduling.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
A Cooperative Logistics Management Model Based on Traceability for Reducing the Logistics Costs of Coffee Storage in Peru's Agro-Export Sector Coordinating the Supply Chain with Purchase Service Offered by a 3PL Firm Measurement of Maintenance Performance Using Six Sigma Maintenance Scorecard Method (Case Study in PT X Aircraft Service Maintenance Workshop) Package Delivery Route Optimization with Tight Travel Time An Exploration on the Problems of Replacing Accounting Professions by AI in the Future
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1