{"title":"考虑多维护机制的柔性生产线调度研究","authors":"Fei Peng","doi":"10.1145/3364335.3364403","DOIUrl":null,"url":null,"abstract":"The reliability of equipment is one of the important factors to ensure the production process. In flexible production line, the reliability of equipment will decrease with the use of time. In order to ensure the continuous availability of equipment, multiple equipment maintenance methods are introduced. Firstly, this paper establishes a scheduling model for scientific problems, introducing objective function, constraints and solving algorithm. Finally, the effectiveness of the method is proved by case study.","PeriodicalId":403515,"journal":{"name":"Proceedings of the 5th International Conference on Industrial and Business Engineering","volume":"22 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2019-09-27","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Research on Flexible Production Line Scheduling Considering Multiple Maintenance Mechanisms\",\"authors\":\"Fei Peng\",\"doi\":\"10.1145/3364335.3364403\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The reliability of equipment is one of the important factors to ensure the production process. In flexible production line, the reliability of equipment will decrease with the use of time. In order to ensure the continuous availability of equipment, multiple equipment maintenance methods are introduced. Firstly, this paper establishes a scheduling model for scientific problems, introducing objective function, constraints and solving algorithm. Finally, the effectiveness of the method is proved by case study.\",\"PeriodicalId\":403515,\"journal\":{\"name\":\"Proceedings of the 5th International Conference on Industrial and Business Engineering\",\"volume\":\"22 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2019-09-27\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Proceedings of the 5th International Conference on Industrial and Business Engineering\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1145/3364335.3364403\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of the 5th International Conference on Industrial and Business Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1145/3364335.3364403","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Research on Flexible Production Line Scheduling Considering Multiple Maintenance Mechanisms
The reliability of equipment is one of the important factors to ensure the production process. In flexible production line, the reliability of equipment will decrease with the use of time. In order to ensure the continuous availability of equipment, multiple equipment maintenance methods are introduced. Firstly, this paper establishes a scheduling model for scientific problems, introducing objective function, constraints and solving algorithm. Finally, the effectiveness of the method is proved by case study.