{"title":"铁路平交道口安全系统离网电源的全寿命成本","authors":"Arrmeila Jeyanathan, S. Chew, D. Stevenson, L. Cipcigan","doi":"10.1109/UPEC50034.2021.9548187","DOIUrl":null,"url":null,"abstract":"In a collaborative project between Network Rail and Cardiff University, a comparative whole life cost analysis on two off-grid power supply solutions to power an Overlay Miniature Signal Light at an unprotected crossing was completed. Following a methodology closely aligned with Network Rail standards and BS EN 60300, a renewable off-grid power supply was designed in order to be compared with the non-renewable solution currently on trial on UK infrastructure. The whole life cost analysis was performed using HOMER Pro software where parametric cost estimating was used to populate the cost breakdown structure of each system. The new solution was developed from conducting a feasibility study on a case study location. Simulation results show that the new renewable solution demonstrates a positive investment after a 20-year lifetime where the net present values of the proposed and base system were £8,207 and £27,523.27 respectively. A roll out scenario of installation across 4,794 crossings was also done where the proposed solution showed to have a lower total whole life cost. Both solutions were modelled for the case study location Coedmawr Farm 2 Level Crossing in Carmarthenshire, Wales where an unprotecting crossing is situated.","PeriodicalId":325389,"journal":{"name":"2021 56th International Universities Power Engineering Conference (UPEC)","volume":"24 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-08-31","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Whole Life Costing of Off- Grid Power Supplies for Rail Level Crossing Safety Systems\",\"authors\":\"Arrmeila Jeyanathan, S. Chew, D. Stevenson, L. Cipcigan\",\"doi\":\"10.1109/UPEC50034.2021.9548187\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"In a collaborative project between Network Rail and Cardiff University, a comparative whole life cost analysis on two off-grid power supply solutions to power an Overlay Miniature Signal Light at an unprotected crossing was completed. Following a methodology closely aligned with Network Rail standards and BS EN 60300, a renewable off-grid power supply was designed in order to be compared with the non-renewable solution currently on trial on UK infrastructure. The whole life cost analysis was performed using HOMER Pro software where parametric cost estimating was used to populate the cost breakdown structure of each system. The new solution was developed from conducting a feasibility study on a case study location. Simulation results show that the new renewable solution demonstrates a positive investment after a 20-year lifetime where the net present values of the proposed and base system were £8,207 and £27,523.27 respectively. A roll out scenario of installation across 4,794 crossings was also done where the proposed solution showed to have a lower total whole life cost. Both solutions were modelled for the case study location Coedmawr Farm 2 Level Crossing in Carmarthenshire, Wales where an unprotecting crossing is situated.\",\"PeriodicalId\":325389,\"journal\":{\"name\":\"2021 56th International Universities Power Engineering Conference (UPEC)\",\"volume\":\"24 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2021-08-31\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2021 56th International Universities Power Engineering Conference (UPEC)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/UPEC50034.2021.9548187\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2021 56th International Universities Power Engineering Conference (UPEC)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/UPEC50034.2021.9548187","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
摘要
在网络铁路和卡迪夫大学之间的合作项目中,完成了两种离网供电解决方案的全寿命成本比较分析,为无保护交叉路口的覆盖微型信号灯供电。遵循与网络铁路标准和BS EN 60300密切相关的方法,设计了可再生离网电源,以便与目前在英国基础设施中试用的不可再生解决方案进行比较。使用HOMER Pro软件进行全寿命成本分析,其中参数成本估算用于填充每个系统的成本分解结构。新的解决方案是通过对一个案例研究地点进行可行性研究而开发出来的。仿真结果表明,新的可再生能源解决方案在20年的使用寿命后显示出正投资,其中建议系统和基本系统的净现值分别为8,207英镑和27,523.27英镑。在4794个交叉路口安装的推广场景中,建议的解决方案显示出较低的全生命周期总成本。这两种解决方案都是针对案例研究地点Coedmawr Farm 2 Level Crossing进行建模的,该地点位于威尔士卡马森郡(Carmarthenshire),那里有一个没有保护的十字路口。
Whole Life Costing of Off- Grid Power Supplies for Rail Level Crossing Safety Systems
In a collaborative project between Network Rail and Cardiff University, a comparative whole life cost analysis on two off-grid power supply solutions to power an Overlay Miniature Signal Light at an unprotected crossing was completed. Following a methodology closely aligned with Network Rail standards and BS EN 60300, a renewable off-grid power supply was designed in order to be compared with the non-renewable solution currently on trial on UK infrastructure. The whole life cost analysis was performed using HOMER Pro software where parametric cost estimating was used to populate the cost breakdown structure of each system. The new solution was developed from conducting a feasibility study on a case study location. Simulation results show that the new renewable solution demonstrates a positive investment after a 20-year lifetime where the net present values of the proposed and base system were £8,207 and £27,523.27 respectively. A roll out scenario of installation across 4,794 crossings was also done where the proposed solution showed to have a lower total whole life cost. Both solutions were modelled for the case study location Coedmawr Farm 2 Level Crossing in Carmarthenshire, Wales where an unprotecting crossing is situated.