亚洲发展中国家BOT项目融资:BOT电力项目结构与风险比较研究

Cho Hyun Chan, Kunishima Masahiko, Yoshida Tsuneaki
{"title":"亚洲发展中国家BOT项目融资:BOT电力项目结构与风险比较研究","authors":"Cho Hyun Chan, Kunishima Masahiko, Yoshida Tsuneaki","doi":"10.2208/PROCM.5.93","DOIUrl":null,"url":null,"abstract":"Since late 1980s, the number of Build-Operate-Transfer (BOT) type infrastructure projects that have been executed in Asia counts approximately 150. To meet the Asia's huge demand in infrastructure development and management, the unique BOT method will be implemented increasingly in the upcoming 21st century. The aim of this paper is to investigate the basic structure and explore the characteristics of the risks involved in the BOT projects located in Asian developing countries. Risks are categorized into nine different groups.Appropriate solutions and methods to reduce and manage each risk are also discussed. Fiveactual power projects from Asian developing countries are selected for a comparative study. 【Keyword】: Build-Operate-Transfer (BOT), Asian developing countries, structure, risks, solutions","PeriodicalId":245964,"journal":{"name":"Doboku Gakkai Ronbunshuu F","volume":"33 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1997-11-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"4","resultStr":"{\"title\":\"Build Operate Transfer (BOT) Project Financing in Asian Developing Countries:Comparative Study on the Structure and Risks in BOT Power Projects\",\"authors\":\"Cho Hyun Chan, Kunishima Masahiko, Yoshida Tsuneaki\",\"doi\":\"10.2208/PROCM.5.93\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Since late 1980s, the number of Build-Operate-Transfer (BOT) type infrastructure projects that have been executed in Asia counts approximately 150. To meet the Asia's huge demand in infrastructure development and management, the unique BOT method will be implemented increasingly in the upcoming 21st century. The aim of this paper is to investigate the basic structure and explore the characteristics of the risks involved in the BOT projects located in Asian developing countries. Risks are categorized into nine different groups.Appropriate solutions and methods to reduce and manage each risk are also discussed. Fiveactual power projects from Asian developing countries are selected for a comparative study. 【Keyword】: Build-Operate-Transfer (BOT), Asian developing countries, structure, risks, solutions\",\"PeriodicalId\":245964,\"journal\":{\"name\":\"Doboku Gakkai Ronbunshuu F\",\"volume\":\"33 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1997-11-30\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"4\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Doboku Gakkai Ronbunshuu F\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.2208/PROCM.5.93\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Doboku Gakkai Ronbunshuu F","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2208/PROCM.5.93","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 4

摘要

自20世纪80年代末以来,亚洲已实施的建设-运营-转让(BOT)型基础设施项目约为150个。为了满足亚洲在基础设施建设和管理方面的巨大需求,在即将到来的21世纪,独特的BOT方式将越来越多地得到实施。本文旨在探讨亚洲发展中国家BOT项目的基本结构和风险特征。风险被分为九个不同的类别。本文还讨论了减少和管理每种风险的适当解决方案和方法。选取亚洲发展中国家的五个实际电力项目进行比较研究。【关键词】:建设-经营-转让(BOT);亚洲发展中国家;结构
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Build Operate Transfer (BOT) Project Financing in Asian Developing Countries:Comparative Study on the Structure and Risks in BOT Power Projects
Since late 1980s, the number of Build-Operate-Transfer (BOT) type infrastructure projects that have been executed in Asia counts approximately 150. To meet the Asia's huge demand in infrastructure development and management, the unique BOT method will be implemented increasingly in the upcoming 21st century. The aim of this paper is to investigate the basic structure and explore the characteristics of the risks involved in the BOT projects located in Asian developing countries. Risks are categorized into nine different groups.Appropriate solutions and methods to reduce and manage each risk are also discussed. Fiveactual power projects from Asian developing countries are selected for a comparative study. 【Keyword】: Build-Operate-Transfer (BOT), Asian developing countries, structure, risks, solutions
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Numerical Simulation of Ground Deformation due to Pneumatic Caisson Tunnel Applicability of ethanol bentonite slurry as a grout in rock mass REDUCTION EFFECT OF SHEET PILE WALLS ON GROUND VIBRATION AND ITS ANALYSIS OF VIBRATION AMPLITUDE PHENOMENON STABILITY AND DETERIORATION OF SHOTCRETED SLOPES COMPARISON TESTS OF CRACK CONTROL METHODS ON TUNNEL CONCRETE LINING MODEL
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1