利用快节奏完成项目的方法(案例研究:多功能建筑项目,西加里曼丹省)

Wiwik Wiharti, L. Winanda, Munasih Munasih, Maranatha Wijayaningtyas
{"title":"利用快节奏完成项目的方法(案例研究:多功能建筑项目,西加里曼丹省)","authors":"Wiwik Wiharti, L. Winanda, Munasih Munasih, Maranatha Wijayaningtyas","doi":"10.19184/jrsl.v6i1.31286","DOIUrl":null,"url":null,"abstract":"Construction projects have unique, dynamic, and complex characteristics; therefore, frequent inaccuracies between planning and implementation are found. It generates a budget change as a consequence. Project delays also occurred in Entikong PLBN Multi Purposes Building Project, West Kalimantan; therefore, an “addendum” time had to be submitted for the 31st week. According to the identified problems, the purpose of this study is to analyze the time acceleration to achieve project time reduction and cost savings. The analytical approach uses a fast-track method widely applied and proven effective in time reduction through overlapping the critical activities. The result of the project schedule shows that the normal duration of 359 days turned into 302 days; therefore, a reduction in time of 57 days can be obtained. Time reduction through project acceleration was 15,88% without causing an overallocated resource. The time reduction impacts project cost efficiency, especially in indirect cost savings of Rp 17.345.955. Implementing the fast-track method by paying attention to the allocation and availability of resources provides an optimal schedule. Thus, the risk of unrealized activities due to acceleration can be minimized. \nABSTRAK \nProyek konstruksi memiliki karakteritik unik, dinamis dan kompleks,sehingga sering ditemukan ketidaktepatan antara perencanaan dan pelaksanaan. Pada saat waktu penyelesaian proyek tidak sesuai dengan perencanaan, hal ini membawa konsekuensi pada perubahan pembiayaan proyek. Keterlambatan proyek juga terjadi pada proyek gedung serbaguna PLBN Entikong, Kalimantan Barat sehingga harus dilakukan addendum waktu pada minggu ke-31. Berdasarkan pada permasalahan yang teridentifikasi, maka tujuan dari penelitian ini adalah menganalisis percepatan waktu sehingga diperoleh pengurangan waktu pekerjaan dan penghematan biaya proyek. Pendekatan analisis menggunakan metode fast-track dimana telah banyak diimplementasikan dan terbukti secara efektif dalam mereduksi waktu penyelesaian dengan menata aktivitas-aktivitas kritis secara tumpang tindih (overlapping). Hasil penjadwalan proyek menunjukkan bahwa durasi normal proyek selama 359 hari menjadi 302 hari, sehingga terjadi reduksi sebanyak 57 hari. Pengurangan waktu dengan melakukan percepatan adalah sebesar 15,88% tanpa menyebabkan overallocated sumber daya. Pengurangan waktu berdampak pada efisiensi biaya proyek, yaitu penghematan biaya tidak langsung sebesar Rp 17.345.955. Penerapan metode fast-track dengan memperhatikan alokasi dan ketersediaan sumber daya, dapat memberikan jadwal yang optimal. Dengan demikian resiko tidak terlaksananya aktivitas akibat percepatan dapat diminimalkan. ","PeriodicalId":247229,"journal":{"name":"Jurnal Rekayasa Sipil dan Lingkungan","volume":"13 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-06-25","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Percepatan Penyelesaian Proyek Menggunakan Metode Fast-Track (Studi Kasus: Proyek Gedung Serbaguna PLBN Entikong Kalimantan Barat)\",\"authors\":\"Wiwik Wiharti, L. Winanda, Munasih Munasih, Maranatha Wijayaningtyas\",\"doi\":\"10.19184/jrsl.v6i1.31286\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Construction projects have unique, dynamic, and complex characteristics; therefore, frequent inaccuracies between planning and implementation are found. It generates a budget change as a consequence. Project delays also occurred in Entikong PLBN Multi Purposes Building Project, West Kalimantan; therefore, an “addendum” time had to be submitted for the 31st week. According to the identified problems, the purpose of this study is to analyze the time acceleration to achieve project time reduction and cost savings. The analytical approach uses a fast-track method widely applied and proven effective in time reduction through overlapping the critical activities. The result of the project schedule shows that the normal duration of 359 days turned into 302 days; therefore, a reduction in time of 57 days can be obtained. Time reduction through project acceleration was 15,88% without causing an overallocated resource. The time reduction impacts project cost efficiency, especially in indirect cost savings of Rp 17.345.955. Implementing the fast-track method by paying attention to the allocation and availability of resources provides an optimal schedule. Thus, the risk of unrealized activities due to acceleration can be minimized. \\nABSTRAK \\nProyek konstruksi memiliki karakteritik unik, dinamis dan kompleks,sehingga sering ditemukan ketidaktepatan antara perencanaan dan pelaksanaan. Pada saat waktu penyelesaian proyek tidak sesuai dengan perencanaan, hal ini membawa konsekuensi pada perubahan pembiayaan proyek. Keterlambatan proyek juga terjadi pada proyek gedung serbaguna PLBN Entikong, Kalimantan Barat sehingga harus dilakukan addendum waktu pada minggu ke-31. Berdasarkan pada permasalahan yang teridentifikasi, maka tujuan dari penelitian ini adalah menganalisis percepatan waktu sehingga diperoleh pengurangan waktu pekerjaan dan penghematan biaya proyek. Pendekatan analisis menggunakan metode fast-track dimana telah banyak diimplementasikan dan terbukti secara efektif dalam mereduksi waktu penyelesaian dengan menata aktivitas-aktivitas kritis secara tumpang tindih (overlapping). Hasil penjadwalan proyek menunjukkan bahwa durasi normal proyek selama 359 hari menjadi 302 hari, sehingga terjadi reduksi sebanyak 57 hari. Pengurangan waktu dengan melakukan percepatan adalah sebesar 15,88% tanpa menyebabkan overallocated sumber daya. Pengurangan waktu berdampak pada efisiensi biaya proyek, yaitu penghematan biaya tidak langsung sebesar Rp 17.345.955. Penerapan metode fast-track dengan memperhatikan alokasi dan ketersediaan sumber daya, dapat memberikan jadwal yang optimal. Dengan demikian resiko tidak terlaksananya aktivitas akibat percepatan dapat diminimalkan. \",\"PeriodicalId\":247229,\"journal\":{\"name\":\"Jurnal Rekayasa Sipil dan Lingkungan\",\"volume\":\"13 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2022-06-25\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Jurnal Rekayasa Sipil dan Lingkungan\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.19184/jrsl.v6i1.31286\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Jurnal Rekayasa Sipil dan Lingkungan","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.19184/jrsl.v6i1.31286","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

建设项目具有独特性、动态性和复杂性;因此,经常发现计划和实施之间的不准确。因此,它会导致预算变化。西加里曼丹的Entikong PLBN多功能建筑项目也出现了项目延误;因此,必须提出第31周的“增编”时间。根据发现的问题,本研究的目的是分析时间加速,以实现项目时间缩短和成本节约。分析方法采用了一种快速通道方法,该方法通过重叠关键活动,在减少时间方面得到了广泛的应用和证明。项目进度结果显示,正常工期359天变为302天;因此,可以减少57天的时间。通过项目加速减少了15.88%的时间,而且没有造成资源的过度分配。时间的减少影响了项目的成本效率,特别是间接成本节约Rp 17.345.955。通过关注资源的分配和可用性,实现快速通道方法提供了最优调度。因此,由于加速导致的未实现活动的风险可以最小化。摘要/ abstract摘要/ abstract摘要/ abstract摘要/ abstract摘要/ abstract摘要/ abstractPada saat waktu penyelesaian proyek tidak sesuai dengan perencanan, hal ini membawa konsekuensi Pada perubahan pembiayaan proyek。加里曼丹,加里曼丹Barat sehinga harus dilakukan附录waktu pada minggu ke-31。Berdasarkan pada permasalahan yang teridentifikasi, maka tujuan dari penelitian ini adalalis menganalis percepatan waktu sehinga diperoleh pengurangan waktu pekerjaan dan penghematan biaya proyek。Pendekatan analysis menggunakan method快速通道dimana telah banyak diimplementasikan dan terbukti secara efektif dalam mereduksi waktu penyelesaian dengan menata activitas aktivitas kritis secara tumpang tindih(重叠)。Hasil penjadwalan proyek menunjukkan bahwa durasi正常proyek selama 359 hari menjadi 302 hari, sehinga terjadi reduksi sebanyak 57 hari。Pengurangan waktu dengan melakukan percepatan adalah sebesar 15,88%的tanpa menyebabkan过度分配的天数。Pengurangan waktu berdampak pada efisiensi biaya proyek, yitu penghuran biaya tidak langsung sebesar Rp 17.345.955。Penerapan方法快速跟踪登根成员alokasi和ketersediaan和sumdaya,登根成员jadwalyang最优。登甘德米克人的智慧与智慧是一种智慧与智慧,是一种智慧与智慧。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Percepatan Penyelesaian Proyek Menggunakan Metode Fast-Track (Studi Kasus: Proyek Gedung Serbaguna PLBN Entikong Kalimantan Barat)
Construction projects have unique, dynamic, and complex characteristics; therefore, frequent inaccuracies between planning and implementation are found. It generates a budget change as a consequence. Project delays also occurred in Entikong PLBN Multi Purposes Building Project, West Kalimantan; therefore, an “addendum” time had to be submitted for the 31st week. According to the identified problems, the purpose of this study is to analyze the time acceleration to achieve project time reduction and cost savings. The analytical approach uses a fast-track method widely applied and proven effective in time reduction through overlapping the critical activities. The result of the project schedule shows that the normal duration of 359 days turned into 302 days; therefore, a reduction in time of 57 days can be obtained. Time reduction through project acceleration was 15,88% without causing an overallocated resource. The time reduction impacts project cost efficiency, especially in indirect cost savings of Rp 17.345.955. Implementing the fast-track method by paying attention to the allocation and availability of resources provides an optimal schedule. Thus, the risk of unrealized activities due to acceleration can be minimized. ABSTRAK Proyek konstruksi memiliki karakteritik unik, dinamis dan kompleks,sehingga sering ditemukan ketidaktepatan antara perencanaan dan pelaksanaan. Pada saat waktu penyelesaian proyek tidak sesuai dengan perencanaan, hal ini membawa konsekuensi pada perubahan pembiayaan proyek. Keterlambatan proyek juga terjadi pada proyek gedung serbaguna PLBN Entikong, Kalimantan Barat sehingga harus dilakukan addendum waktu pada minggu ke-31. Berdasarkan pada permasalahan yang teridentifikasi, maka tujuan dari penelitian ini adalah menganalisis percepatan waktu sehingga diperoleh pengurangan waktu pekerjaan dan penghematan biaya proyek. Pendekatan analisis menggunakan metode fast-track dimana telah banyak diimplementasikan dan terbukti secara efektif dalam mereduksi waktu penyelesaian dengan menata aktivitas-aktivitas kritis secara tumpang tindih (overlapping). Hasil penjadwalan proyek menunjukkan bahwa durasi normal proyek selama 359 hari menjadi 302 hari, sehingga terjadi reduksi sebanyak 57 hari. Pengurangan waktu dengan melakukan percepatan adalah sebesar 15,88% tanpa menyebabkan overallocated sumber daya. Pengurangan waktu berdampak pada efisiensi biaya proyek, yaitu penghematan biaya tidak langsung sebesar Rp 17.345.955. Penerapan metode fast-track dengan memperhatikan alokasi dan ketersediaan sumber daya, dapat memberikan jadwal yang optimal. Dengan demikian resiko tidak terlaksananya aktivitas akibat percepatan dapat diminimalkan. 
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Penilaian Kriteria Green Building Pada Gedung Pusat Layanan Haji dan Umrah Terpadu (PLHUT) Kota Langsa Berdasarkan Penilaian Greenship Identifikasi dan Analisis Efektivitas Penanganan Blackspot di Jalan Perkotaan (Studi Kasus: Kota Depok) Perancangan Rainwater Harvesting dengan Communal Rainwater Tank di Desa Baturinggit Kabupaten Karangasem Pengembangan Sistem Lidar Pendeteksi Jarak Aman Berkendara Analisis Perubahan Tata Guna Lahan Pada DAS Tanggul Menggunakan Remote Sensing
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1