{"title":"基于两阶段随机规划的高压电极锅炉联合燃煤机组参与调频服务的最优经济调度方法","authors":"Pengfei Zhang, Shunchao Wang, Zhao He, Tuo Zhou, Hua Ye, Ning Zhang","doi":"10.1109/REPE52765.2021.9617065","DOIUrl":null,"url":null,"abstract":"In order to adapt the intermittency and volatility of renewable energy in power system, it is necessary to improve the frequency regulation ability of the existing large-scale coal-fired power units, which is significant to system stability and flexibility. Flexible energy facilities, such as high-voltage electrode boiler, can be integrated into coal-fired power units to participate in frequency regulation service. One of the key issues of the integrated scheme is how to dispatch high-voltage electrode boiler properly. To achieve it, this paper proposes an optimal economic scheduling approach for electrode boilers based on two-stage stochastic programming. Statistical characteristics of the AGC signal, the auxiliary service market rules and performances of different units are fully considered in the process. We finally determine the optimal operating base point and output of the electrode boiler in frequency regulation. Compared with the stochastic simulation using Monte Carlo approach, this approach is much less computationally heavy and easier to implement. A power plant case shows that the reasonable scheduling of the highvoltage electrode boiler using the proposed approach can realize the complementary advantages of different units, thereby efficiently improving the regulation performance and revenue.","PeriodicalId":136285,"journal":{"name":"2021 IEEE 4th International Conference on Renewable Energy and Power Engineering (REPE)","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2021-10-09","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Optimal Economic Dispatching Approach of High-Voltage Electrode Boiler Combined with Coal-Fired Power Units to Participate in Frequency Regulation Service Based on Two-Stage Stochastic Programming\",\"authors\":\"Pengfei Zhang, Shunchao Wang, Zhao He, Tuo Zhou, Hua Ye, Ning Zhang\",\"doi\":\"10.1109/REPE52765.2021.9617065\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"In order to adapt the intermittency and volatility of renewable energy in power system, it is necessary to improve the frequency regulation ability of the existing large-scale coal-fired power units, which is significant to system stability and flexibility. Flexible energy facilities, such as high-voltage electrode boiler, can be integrated into coal-fired power units to participate in frequency regulation service. One of the key issues of the integrated scheme is how to dispatch high-voltage electrode boiler properly. To achieve it, this paper proposes an optimal economic scheduling approach for electrode boilers based on two-stage stochastic programming. Statistical characteristics of the AGC signal, the auxiliary service market rules and performances of different units are fully considered in the process. We finally determine the optimal operating base point and output of the electrode boiler in frequency regulation. Compared with the stochastic simulation using Monte Carlo approach, this approach is much less computationally heavy and easier to implement. A power plant case shows that the reasonable scheduling of the highvoltage electrode boiler using the proposed approach can realize the complementary advantages of different units, thereby efficiently improving the regulation performance and revenue.\",\"PeriodicalId\":136285,\"journal\":{\"name\":\"2021 IEEE 4th International Conference on Renewable Energy and Power Engineering (REPE)\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2021-10-09\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2021 IEEE 4th International Conference on Renewable Energy and Power Engineering (REPE)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/REPE52765.2021.9617065\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2021 IEEE 4th International Conference on Renewable Energy and Power Engineering (REPE)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/REPE52765.2021.9617065","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

为了适应电力系统中可再生能源的间歇性和波动性,有必要提高现有大型燃煤发电机组的频率调节能力,这对系统的稳定性和灵活性具有重要意义。可将高压电极锅炉等柔性能源设施纳入燃煤机组参与调频服务。高压电极锅炉的合理调度是该方案的关键问题之一。为此,提出了一种基于两阶段随机规划的电极锅炉最优经济调度方法。在此过程中充分考虑了AGC信号的统计特性、辅助服务市场规律和不同单位的性能。最后确定了调频时电极锅炉的最佳运行基点和输出功率。与蒙特卡罗随机模拟方法相比,该方法计算量小,易于实现。电厂实例表明,采用该方法对高压电极锅炉进行合理调度,可以实现不同机组的优势互补,从而有效地提高调节性能和收益。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Optimal Economic Dispatching Approach of High-Voltage Electrode Boiler Combined with Coal-Fired Power Units to Participate in Frequency Regulation Service Based on Two-Stage Stochastic Programming
In order to adapt the intermittency and volatility of renewable energy in power system, it is necessary to improve the frequency regulation ability of the existing large-scale coal-fired power units, which is significant to system stability and flexibility. Flexible energy facilities, such as high-voltage electrode boiler, can be integrated into coal-fired power units to participate in frequency regulation service. One of the key issues of the integrated scheme is how to dispatch high-voltage electrode boiler properly. To achieve it, this paper proposes an optimal economic scheduling approach for electrode boilers based on two-stage stochastic programming. Statistical characteristics of the AGC signal, the auxiliary service market rules and performances of different units are fully considered in the process. We finally determine the optimal operating base point and output of the electrode boiler in frequency regulation. Compared with the stochastic simulation using Monte Carlo approach, this approach is much less computationally heavy and easier to implement. A power plant case shows that the reasonable scheduling of the highvoltage electrode boiler using the proposed approach can realize the complementary advantages of different units, thereby efficiently improving the regulation performance and revenue.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Research on the Movement and Partial Discharge Characteristic of Free Metal Particles in GIS Stochastic Modeling of Irradiation, Applied to Investment Decision in a Photovoltaic Project Subject to Regulatory Shortfall Penalty Rules Studies on Diode Effects in Photovoltaic Array under Partial Shading Condition Designing and Controlling Power Management Module for Electro-Dynamic Screens Influence of Basin Insulator on Transmission Characteristics of UHF Signal in GIS
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1