石油生产设施综合控制和资产管理的多代理系统。第3部分:性能分析和系统限制

Atalla F. Sayda, James H. Taylor
{"title":"石油生产设施综合控制和资产管理的多代理系统。第3部分:性能分析和系统限制","authors":"Atalla F. Sayda, James H. Taylor","doi":"10.1109/ISIC.2008.4635952","DOIUrl":null,"url":null,"abstract":"This three-part paper thoroughly addresses the design and development of multi-agent system for asset management for the petroleum industry, which is crucial for profitable oil and gas facilities operations and maintenance. A research project was initiated to study the feasibility of an intelligent asset management system. Having proposed a conceptual model, architecture, and implementation plan for such a system in previous work (J.H. Taylor and A.F. Sayda, 2005), (A.F. Sayda and J.H. Taylor, 2006), defined its autonomy, communications, and artificial intelligence (AI) requirements and initiated the preliminary design of a simple system prototype (J.H. Taylor and A.F. Sayda, 2008), we are extending the build of a system prototype and simulate it in real-time to validate its logical behavior in normal and abnormal process situations and analyze its performance. The third-part paper addresses the ICAM system prototype validation in terms of system performance analysis and system behavior during unexpected situations.","PeriodicalId":342070,"journal":{"name":"2008 IEEE International Symposium on Intelligent Control","volume":"103 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2008-09-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":"{\"title\":\"A Multi-agent System for Integrated Control and Asset Management of Petroleum Production Facilities - Part 3: Performance Analysis and System Limitations\",\"authors\":\"Atalla F. Sayda, James H. Taylor\",\"doi\":\"10.1109/ISIC.2008.4635952\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This three-part paper thoroughly addresses the design and development of multi-agent system for asset management for the petroleum industry, which is crucial for profitable oil and gas facilities operations and maintenance. A research project was initiated to study the feasibility of an intelligent asset management system. Having proposed a conceptual model, architecture, and implementation plan for such a system in previous work (J.H. Taylor and A.F. Sayda, 2005), (A.F. Sayda and J.H. Taylor, 2006), defined its autonomy, communications, and artificial intelligence (AI) requirements and initiated the preliminary design of a simple system prototype (J.H. Taylor and A.F. Sayda, 2008), we are extending the build of a system prototype and simulate it in real-time to validate its logical behavior in normal and abnormal process situations and analyze its performance. The third-part paper addresses the ICAM system prototype validation in terms of system performance analysis and system behavior during unexpected situations.\",\"PeriodicalId\":342070,\"journal\":{\"name\":\"2008 IEEE International Symposium on Intelligent Control\",\"volume\":\"103 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2008-09-30\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"2\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2008 IEEE International Symposium on Intelligent Control\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ISIC.2008.4635952\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2008 IEEE International Symposium on Intelligent Control","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ISIC.2008.4635952","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2

摘要

本文由三部分组成,详细介绍了石油行业资产管理多代理系统的设计和开发,这对于油气设施的运营和维护至关重要。启动了一个研究项目,研究智能资产管理系统的可行性。在之前的工作(J.H. Taylor and A.F. Sayda, 2005)和(A.F. Sayda and J.H. Taylor, 2006)中提出了这样一个系统的概念模型、架构和实施计划,定义了其自主性、通信和人工智能(AI)需求,并启动了一个简单系统原型的初步设计(J.H. Taylor and A.F. Sayda, 2008)。我们正在扩展系统原型的构建,并对其进行实时仿真,以验证其在正常和异常过程情况下的逻辑行为,并分析其性能。论文的第三部分从系统性能分析和系统在意外情况下的行为方面阐述了ICAM系统原型验证。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
A Multi-agent System for Integrated Control and Asset Management of Petroleum Production Facilities - Part 3: Performance Analysis and System Limitations
This three-part paper thoroughly addresses the design and development of multi-agent system for asset management for the petroleum industry, which is crucial for profitable oil and gas facilities operations and maintenance. A research project was initiated to study the feasibility of an intelligent asset management system. Having proposed a conceptual model, architecture, and implementation plan for such a system in previous work (J.H. Taylor and A.F. Sayda, 2005), (A.F. Sayda and J.H. Taylor, 2006), defined its autonomy, communications, and artificial intelligence (AI) requirements and initiated the preliminary design of a simple system prototype (J.H. Taylor and A.F. Sayda, 2008), we are extending the build of a system prototype and simulate it in real-time to validate its logical behavior in normal and abnormal process situations and analyze its performance. The third-part paper addresses the ICAM system prototype validation in terms of system performance analysis and system behavior during unexpected situations.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Hybrid Intelligent Control Scheme for Activated Sludge Wastewater Treatment Deterministic Learning and Rapid Dynamical Pattern Recognition of Discrete-Time Systems Dynamic Mode, Probe Based High Density Data Storage: A collaborative effort with IBM, Zurich Research Labs A Multi-agent System for Integrated Control and Asset Management of Petroleum Production Facilities - Part 2: Prototype Design Verification Discrete-time Neural Network Control for a Linear Induction Motor
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1