{"title":"将非优先操作外包给第三方机构","authors":"Lianmin Zhang, Xiaoqiang Cai","doi":"10.1109/ICSSSM.2013.6602614","DOIUrl":null,"url":null,"abstract":"We consider the problem where a group of manufacturers outsource non-preemptive operations to a third-party, where non-preemptive operations means processing operations can not be interrupted when it starts, such as mould making, blast furnace iron making. The manufacturers book time windows announced by third-party with prices and schedule operations in the booked time window. The cost for each manufacturer consists of booking and work-in-progress costs. We address some optimal decision for manufacturers to book time windows and schedule their jobs in the booked time windows so as to minimize their individual cost.","PeriodicalId":354195,"journal":{"name":"2013 10th International Conference on Service Systems and Service Management","volume":"41 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2013-07-17","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Outsourcing non-preemptive operations to a third-party facility\",\"authors\":\"Lianmin Zhang, Xiaoqiang Cai\",\"doi\":\"10.1109/ICSSSM.2013.6602614\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"We consider the problem where a group of manufacturers outsource non-preemptive operations to a third-party, where non-preemptive operations means processing operations can not be interrupted when it starts, such as mould making, blast furnace iron making. The manufacturers book time windows announced by third-party with prices and schedule operations in the booked time window. The cost for each manufacturer consists of booking and work-in-progress costs. We address some optimal decision for manufacturers to book time windows and schedule their jobs in the booked time windows so as to minimize their individual cost.\",\"PeriodicalId\":354195,\"journal\":{\"name\":\"2013 10th International Conference on Service Systems and Service Management\",\"volume\":\"41 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2013-07-17\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2013 10th International Conference on Service Systems and Service Management\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ICSSSM.2013.6602614\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2013 10th International Conference on Service Systems and Service Management","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICSSSM.2013.6602614","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Outsourcing non-preemptive operations to a third-party facility
We consider the problem where a group of manufacturers outsource non-preemptive operations to a third-party, where non-preemptive operations means processing operations can not be interrupted when it starts, such as mould making, blast furnace iron making. The manufacturers book time windows announced by third-party with prices and schedule operations in the booked time window. The cost for each manufacturer consists of booking and work-in-progress costs. We address some optimal decision for manufacturers to book time windows and schedule their jobs in the booked time windows so as to minimize their individual cost.