{"title":"泗水西外环线排水分析","authors":"Danayanti Azmi Dewi Nusantara, F. Nadiar, N. F. Margini","doi":"10.30736/cvl.v8i1.1050","DOIUrl":null,"url":null,"abstract":"The development of West Outer Ring Road, abbreviated as JLLB, to improve the quality of infrastructure in the City of Surabaya. A breakthrough is needed by opening a new existing road section to break down traffic jams that lead to the main corridor section of the central city. The JLLB area, originally a green open area, was converted into a road area. This condition will cause changes in the sum of rainwater runoff that occur. The JLLB also intersects with the railroad tracks. A drainage system plan to ensure no puddles on the road, even through the railroad tracks. The method of this study follows hydrological and hydraulics analysis of the drainage systems. The results of drainage analysis on West Outer Ring Road, abbreviated as JLLB, there are several typical canal dimensions needed. All velocities can be controlled in the range of permissible velocity. The minimum velocity is 0,4 m/sec, and the maximum is 0,873 m/sec. The maximum planned discharge is 1,381 m3/sec. The capacity of boezem is planned to suit 5,104 hr of rain duration. Based on all that results, the drainage analysis of JLLB would be great if implemented according to plan.","PeriodicalId":282199,"journal":{"name":"Civilla : Jurnal Teknik Sipil Universitas Islam Lamongan","volume":"177 3","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-03-20","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Drainage Analysis of the West Outer Ring Road Surabaya\",\"authors\":\"Danayanti Azmi Dewi Nusantara, F. Nadiar, N. F. Margini\",\"doi\":\"10.30736/cvl.v8i1.1050\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The development of West Outer Ring Road, abbreviated as JLLB, to improve the quality of infrastructure in the City of Surabaya. A breakthrough is needed by opening a new existing road section to break down traffic jams that lead to the main corridor section of the central city. The JLLB area, originally a green open area, was converted into a road area. This condition will cause changes in the sum of rainwater runoff that occur. The JLLB also intersects with the railroad tracks. A drainage system plan to ensure no puddles on the road, even through the railroad tracks. The method of this study follows hydrological and hydraulics analysis of the drainage systems. The results of drainage analysis on West Outer Ring Road, abbreviated as JLLB, there are several typical canal dimensions needed. All velocities can be controlled in the range of permissible velocity. The minimum velocity is 0,4 m/sec, and the maximum is 0,873 m/sec. The maximum planned discharge is 1,381 m3/sec. The capacity of boezem is planned to suit 5,104 hr of rain duration. Based on all that results, the drainage analysis of JLLB would be great if implemented according to plan.\",\"PeriodicalId\":282199,\"journal\":{\"name\":\"Civilla : Jurnal Teknik Sipil Universitas Islam Lamongan\",\"volume\":\"177 3\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-03-20\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Civilla : Jurnal Teknik Sipil Universitas Islam Lamongan\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.30736/cvl.v8i1.1050\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Civilla : Jurnal Teknik Sipil Universitas Islam Lamongan","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.30736/cvl.v8i1.1050","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

开发西外环,简称JLLB,以提高泗水市的基础设施质量。为了打破通往中心城市主干道的交通堵塞,需要开辟一条新的道路。JLLB区域原本是一个绿色开放区域,被改造成一个道路区域。这种情况将导致发生的雨水径流总量的变化。JLLB也与铁路轨道相交。一个排水系统计划,以确保道路上没有水坑,即使通过铁路轨道。本研究的方法遵循排水系统的水文和水力学分析。西外环线(简称JLLB)的排水分析结果表明,需要几个典型的运河尺寸。所有的速度都可以控制在允许的速度范围内。最小速度为0.4 m/s,最大速度为0.873 m/s。最大计划流量为1381立方米/秒。boezem的容量计划适合5,104小时的降雨持续时间。基于这些结果,如果按计划实施,JLLB的排水分析将是非常好的。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Drainage Analysis of the West Outer Ring Road Surabaya
The development of West Outer Ring Road, abbreviated as JLLB, to improve the quality of infrastructure in the City of Surabaya. A breakthrough is needed by opening a new existing road section to break down traffic jams that lead to the main corridor section of the central city. The JLLB area, originally a green open area, was converted into a road area. This condition will cause changes in the sum of rainwater runoff that occur. The JLLB also intersects with the railroad tracks. A drainage system plan to ensure no puddles on the road, even through the railroad tracks. The method of this study follows hydrological and hydraulics analysis of the drainage systems. The results of drainage analysis on West Outer Ring Road, abbreviated as JLLB, there are several typical canal dimensions needed. All velocities can be controlled in the range of permissible velocity. The minimum velocity is 0,4 m/sec, and the maximum is 0,873 m/sec. The maximum planned discharge is 1,381 m3/sec. The capacity of boezem is planned to suit 5,104 hr of rain duration. Based on all that results, the drainage analysis of JLLB would be great if implemented according to plan.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Analysis of Concrete Strength Analysis K-250 With Additional Asbestos Waste Powder as a Substitute of Fine Aggregate The Shear Strength of Clay Stabilized with Palm Bunch Ash and Cement Evaluation of Wastewater Management System Implementation in Tarakan City Selumit Beach Area Analysis of Determinants of Consumer Decisions on the Use of Trans Banyumas and Gojek Cost and Time Comparison Analysis Using Microsoft Project (Case Study: Phase VII Work of the Surabaya Tanjung Perak Berlian Pier Structure Strengthening Project)
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1