预安装电缆保护器将节省时间,提高完井作业的安全性

J. Bibby, A. Brodie, J. Fiorucci
{"title":"预安装电缆保护器将节省时间,提高完井作业的安全性","authors":"J. Bibby, A. Brodie, J. Fiorucci","doi":"10.2118/215527-ms","DOIUrl":null,"url":null,"abstract":"\n This paper will demonstrate the improved safety advantages, rig time savings and the associated cost reductions available by using pre-installed cable protectors during run-in-hole (RIH) operations for completions where downhole cables are at risk of damage. Pre-installed cable protectors can greatly reduce the number of personnel operating in the ‘red zone’, eliminate costly shipping logistics and reduce the amount of time needed installing cable protectors on the rig floor, thus providing safety benefits and improving RIH timing.","PeriodicalId":130107,"journal":{"name":"Day 1 Tue, September 05, 2023","volume":"1120 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-09-05","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Pre-Installed Cable Protectors Will Save Time and Improve Safety While Running Completions\",\"authors\":\"J. Bibby, A. Brodie, J. Fiorucci\",\"doi\":\"10.2118/215527-ms\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\\n This paper will demonstrate the improved safety advantages, rig time savings and the associated cost reductions available by using pre-installed cable protectors during run-in-hole (RIH) operations for completions where downhole cables are at risk of damage. Pre-installed cable protectors can greatly reduce the number of personnel operating in the ‘red zone’, eliminate costly shipping logistics and reduce the amount of time needed installing cable protectors on the rig floor, thus providing safety benefits and improving RIH timing.\",\"PeriodicalId\":130107,\"journal\":{\"name\":\"Day 1 Tue, September 05, 2023\",\"volume\":\"1120 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-09-05\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Day 1 Tue, September 05, 2023\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.2118/215527-ms\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Day 1 Tue, September 05, 2023","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2118/215527-ms","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

本文将展示在完井作业(RIH)中,在井下电缆存在损坏风险的情况下,使用预装电缆保护器可以提高安全性,节省钻机时间,降低相关成本。预安装电缆保护器可以大大减少在“红色区域”作业的人员数量,消除昂贵的运输物流,减少在钻台安装电缆保护器所需的时间,从而提供安全效益并改善RIH时间。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Pre-Installed Cable Protectors Will Save Time and Improve Safety While Running Completions
This paper will demonstrate the improved safety advantages, rig time savings and the associated cost reductions available by using pre-installed cable protectors during run-in-hole (RIH) operations for completions where downhole cables are at risk of damage. Pre-installed cable protectors can greatly reduce the number of personnel operating in the ‘red zone’, eliminate costly shipping logistics and reduce the amount of time needed installing cable protectors on the rig floor, thus providing safety benefits and improving RIH timing.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
More than just Rules! Safety as a Universal Language- Transition to Industry Life-Saving Rules Embedding Human Performance in Practice Journey Towards Near Zero Flaring - A Case Study Mechanical Umbilical-Less Installation of Tubing Hangers Porthos – CO2 Storage in Highly-Depleted Gas Fields Safe and Successful Gas Hydrate Plug Remediation in Vega Asset – Norwegian Gas Condensate Subsea Production System
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1