{"title":"基于仿真结果的工程机械液压马达剩余寿命预测","authors":"V. Zorin, Nguyen Trong Minh","doi":"10.31044/1684-2561-2023-0-3-15-19","DOIUrl":null,"url":null,"abstract":"Problems of determining the residual life of hydraulic motors, based on the results of simulation. In the course of the investigation, the methods of reliability theory, mathematical statistics and simulation have been used. Predicting the residual life of the hydraulic motors of construction machines is necessary to improve operational reliability, reduce downtime and costs for maintenance and repair of equipment.","PeriodicalId":292405,"journal":{"name":"Repair, Reconditioning, Modernization","volume":"30 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-03-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Prediction of residual life of hydraulic motors of construction machines by results of simulation\",\"authors\":\"V. Zorin, Nguyen Trong Minh\",\"doi\":\"10.31044/1684-2561-2023-0-3-15-19\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Problems of determining the residual life of hydraulic motors, based on the results of simulation. In the course of the investigation, the methods of reliability theory, mathematical statistics and simulation have been used. Predicting the residual life of the hydraulic motors of construction machines is necessary to improve operational reliability, reduce downtime and costs for maintenance and repair of equipment.\",\"PeriodicalId\":292405,\"journal\":{\"name\":\"Repair, Reconditioning, Modernization\",\"volume\":\"30 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-03-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Repair, Reconditioning, Modernization\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.31044/1684-2561-2023-0-3-15-19\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Repair, Reconditioning, Modernization","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.31044/1684-2561-2023-0-3-15-19","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Prediction of residual life of hydraulic motors of construction machines by results of simulation
Problems of determining the residual life of hydraulic motors, based on the results of simulation. In the course of the investigation, the methods of reliability theory, mathematical statistics and simulation have been used. Predicting the residual life of the hydraulic motors of construction machines is necessary to improve operational reliability, reduce downtime and costs for maintenance and repair of equipment.