{"title":"制造系统智能仿真","authors":"N. Baid, N. Nagarur","doi":"10.1109/AIHAS.1992.636873","DOIUrl":null,"url":null,"abstract":"In the present study, an effort is made to achieve integration of simulation and production decision support systems. A three level interdependent planning hierarchy is considered for decision making in a manufacturing environment. An Intelligent Simulation System (ISS), which contains three modules viz. intelligent front end, simulator and intelligent back end, is developed and is linked to an upper level MRP module. SIMANNis usedfor the simulator, while rest of the system is implemented in MS-FORTRAN.","PeriodicalId":442147,"journal":{"name":"Proceedings of the Third Annual Conference of AI, Simulation, and Planning in High Autonomy Systems 'Integrating Perception, Planning and Action'.","volume":"21 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1992-07-08","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Intelligent Simulation for Manufacturing Systems\",\"authors\":\"N. Baid, N. Nagarur\",\"doi\":\"10.1109/AIHAS.1992.636873\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"In the present study, an effort is made to achieve integration of simulation and production decision support systems. A three level interdependent planning hierarchy is considered for decision making in a manufacturing environment. An Intelligent Simulation System (ISS), which contains three modules viz. intelligent front end, simulator and intelligent back end, is developed and is linked to an upper level MRP module. SIMANNis usedfor the simulator, while rest of the system is implemented in MS-FORTRAN.\",\"PeriodicalId\":442147,\"journal\":{\"name\":\"Proceedings of the Third Annual Conference of AI, Simulation, and Planning in High Autonomy Systems 'Integrating Perception, Planning and Action'.\",\"volume\":\"21 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1992-07-08\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Proceedings of the Third Annual Conference of AI, Simulation, and Planning in High Autonomy Systems 'Integrating Perception, Planning and Action'.\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/AIHAS.1992.636873\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of the Third Annual Conference of AI, Simulation, and Planning in High Autonomy Systems 'Integrating Perception, Planning and Action'.","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/AIHAS.1992.636873","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
In the present study, an effort is made to achieve integration of simulation and production decision support systems. A three level interdependent planning hierarchy is considered for decision making in a manufacturing environment. An Intelligent Simulation System (ISS), which contains three modules viz. intelligent front end, simulator and intelligent back end, is developed and is linked to an upper level MRP module. SIMANNis usedfor the simulator, while rest of the system is implemented in MS-FORTRAN.