Alexandro Cortijo-García, María Amelia De-Miguel-Sin-Monge, Jesús Rodríguez-Gamero, M. García-Alberti, Antonio Alfonso Arcos-Álvarez
{"title":"BIM在拱坝建模中的应用= BIM在拱坝建模中的应用","authors":"Alexandro Cortijo-García, María Amelia De-Miguel-Sin-Monge, Jesús Rodríguez-Gamero, M. García-Alberti, Antonio Alfonso Arcos-Álvarez","doi":"10.20868/ade.2021.4971","DOIUrl":null,"url":null,"abstract":"Building Information Modelling (BIM) es una metodología de trabajo basada en la modelización 3D que ofrece a los profesionales involucrados en los proyectos la información y herramientas necesarias para planificar, diseñar, construir y gestionar edificios e infraestructuras. El objetivo principal de este proyecto es el empleo de la metodología BIM para llevar a cabo la modelización de una presa arco-gravedad, partiendo para ello de la superficie de la cuenca y la geometría de la presa en cuestión. Es importante destacar que, según la literatura científica consultada, se trata de una de las primeras experiencias BIM dedicadas a este ámbito de la ingeniería civil, las presas. Esto es todavía más relevante al haber tenido en cuenta su auscultación. En primer lugar, se procedió a modelizar el conjunto presa - terreno. Para ello, se comenzó llevando a cabo la excavación y cuantificación del volumen de tierras necesario para la cimentación de la presa mediante el software de Autodesk, Civil 3D. A continuación, se modeló en Revit la presa arco de considerables dimensiones. Tras representar cada uno de los bloques que conforman la presa, se definieron las galerías y el aliviadero, de labio fijo y perfil creager. Para la gestión de la presa, y de cara a la explotación, se distinguieron diferentes aparatos de auscultación. Mediante DYNAMO se parametrizaron dichos aparatos y se les asoció una serie de datos y resultados en una hoja de cálculo. De esta forma, se hace posible visualizar la evolución de las medidas tomadas a lo largo de su vida útil y en cada una de las horas fijadas, representando gráficamente los valores obtenidos. Finalmente se empleó la aplicación InfraWorks para poder integrar el terreno y la presa arco para la presentación de la solución final.AbstractBuilding Information Modelling (BIM) is a working methodology based on 3D modelling that provides professionals involved in projects with the information and tools necessary to plan, design, construct and manage buildings and infrastructures. The main objective of this project is the use of BIM methodology to carry out the modelling of an arch-gravity dam, starting from the surface of the basin and the geometry of the dam in question. It is important to highlight that, according to the scientific literature consulted, this is one of the first BIM experiences dedicated to this field of civil engineering, dams. This is even more relevant as its auscultation has been taken into account. First, the dam-terrain complex was modelled. To do this, we began by excavating and quantifying the volume of earth required for the dam foundations using Autodesk's Civil 3D software. Next, the arch dam of considerable dimensions was modelled in Revit. After representing each of the blocks that make up the dam, the galleries, and the spillway, with a fixed lip and creager profile, were defined. For the management of the dam, and with a view to its operation, different auscultation devices were distinguished. These devices were parameterised using DYNAMO and a series of data and results were associated with them in a spreadsheet. In this way, it is possible to visualise the evolution of the measurements taken throughout their useful life and at each of the set times, graphically representing the values obtained. Finally, the InfraWorks application was used to integrate the terrain and the arch dam for the presentation of the final solution.","PeriodicalId":296022,"journal":{"name":"Anales de Edificación","volume":"97 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-12-31","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Aplicación de BIM a la modelización de una presa arco = BIM Application to an Arch dam modeling\",\"authors\":\"Alexandro Cortijo-García, María Amelia De-Miguel-Sin-Monge, Jesús Rodríguez-Gamero, M. García-Alberti, Antonio Alfonso Arcos-Álvarez\",\"doi\":\"10.20868/ade.2021.4971\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Building Information Modelling (BIM) es una metodología de trabajo basada en la modelización 3D que ofrece a los profesionales involucrados en los proyectos la información y herramientas necesarias para planificar, diseñar, construir y gestionar edificios e infraestructuras. El objetivo principal de este proyecto es el empleo de la metodología BIM para llevar a cabo la modelización de una presa arco-gravedad, partiendo para ello de la superficie de la cuenca y la geometría de la presa en cuestión. Es importante destacar que, según la literatura científica consultada, se trata de una de las primeras experiencias BIM dedicadas a este ámbito de la ingeniería civil, las presas. Esto es todavía más relevante al haber tenido en cuenta su auscultación. En primer lugar, se procedió a modelizar el conjunto presa - terreno. Para ello, se comenzó llevando a cabo la excavación y cuantificación del volumen de tierras necesario para la cimentación de la presa mediante el software de Autodesk, Civil 3D. A continuación, se modeló en Revit la presa arco de considerables dimensiones. Tras representar cada uno de los bloques que conforman la presa, se definieron las galerías y el aliviadero, de labio fijo y perfil creager. Para la gestión de la presa, y de cara a la explotación, se distinguieron diferentes aparatos de auscultación. Mediante DYNAMO se parametrizaron dichos aparatos y se les asoció una serie de datos y resultados en una hoja de cálculo. De esta forma, se hace posible visualizar la evolución de las medidas tomadas a lo largo de su vida útil y en cada una de las horas fijadas, representando gráficamente los valores obtenidos. Finalmente se empleó la aplicación InfraWorks para poder integrar el terreno y la presa arco para la presentación de la solución final.AbstractBuilding Information Modelling (BIM) is a working methodology based on 3D modelling that provides professionals involved in projects with the information and tools necessary to plan, design, construct and manage buildings and infrastructures. The main objective of this project is the use of BIM methodology to carry out the modelling of an arch-gravity dam, starting from the surface of the basin and the geometry of the dam in question. It is important to highlight that, according to the scientific literature consulted, this is one of the first BIM experiences dedicated to this field of civil engineering, dams. This is even more relevant as its auscultation has been taken into account. First, the dam-terrain complex was modelled. To do this, we began by excavating and quantifying the volume of earth required for the dam foundations using Autodesk's Civil 3D software. Next, the arch dam of considerable dimensions was modelled in Revit. After representing each of the blocks that make up the dam, the galleries, and the spillway, with a fixed lip and creager profile, were defined. For the management of the dam, and with a view to its operation, different auscultation devices were distinguished. These devices were parameterised using DYNAMO and a series of data and results were associated with them in a spreadsheet. In this way, it is possible to visualise the evolution of the measurements taken throughout their useful life and at each of the set times, graphically representing the values obtained. Finally, the InfraWorks application was used to integrate the terrain and the arch dam for the presentation of the final solution.\",\"PeriodicalId\":296022,\"journal\":{\"name\":\"Anales de Edificación\",\"volume\":\"97 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2021-12-31\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Anales de Edificación\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.20868/ade.2021.4971\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Anales de Edificación","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.20868/ade.2021.4971","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
摘要
建筑信息建模(BIM)是一种基于3D建模的工作方法,为参与项目的专业人员提供规划、设计、建造和管理建筑和基础设施所需的信息和工具。这个项目的主要目标是使用BIM方法进行模型猎物arco-gravedad出发,为此和盆地表面几何的三峡大坝。必须强调的是,根据查阅科学文献,最早的专门经验BIM,土木工程领域的猎物。考虑到他们的倾听,这一点就更加重要了。首先,接着模拟整个猎物-地面。为此,我们开始使用Autodesk软件Civil 3D对大坝基础所需的土地进行挖掘和量化。接下来,他Revit猎物大量电弧维度。之后代表每个区块组成,提出了大型水坝和固定溢洪道,唇creager简介。为了管理大坝,为了开发,区分了不同的监听设备。使用发电机对这些设备进行参数化,并将一系列数据和结果关联到电子表格中。通过这种方式,可以可视化在其生命周期和每个固定小时内所采取的措施的演变,并以图形形式表示获得的值。最后,infrworks应用程序被用于整合地形和arco大坝,以呈现最终的解决方案。AbstractBuilding Information情景(BIM) is a working情景3D方法based on that参与projects with the Information and tools提供专业计划,其收益的design, construct and manage建筑物和基础设施。这个项目的主要目标是使用BIM方法,从盆地的表面和所讨论的大坝的几何形状开始,对一个弓形重力大坝进行建模。需要强调的是,根据参考的科学文献,这是第一个致力于土木工程领域的BIM经验之一。这是更相关的,因为它的听力学已经被考虑在内。was First, the dam-terrain complex modelled。塞拉利昂的To do this, we by excavating and quantifying the volume of earth required for the dam 3D软件基础using Autodesk的平民。Next, the arch dam of很大》于Revit modelled维度。之后按每of the街区that make up the dam, the galleries, and the spillway, with a固定lip和creager profile, defined。For the management of the dam and with a view to its operation,设有auscultation devices是distinguished。这些设备被parameterised using DYNAMO and a series of data and成果被相关with them in a spreadsheet。In this way, it单人床to visualise the evolution of the measurements采取推广其有用life and at每of the set times graphically按价值获得。最后,the InfraWorks application was用来将做法and the arch dam for the presentation of the final solution。
Aplicación de BIM a la modelización de una presa arco = BIM Application to an Arch dam modeling
Building Information Modelling (BIM) es una metodología de trabajo basada en la modelización 3D que ofrece a los profesionales involucrados en los proyectos la información y herramientas necesarias para planificar, diseñar, construir y gestionar edificios e infraestructuras. El objetivo principal de este proyecto es el empleo de la metodología BIM para llevar a cabo la modelización de una presa arco-gravedad, partiendo para ello de la superficie de la cuenca y la geometría de la presa en cuestión. Es importante destacar que, según la literatura científica consultada, se trata de una de las primeras experiencias BIM dedicadas a este ámbito de la ingeniería civil, las presas. Esto es todavía más relevante al haber tenido en cuenta su auscultación. En primer lugar, se procedió a modelizar el conjunto presa - terreno. Para ello, se comenzó llevando a cabo la excavación y cuantificación del volumen de tierras necesario para la cimentación de la presa mediante el software de Autodesk, Civil 3D. A continuación, se modeló en Revit la presa arco de considerables dimensiones. Tras representar cada uno de los bloques que conforman la presa, se definieron las galerías y el aliviadero, de labio fijo y perfil creager. Para la gestión de la presa, y de cara a la explotación, se distinguieron diferentes aparatos de auscultación. Mediante DYNAMO se parametrizaron dichos aparatos y se les asoció una serie de datos y resultados en una hoja de cálculo. De esta forma, se hace posible visualizar la evolución de las medidas tomadas a lo largo de su vida útil y en cada una de las horas fijadas, representando gráficamente los valores obtenidos. Finalmente se empleó la aplicación InfraWorks para poder integrar el terreno y la presa arco para la presentación de la solución final.AbstractBuilding Information Modelling (BIM) is a working methodology based on 3D modelling that provides professionals involved in projects with the information and tools necessary to plan, design, construct and manage buildings and infrastructures. The main objective of this project is the use of BIM methodology to carry out the modelling of an arch-gravity dam, starting from the surface of the basin and the geometry of the dam in question. It is important to highlight that, according to the scientific literature consulted, this is one of the first BIM experiences dedicated to this field of civil engineering, dams. This is even more relevant as its auscultation has been taken into account. First, the dam-terrain complex was modelled. To do this, we began by excavating and quantifying the volume of earth required for the dam foundations using Autodesk's Civil 3D software. Next, the arch dam of considerable dimensions was modelled in Revit. After representing each of the blocks that make up the dam, the galleries, and the spillway, with a fixed lip and creager profile, were defined. For the management of the dam, and with a view to its operation, different auscultation devices were distinguished. These devices were parameterised using DYNAMO and a series of data and results were associated with them in a spreadsheet. In this way, it is possible to visualise the evolution of the measurements taken throughout their useful life and at each of the set times, graphically representing the values obtained. Finally, the InfraWorks application was used to integrate the terrain and the arch dam for the presentation of the final solution.