参与印尼跨苏门答腊收费公路建设的公司是如何运作的?角色分析和发展政策

Vera Finidia Indah, Budiman Rusli, Rita Myrna, Zaidan Nawawi
{"title":"参与印尼跨苏门答腊收费公路建设的公司是如何运作的?角色分析和发展政策","authors":"Vera Finidia Indah, Budiman Rusli, Rita Myrna, Zaidan Nawawi","doi":"10.24294/jipd.v7i3.2588","DOIUrl":null,"url":null,"abstract":"Toll road infrastructure development is one of the development priorities of the government of Indonesia a developed country. To develop toll road infrastructure to run smoothly, it is necessary to involve the government and the private sector. This research aims to analyze the role of the government and land acquisition constraints in the construction of the trans Sumatra toll road. This research uses a qualitative-explorative method to explore the research topic. Determination of the research topic is done by using biblioshiny application analysis. Then the data is collected from observation, documents from the website, and applicable literature. The data collected was then analyzed using Nvivo 12 Pro Software and Vensim PLE X64 Software to provide accurate and systematic visualization and description. The results of this study found that the trans Sumatra toll road construction project is a national development project. Then the cooperation relationship carried out by the government in the construction of the trans Sumatra toll road is regulated through policies that run in 2014–Present. The companies involved in accelerating the construction of the trans-Sumatra toll road are PT Hutama Karya and PT Waskita Sriwijaya Tol. Another finding in this study is that there are still toll road sections that have not operated and have been stopped due to customary land acquisition issues.","PeriodicalId":41907,"journal":{"name":"Journal of Infrastructure Policy and Development","volume":null,"pages":null},"PeriodicalIF":1.0000,"publicationDate":"2023-11-10","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"How are companies involved in the construction of the trans Sumatra toll road, in Indonesia? Role analysis and development policy\",\"authors\":\"Vera Finidia Indah, Budiman Rusli, Rita Myrna, Zaidan Nawawi\",\"doi\":\"10.24294/jipd.v7i3.2588\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Toll road infrastructure development is one of the development priorities of the government of Indonesia a developed country. To develop toll road infrastructure to run smoothly, it is necessary to involve the government and the private sector. This research aims to analyze the role of the government and land acquisition constraints in the construction of the trans Sumatra toll road. This research uses a qualitative-explorative method to explore the research topic. Determination of the research topic is done by using biblioshiny application analysis. Then the data is collected from observation, documents from the website, and applicable literature. The data collected was then analyzed using Nvivo 12 Pro Software and Vensim PLE X64 Software to provide accurate and systematic visualization and description. The results of this study found that the trans Sumatra toll road construction project is a national development project. Then the cooperation relationship carried out by the government in the construction of the trans Sumatra toll road is regulated through policies that run in 2014–Present. The companies involved in accelerating the construction of the trans-Sumatra toll road are PT Hutama Karya and PT Waskita Sriwijaya Tol. Another finding in this study is that there are still toll road sections that have not operated and have been stopped due to customary land acquisition issues.\",\"PeriodicalId\":41907,\"journal\":{\"name\":\"Journal of Infrastructure Policy and Development\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":1.0000,\"publicationDate\":\"2023-11-10\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Journal of Infrastructure Policy and Development\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.24294/jipd.v7i3.2588\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q4\",\"JCRName\":\"MANAGEMENT\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Infrastructure Policy and Development","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.24294/jipd.v7i3.2588","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"MANAGEMENT","Score":null,"Total":0}
引用次数: 0

摘要

收费公路基础设施建设是发达国家印尼政府的发展重点之一。要发展收费公路基础设施,使其顺利运行,政府和私营部门的参与是必要的。本研究旨在分析政府与土地征用约束在跨苏门答腊收费公路建设中的作用。本研究采用定性-探索性方法对研究课题进行探究。采用文献应用分析的方法确定研究课题。然后通过观察、网站文件和适用文献收集数据。然后使用Nvivo 12 Pro软件和Vensim PLE X64软件对收集的数据进行分析,以提供准确和系统的可视化和描述。本研究结果发现,跨苏门答腊收费公路建设项目为国家级开发项目。然后通过2014 -至今运行的政策规范政府在跨苏门答腊收费公路建设中开展的合作关系。参与加速跨苏门答腊收费公路建设的公司是PT Hutama Karya和PT Waskita Sriwijaya Tol。这项研究的另一个发现是,由于习惯性的土地征用问题,仍然有收费公路路段没有运营,并且已经停止。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
How are companies involved in the construction of the trans Sumatra toll road, in Indonesia? Role analysis and development policy
Toll road infrastructure development is one of the development priorities of the government of Indonesia a developed country. To develop toll road infrastructure to run smoothly, it is necessary to involve the government and the private sector. This research aims to analyze the role of the government and land acquisition constraints in the construction of the trans Sumatra toll road. This research uses a qualitative-explorative method to explore the research topic. Determination of the research topic is done by using biblioshiny application analysis. Then the data is collected from observation, documents from the website, and applicable literature. The data collected was then analyzed using Nvivo 12 Pro Software and Vensim PLE X64 Software to provide accurate and systematic visualization and description. The results of this study found that the trans Sumatra toll road construction project is a national development project. Then the cooperation relationship carried out by the government in the construction of the trans Sumatra toll road is regulated through policies that run in 2014–Present. The companies involved in accelerating the construction of the trans-Sumatra toll road are PT Hutama Karya and PT Waskita Sriwijaya Tol. Another finding in this study is that there are still toll road sections that have not operated and have been stopped due to customary land acquisition issues.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
CiteScore
1.00
自引率
14.30%
发文量
13
期刊最新文献
Forecasting China-Africa economic integration using Wavelet-ARIMA hybrid approach How are companies involved in the construction of the trans Sumatra toll road, in Indonesia? Role analysis and development policy Impact of big data analytics in project success: Mediating role of intellectual capital and knowledge sharing Development strategies for reducing infant mortality: A focus on healthcare infrastructure and policy in emerging Asian countries Organisational culture as a prerequisite for human resource management in public administration and its change in the time of COVID-19
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1