在COVID-19危机中精益管理技术的实际实施和对人工装配工艺的改进

Nattapat Suranuntchai, Parames Chutima
{"title":"在COVID-19危机中精益管理技术的实际实施和对人工装配工艺的改进","authors":"Nattapat Suranuntchai, Parames Chutima","doi":"10.4186/ej.2023.27.2.29","DOIUrl":null,"url":null,"abstract":". This research focused on the cycle time reduction of the automotive audio monitor base frame assembly process in a small electronic parts manufacturing company through the application of the Lean and ergonomics approaches. In recent years, the company has faced the problem of not being able to assemble products to meet customer s’ orders due to the need to lay off some skilled workers to survive during the COVID-19 crisis. This resulted in a severe loss in customer goodwill and confidence. The improvement process began with a review of the current assembly workflow as well as the detailed hand and arm movements of workers. Then, to determine the as-is operational procedure and average cycle time of the assembly process, a series of videos were recorded and playback in slow motion. Lean management techniques, such as 7 wastes and 5 Whys, were employed to identify the potential root causes of the problems. In addition, the ECRS (eliminate, combine, rearrange and simplify) techniques of Lean management in combination with the ergonomics principles were applied to modify the operational procedure and the postures and movements of the workers. The workspace and environmental conditions were also adjusted to enable more efficient workers’ operations. The result demonstrated that such an approach could help reduce the cycle time of the assembly process to achieve the predefined target.","PeriodicalId":11618,"journal":{"name":"Engineering Journal","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-02-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Practical Implementation of Lean Management Techniques and Ergonomic Consideration to Improve Manual Assembly Process During the COVID-19 Crisis\",\"authors\":\"Nattapat Suranuntchai, Parames Chutima\",\"doi\":\"10.4186/ej.2023.27.2.29\",\"DOIUrl\":null,\"url\":null,\"abstract\":\". This research focused on the cycle time reduction of the automotive audio monitor base frame assembly process in a small electronic parts manufacturing company through the application of the Lean and ergonomics approaches. In recent years, the company has faced the problem of not being able to assemble products to meet customer s’ orders due to the need to lay off some skilled workers to survive during the COVID-19 crisis. This resulted in a severe loss in customer goodwill and confidence. The improvement process began with a review of the current assembly workflow as well as the detailed hand and arm movements of workers. Then, to determine the as-is operational procedure and average cycle time of the assembly process, a series of videos were recorded and playback in slow motion. Lean management techniques, such as 7 wastes and 5 Whys, were employed to identify the potential root causes of the problems. In addition, the ECRS (eliminate, combine, rearrange and simplify) techniques of Lean management in combination with the ergonomics principles were applied to modify the operational procedure and the postures and movements of the workers. The workspace and environmental conditions were also adjusted to enable more efficient workers’ operations. The result demonstrated that such an approach could help reduce the cycle time of the assembly process to achieve the predefined target.\",\"PeriodicalId\":11618,\"journal\":{\"name\":\"Engineering Journal\",\"volume\":\"1 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-02-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Engineering Journal\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.4186/ej.2023.27.2.29\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Engineering Journal","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.4186/ej.2023.27.2.29","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Practical Implementation of Lean Management Techniques and Ergonomic Consideration to Improve Manual Assembly Process During the COVID-19 Crisis
. This research focused on the cycle time reduction of the automotive audio monitor base frame assembly process in a small electronic parts manufacturing company through the application of the Lean and ergonomics approaches. In recent years, the company has faced the problem of not being able to assemble products to meet customer s’ orders due to the need to lay off some skilled workers to survive during the COVID-19 crisis. This resulted in a severe loss in customer goodwill and confidence. The improvement process began with a review of the current assembly workflow as well as the detailed hand and arm movements of workers. Then, to determine the as-is operational procedure and average cycle time of the assembly process, a series of videos were recorded and playback in slow motion. Lean management techniques, such as 7 wastes and 5 Whys, were employed to identify the potential root causes of the problems. In addition, the ECRS (eliminate, combine, rearrange and simplify) techniques of Lean management in combination with the ergonomics principles were applied to modify the operational procedure and the postures and movements of the workers. The workspace and environmental conditions were also adjusted to enable more efficient workers’ operations. The result demonstrated that such an approach could help reduce the cycle time of the assembly process to achieve the predefined target.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Tensile Coupon Testing and Residual Stress Measurements of High-Strength Steel Built-Up I-Shaped Sections Lateral-Torsional Buckling Modification Factors in Steel I-Shaped Members: Recommendations Using Energy-Based Formulations Torsional Design of Round HSS Members— A Critical Review The Adoption of AISC 360 for Offshore Structural Design Practices Steel Structures Research Update: Innovative Steel Deck System for Highway Bridge Applications
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1