信号交叉口摩托车专用停车空间技术设计

None Muh Akbar, None Dewi Sriastuti Nababan, None Daud Andang Pasalli
{"title":"信号交叉口摩托车专用停车空间技术设计","authors":"None Muh Akbar, None Dewi Sriastuti Nababan, None Daud Andang Pasalli","doi":"10.47577/technium.v17i.10040","DOIUrl":null,"url":null,"abstract":"The growth of motorcycles which continues to increase every year can lead to an increase in the number of accumulation of motorcycles on the approach to the intersection, so it is necessary to plan a Exclusive Stoping Spaces for Motorcycle (ESSM). The purpose of this study is to find out whether the street at the research location meets the requirements for ESSM planning by reviewing the number of motorbikes piled up during the red phase and planning the ESSM design. The method used in this study is an experimental method in accordance with the 2014 Indonesian Highway Capacity Guidelines (PKJI) and the Technical Planning Guidelines for Special Stopping Spaces in urban areas. The results of the study show that ESSM at signalized intersections in urban areas in Merauke City can be implemented in the next 15 years, namely in 2037. Of the four arms of signalized intersections, only 3 approaches can implement ESSM facilities, namely the Brawijaya Street approach, the TMP Street approach, and Parakomando Street approach. While the Angkasa Street approach cannot be applied to ESSM because it does not meet the requirements in the ESSM planning guidelines. The ESSM design on the Brawijaya Street approach uses a 2-lane box type ESSM with an area of 60 m2; on the TMP Street approach using a 2-lane box type ESSM with an area of 60 m2; on the Parakomando Street approach using a 2-lane box type ESSM with an area of 56 m2.","PeriodicalId":490649,"journal":{"name":"Technium","volume":"1 3","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-11-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Exclusive Stopping Space for Motorcycles (ESSM) technical design at signalized intersections\",\"authors\":\"None Muh Akbar, None Dewi Sriastuti Nababan, None Daud Andang Pasalli\",\"doi\":\"10.47577/technium.v17i.10040\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The growth of motorcycles which continues to increase every year can lead to an increase in the number of accumulation of motorcycles on the approach to the intersection, so it is necessary to plan a Exclusive Stoping Spaces for Motorcycle (ESSM). The purpose of this study is to find out whether the street at the research location meets the requirements for ESSM planning by reviewing the number of motorbikes piled up during the red phase and planning the ESSM design. The method used in this study is an experimental method in accordance with the 2014 Indonesian Highway Capacity Guidelines (PKJI) and the Technical Planning Guidelines for Special Stopping Spaces in urban areas. The results of the study show that ESSM at signalized intersections in urban areas in Merauke City can be implemented in the next 15 years, namely in 2037. Of the four arms of signalized intersections, only 3 approaches can implement ESSM facilities, namely the Brawijaya Street approach, the TMP Street approach, and Parakomando Street approach. While the Angkasa Street approach cannot be applied to ESSM because it does not meet the requirements in the ESSM planning guidelines. The ESSM design on the Brawijaya Street approach uses a 2-lane box type ESSM with an area of 60 m2; on the TMP Street approach using a 2-lane box type ESSM with an area of 60 m2; on the Parakomando Street approach using a 2-lane box type ESSM with an area of 56 m2.\",\"PeriodicalId\":490649,\"journal\":{\"name\":\"Technium\",\"volume\":\"1 3\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-11-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Technium\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.47577/technium.v17i.10040\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Technium","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.47577/technium.v17i.10040","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

摩托车的增长每年都在持续增加,导致交叉口进近处摩托车的堆积数量增加,因此有必要规划摩托车专用停车空间(ESSM)。本研究的目的是通过回顾红色阶段堆积的摩托车数量并规划ESSM设计,以确定研究地点的街道是否符合ESSM规划的要求。本研究采用的方法是根据2014年印尼公路通行能力指南(PKJI)和城市地区特殊停车空间技术规划指南的实验方法。研究结果表明,在未来15年,即2037年,在Merauke市城区的信号交叉口可以实施ESSM。在信号交叉口的四个分支中,只有3个途径可以实施ESSM设施,即Brawijaya街途径、TMP街途径和Parakomando街途径。而Angkasa Street方法不能应用于ESSM,因为它不符合ESSM规划指南的要求。brwijaya街的ESSM设计采用了2车道的盒子式ESSM,面积为60平方米;在TMP街方法上,使用面积为60平方米的2车道箱形辅助公路;在Parakomando街道上使用了面积为56平方米的2车道箱型ESSM。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Exclusive Stopping Space for Motorcycles (ESSM) technical design at signalized intersections
The growth of motorcycles which continues to increase every year can lead to an increase in the number of accumulation of motorcycles on the approach to the intersection, so it is necessary to plan a Exclusive Stoping Spaces for Motorcycle (ESSM). The purpose of this study is to find out whether the street at the research location meets the requirements for ESSM planning by reviewing the number of motorbikes piled up during the red phase and planning the ESSM design. The method used in this study is an experimental method in accordance with the 2014 Indonesian Highway Capacity Guidelines (PKJI) and the Technical Planning Guidelines for Special Stopping Spaces in urban areas. The results of the study show that ESSM at signalized intersections in urban areas in Merauke City can be implemented in the next 15 years, namely in 2037. Of the four arms of signalized intersections, only 3 approaches can implement ESSM facilities, namely the Brawijaya Street approach, the TMP Street approach, and Parakomando Street approach. While the Angkasa Street approach cannot be applied to ESSM because it does not meet the requirements in the ESSM planning guidelines. The ESSM design on the Brawijaya Street approach uses a 2-lane box type ESSM with an area of 60 m2; on the TMP Street approach using a 2-lane box type ESSM with an area of 60 m2; on the Parakomando Street approach using a 2-lane box type ESSM with an area of 56 m2.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Analysis of Internal Boiler Water Treatment Maintenance System on Boiler Operation in KM. Bukit Raya Electric Parameter Measurement on Main Generator Based on IoT for Safe Operational Feasibility Design of half circular wideband antenna for ship radar The Proof of the Collatz Conjecture Sentiment Analysis for Indonesian Salt Policy uses Naïve Bayes and Information Gain Methods
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1