{"title":"独家:延迟威胁到净零目标","authors":"C. Mcglone","doi":"10.1049/et.2023.0211","DOIUrl":null,"url":null,"abstract":"The UK faces one of its greatest ever engineering challenges as it seeks to combat climate change while keeping the lights on. If it is to succeed, the pace of delivery will be crucial. developers looking to connect renewable energy projects to the electricity grid are facing delays of more than 15 years, threatening the UK's net-zero ambitions, E&T has heard. As the country's target to decarbonise the electricity grid by 2035 looms ever closer, developers, engineering firms and consultancies have spoken to E&T about the connection delays that they say are putting both the climate targets and energy security at risk. In the last 18 months, the time it takes for developers to connect renewable energy projects to the national grid has soared, and Peter Aston, a specialist connections engineer at the consultancy Roadnight Taylor, says the waiting times are now a major problem.","PeriodicalId":11578,"journal":{"name":"Engineering & Technology","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2023-03-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Exclusive: Delays threaten net-zero goals\",\"authors\":\"C. Mcglone\",\"doi\":\"10.1049/et.2023.0211\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The UK faces one of its greatest ever engineering challenges as it seeks to combat climate change while keeping the lights on. If it is to succeed, the pace of delivery will be crucial. developers looking to connect renewable energy projects to the electricity grid are facing delays of more than 15 years, threatening the UK's net-zero ambitions, E&T has heard. As the country's target to decarbonise the electricity grid by 2035 looms ever closer, developers, engineering firms and consultancies have spoken to E&T about the connection delays that they say are putting both the climate targets and energy security at risk. In the last 18 months, the time it takes for developers to connect renewable energy projects to the national grid has soared, and Peter Aston, a specialist connections engineer at the consultancy Roadnight Taylor, says the waiting times are now a major problem.\",\"PeriodicalId\":11578,\"journal\":{\"name\":\"Engineering & Technology\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-03-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Engineering & Technology\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1049/et.2023.0211\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Engineering & Technology","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1049/et.2023.0211","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

英国面临着有史以来最大的工程挑战之一,因为它试图在保持照明的同时应对气候变化。如果要成功,交付的速度将是至关重要的。据英国《金融时报》(E&T)报道,寻求将可再生能源项目接入电网的开发商正面临超过15年的延迟,这将威胁到英国实现净零排放的雄心。随着该国到2035年实现电网脱碳的目标越来越近,开发商、工程公司和咨询公司向《能源时报》谈到了电网连接延迟的问题,他们表示,这将使气候目标和能源安全都面临风险。在过去的18个月里,开发商将可再生能源项目连接到国家电网所需的时间大幅增加,咨询公司Roadnight Taylor的专业连接工程师彼得·阿斯顿(Peter Aston)表示,等待时间现在是一个主要问题。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Exclusive: Delays threaten net-zero goals
The UK faces one of its greatest ever engineering challenges as it seeks to combat climate change while keeping the lights on. If it is to succeed, the pace of delivery will be crucial. developers looking to connect renewable energy projects to the electricity grid are facing delays of more than 15 years, threatening the UK's net-zero ambitions, E&T has heard. As the country's target to decarbonise the electricity grid by 2035 looms ever closer, developers, engineering firms and consultancies have spoken to E&T about the connection delays that they say are putting both the climate targets and energy security at risk. In the last 18 months, the time it takes for developers to connect renewable energy projects to the national grid has soared, and Peter Aston, a specialist connections engineer at the consultancy Roadnight Taylor, says the waiting times are now a major problem.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Opinion - Feedback. Your Letters News - Briefing: World News Opinion - Editorial. Editor's Letter The interview - Chris Miller Reviews - Book Interview. When technology and taste collide
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1