{"title":"管理大型项目:正确的三阶段过程","authors":"Dan Lovallo, Matteo Cristofaro, Bent Flyvbjerg","doi":"10.5465/amp.2021.0129","DOIUrl":null,"url":null,"abstract":"Private and public megaprojects, whether new plant facilities, IT systems, skyscrapers, airports, railways, roads, or the Olympics, are frequently associated with dramatic cost and schedule overruns. The root causes are behavioral biases – such as optimism and deliberate deception – accompanied by principal-agent issues and a lack of project-related skills. Through a three-stage process – i.e., Forecasting, Organizing, and Executing (FOX) – we organize and offer solutions to mitigate the cognitive biases and agency issues planners and policymakers face in large projects. Following the three-stage FOX process and building on Behavioral Decision Theory (BDT), we first review evidence for the accuracy of Reference Class Forecasting (RCF), which considers comparable past projects to forecast a current, planned project. We provide evidence for RCF performance and recent methodological extensions such as Similarity Based Forecasting (SBF). Second, considering the principal-agent and project governance literature, we offer organizational solutions to reduce unfounded optimism and deception, including debiasing techniques and specific measures to curb principal-agent issues. Third, we suggest combining a project modular design with speedy implementation for faster, better, cheaper, and lower-risk execution. Overall, we offer an original, holistic theoretical view that deals with both behavioral and strategic elements of how to debias large projects, along with direct practical implications and advice for those who manage megaprojects with increasingly high stakes and risks.","PeriodicalId":48215,"journal":{"name":"Academy of Management Perspectives","volume":"20 1","pages":"0"},"PeriodicalIF":7.2000,"publicationDate":"2023-05-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":"{\"title\":\"Governing Large Projects: A Three-Stage Process to Get It Right\",\"authors\":\"Dan Lovallo, Matteo Cristofaro, Bent Flyvbjerg\",\"doi\":\"10.5465/amp.2021.0129\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Private and public megaprojects, whether new plant facilities, IT systems, skyscrapers, airports, railways, roads, or the Olympics, are frequently associated with dramatic cost and schedule overruns. The root causes are behavioral biases – such as optimism and deliberate deception – accompanied by principal-agent issues and a lack of project-related skills. Through a three-stage process – i.e., Forecasting, Organizing, and Executing (FOX) – we organize and offer solutions to mitigate the cognitive biases and agency issues planners and policymakers face in large projects. Following the three-stage FOX process and building on Behavioral Decision Theory (BDT), we first review evidence for the accuracy of Reference Class Forecasting (RCF), which considers comparable past projects to forecast a current, planned project. We provide evidence for RCF performance and recent methodological extensions such as Similarity Based Forecasting (SBF). Second, considering the principal-agent and project governance literature, we offer organizational solutions to reduce unfounded optimism and deception, including debiasing techniques and specific measures to curb principal-agent issues. Third, we suggest combining a project modular design with speedy implementation for faster, better, cheaper, and lower-risk execution. Overall, we offer an original, holistic theoretical view that deals with both behavioral and strategic elements of how to debias large projects, along with direct practical implications and advice for those who manage megaprojects with increasingly high stakes and risks.\",\"PeriodicalId\":48215,\"journal\":{\"name\":\"Academy of Management Perspectives\",\"volume\":\"20 1\",\"pages\":\"0\"},\"PeriodicalIF\":7.2000,\"publicationDate\":\"2023-05-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"2\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Academy of Management Perspectives\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.5465/amp.2021.0129\",\"RegionNum\":2,\"RegionCategory\":\"管理学\",\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q1\",\"JCRName\":\"BUSINESS\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Academy of Management Perspectives","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.5465/amp.2021.0129","RegionNum":2,"RegionCategory":"管理学","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q1","JCRName":"BUSINESS","Score":null,"Total":0}
Governing Large Projects: A Three-Stage Process to Get It Right
Private and public megaprojects, whether new plant facilities, IT systems, skyscrapers, airports, railways, roads, or the Olympics, are frequently associated with dramatic cost and schedule overruns. The root causes are behavioral biases – such as optimism and deliberate deception – accompanied by principal-agent issues and a lack of project-related skills. Through a three-stage process – i.e., Forecasting, Organizing, and Executing (FOX) – we organize and offer solutions to mitigate the cognitive biases and agency issues planners and policymakers face in large projects. Following the three-stage FOX process and building on Behavioral Decision Theory (BDT), we first review evidence for the accuracy of Reference Class Forecasting (RCF), which considers comparable past projects to forecast a current, planned project. We provide evidence for RCF performance and recent methodological extensions such as Similarity Based Forecasting (SBF). Second, considering the principal-agent and project governance literature, we offer organizational solutions to reduce unfounded optimism and deception, including debiasing techniques and specific measures to curb principal-agent issues. Third, we suggest combining a project modular design with speedy implementation for faster, better, cheaper, and lower-risk execution. Overall, we offer an original, holistic theoretical view that deals with both behavioral and strategic elements of how to debias large projects, along with direct practical implications and advice for those who manage megaprojects with increasingly high stakes and risks.
期刊介绍:
Academy of Management Perspectives (AMP) aims to provide valuable insights to current and future thought leaders, including educators, business writers, consultants, executives, policy makers, and other professionals involved in management practice and policy. The publication seeks to bridge the gap between scholarly research and practical applications by presenting evidence-based approaches to address crucial management issues.
AMP publishes research papers that employ quantitative or qualitative evidence, either from a single study or a compilation of studies within a specific field of research. The journal does not accept opinion pieces but encourages articles that focus on the implications of findings for policy and practice rather than theoretical implications.
Examples of suitable articles for publication in AMP include practitioner or policy-oriented reviews of empirical studies, descriptive articles that contribute to our comprehension of management practices and strategic approaches, and articles highlighting the practical and policy implications of evidence-based work.