影响肯尼亚蒙巴萨县公共建设项目绩效的因素

FRIDAH KAWERA, EVELYNE DATCHE, PhD
{"title":"影响肯尼亚蒙巴萨县公共建设项目绩效的因素","authors":"FRIDAH KAWERA, EVELYNE DATCHE, PhD","doi":"10.61426/sjbcm.v10i4.2777","DOIUrl":null,"url":null,"abstract":"The study was about factors affecting project performance of public construction projects in Mombasa County. The study was guided by both general and specific objectives. To strengthen the conceptual framework the study used theory of constraints, project management competency theory and control theory. The study target population was180 and sample size was 126. This study adopted a cross-sectional research design. A modified Likert scale questionnaire was developed and divided into three parts. A pilot study was carried out to refine the instrument. The quality and consistency of the study was further assessed using Cronbach's alpha. Data analysis was performed on a computer using Statistical Package for Social Science (SPSS Version 25) for Windows. Data was presented in form of means, standard deviation, percentages and tables. Findings show that there was a strong positive correlation between project staff competencies, project monitoring and evaluation and project risk management and there was no correlation between project resource mobilization and performance of public projects in Mombasa County. The study findings further showed project staff competencies and project monitoring and evaluation have a significant effect on project performance of public construction projects in Mombasa County and project resource mobilization and project risk management have no effect on project performance of public construction projects in Mombasa County. The study recommends that counties should continuously train construction experts to be able to build their capacity as well as competencies to be able to deliver quality works and on time within the budgets; that counties should design better monitoring and evaluation tools to be adopted in service delivery; that counties should undertake projects that they have sufficient financial resources and human capacity to deliver the work and that counties should partner with the public under PPPs to deliver on projects where there have no sufficient resources. Key Terms: Project Staff Competencies, Project Evaluation, Project Resource Mobilization, Project Risk Management CITATION : Kawera, F., & Datche, E. (2023). Factors affecting project performance of public construction projects in Mombasa County, Kenya. The Strategic Journal of Business & Change Management, 10 (4), 601 – 619. http://dx.doi.org/10.61426/sjbcm.v10i4.2777.","PeriodicalId":22086,"journal":{"name":"Strategic Journal of Business & Change Management","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2023-11-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"FACTORS AFFECTING PROJECT PERFORMANCE OF PUBLIC CONSTRUCTION PROJECTS IN MOMBASA COUNTY, KENYA\",\"authors\":\"FRIDAH KAWERA, EVELYNE DATCHE, PhD\",\"doi\":\"10.61426/sjbcm.v10i4.2777\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The study was about factors affecting project performance of public construction projects in Mombasa County. The study was guided by both general and specific objectives. To strengthen the conceptual framework the study used theory of constraints, project management competency theory and control theory. The study target population was180 and sample size was 126. This study adopted a cross-sectional research design. A modified Likert scale questionnaire was developed and divided into three parts. A pilot study was carried out to refine the instrument. The quality and consistency of the study was further assessed using Cronbach's alpha. Data analysis was performed on a computer using Statistical Package for Social Science (SPSS Version 25) for Windows. Data was presented in form of means, standard deviation, percentages and tables. Findings show that there was a strong positive correlation between project staff competencies, project monitoring and evaluation and project risk management and there was no correlation between project resource mobilization and performance of public projects in Mombasa County. The study findings further showed project staff competencies and project monitoring and evaluation have a significant effect on project performance of public construction projects in Mombasa County and project resource mobilization and project risk management have no effect on project performance of public construction projects in Mombasa County. The study recommends that counties should continuously train construction experts to be able to build their capacity as well as competencies to be able to deliver quality works and on time within the budgets; that counties should design better monitoring and evaluation tools to be adopted in service delivery; that counties should undertake projects that they have sufficient financial resources and human capacity to deliver the work and that counties should partner with the public under PPPs to deliver on projects where there have no sufficient resources. Key Terms: Project Staff Competencies, Project Evaluation, Project Resource Mobilization, Project Risk Management CITATION : Kawera, F., & Datche, E. (2023). Factors affecting project performance of public construction projects in Mombasa County, Kenya. The Strategic Journal of Business & Change Management, 10 (4), 601 – 619. http://dx.doi.org/10.61426/sjbcm.v10i4.2777.\",\"PeriodicalId\":22086,\"journal\":{\"name\":\"Strategic Journal of Business & Change Management\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-11-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Strategic Journal of Business & Change Management\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.61426/sjbcm.v10i4.2777\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Strategic Journal of Business & Change Management","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.61426/sjbcm.v10i4.2777","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

本文以蒙巴萨县公共建设项目绩效影响因素为研究对象。这项研究以一般目标和具体目标为指导。为了强化概念框架,本研究运用了约束理论、项目管理胜任力理论和控制理论。研究目标人群为180人,样本量为126人。本研究采用横断面研究设计。开发了一份改进的李克特量表问卷,分为三个部分。为了改进仪器,进行了初步研究。使用Cronbach's alpha进一步评估研究的质量和一致性。数据分析在计算机上使用Statistical Package for Social Science (SPSS Version 25) for Windows进行。数据以均值、标准差、百分比和表格的形式呈现。研究结果表明,蒙巴萨县的项目人员能力、项目监测和评估与项目风险管理之间存在很强的正相关关系,而项目资源调动与公共项目绩效之间没有相关性。研究结果进一步表明,项目人员胜任力和项目监测评价对蒙巴萨县公共建设项目绩效有显著影响,项目资源调动和项目风险管理对蒙巴萨县公共建设项目绩效没有影响。该研究建议,各国应不断培训建筑专家,使其能够提高能力和胜任能力,从而能够在预算范围内按时交付高质量的工程;各国应设计更好的监测和评估工具,以便在提供服务时采用;各县应该承担有足够财政资源和人力来完成工作的项目,各县应该在公私伙伴关系下与公众合作,在没有足够资源的地方完成项目。关键词:项目人员能力,项目评估,项目资源调动,项目风险管理引文:Kawera, F., &;达切,E.(2023)。影响肯尼亚蒙巴萨县公共建设项目绩效的因素商业战略杂志;管理学报,21(4),391 - 391。http://dx.doi.org/10.61426/sjbcm.v10i4.2777。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
FACTORS AFFECTING PROJECT PERFORMANCE OF PUBLIC CONSTRUCTION PROJECTS IN MOMBASA COUNTY, KENYA
The study was about factors affecting project performance of public construction projects in Mombasa County. The study was guided by both general and specific objectives. To strengthen the conceptual framework the study used theory of constraints, project management competency theory and control theory. The study target population was180 and sample size was 126. This study adopted a cross-sectional research design. A modified Likert scale questionnaire was developed and divided into three parts. A pilot study was carried out to refine the instrument. The quality and consistency of the study was further assessed using Cronbach's alpha. Data analysis was performed on a computer using Statistical Package for Social Science (SPSS Version 25) for Windows. Data was presented in form of means, standard deviation, percentages and tables. Findings show that there was a strong positive correlation between project staff competencies, project monitoring and evaluation and project risk management and there was no correlation between project resource mobilization and performance of public projects in Mombasa County. The study findings further showed project staff competencies and project monitoring and evaluation have a significant effect on project performance of public construction projects in Mombasa County and project resource mobilization and project risk management have no effect on project performance of public construction projects in Mombasa County. The study recommends that counties should continuously train construction experts to be able to build their capacity as well as competencies to be able to deliver quality works and on time within the budgets; that counties should design better monitoring and evaluation tools to be adopted in service delivery; that counties should undertake projects that they have sufficient financial resources and human capacity to deliver the work and that counties should partner with the public under PPPs to deliver on projects where there have no sufficient resources. Key Terms: Project Staff Competencies, Project Evaluation, Project Resource Mobilization, Project Risk Management CITATION : Kawera, F., & Datche, E. (2023). Factors affecting project performance of public construction projects in Mombasa County, Kenya. The Strategic Journal of Business & Change Management, 10 (4), 601 – 619. http://dx.doi.org/10.61426/sjbcm.v10i4.2777.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
EFFECT OF MONITORING LEVEL ON COMPLETION RATE OF DEVELOPMENT PROJECTS IN MANDERA COUNTY, KENYA INTERNAL AUDIT PRACTICES AND FINANCIAL REPORTING QUALITY OF COUNTY GOVERNMENTS IN KENYA EFFECT OF DEBT FINANCING ON FINANCIAL PERFORMANCE OF SELECTED STATE CORPORATIONS IN KENYA INFLUENCE OF PROJECT COST CONTROL INFLUENCES PERFORMANCE OF CONSTRUCTION PROJECTS IN RWANDA: CASE OF BAXONS CONSTRUCTION LIMITED EFFECT OF PROJECT GOVERNANCE MODELS ON PERFORMANCE OF FINANCIAL INSTITUTIONS MERGERS AND ACQUISITIONS IN RWANDA. A CASE OF BPR BANK PLC
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1