发动机预防性维修

None Trisna Mesra, Insannul Kamil, Rika Ampuh Hadiguna
{"title":"发动机预防性维修","authors":"None Trisna Mesra, Insannul Kamil, Rika Ampuh Hadiguna","doi":"10.31289/jime.v7i2.10133","DOIUrl":null,"url":null,"abstract":"The Planned maintenance activities can make the production process run smoothly. The object of the research was pump machine with three phase. Based on obsevations, pumps often experience damage to critical components. This study aims to implement preventive maintenance on pump. The advantage of using preventive maintenance can determine the optimal type of maintence and maintenance time intervals for each critical component. The research stages include determining the probability density function (pdf) and reliability, determining the maintenance interval for critical component using the downtime minimization criteria that will be used to schedule maintenance and determining the cost of corrective and preventive for each critical component. The result of the application of preventive maintenance, there were three component that experienced a decrease in maintenance costs, namely the electromotor component experiencing a 23,7% cost reduction with a 52% reliability level, the radial bearing component experiencing a cost reduction by 24% with a reliability level of 66,64% and the impeller component experiencing a decrease 19,5% cost with a 69% reliability rate. While the maintenance time interval for the electromotor component is 142,4 hours, the radial bearing component is 153,5 hours and the impeller component is 168,8 hours.","PeriodicalId":479709,"journal":{"name":"JIME (Journal of Industrial and Manufacture Engineering)","volume":"71 11","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-11-07","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Perawatan Preventif Mesin Pompa Air\",\"authors\":\"None Trisna Mesra, Insannul Kamil, Rika Ampuh Hadiguna\",\"doi\":\"10.31289/jime.v7i2.10133\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The Planned maintenance activities can make the production process run smoothly. The object of the research was pump machine with three phase. Based on obsevations, pumps often experience damage to critical components. This study aims to implement preventive maintenance on pump. The advantage of using preventive maintenance can determine the optimal type of maintence and maintenance time intervals for each critical component. The research stages include determining the probability density function (pdf) and reliability, determining the maintenance interval for critical component using the downtime minimization criteria that will be used to schedule maintenance and determining the cost of corrective and preventive for each critical component. The result of the application of preventive maintenance, there were three component that experienced a decrease in maintenance costs, namely the electromotor component experiencing a 23,7% cost reduction with a 52% reliability level, the radial bearing component experiencing a cost reduction by 24% with a reliability level of 66,64% and the impeller component experiencing a decrease 19,5% cost with a 69% reliability rate. While the maintenance time interval for the electromotor component is 142,4 hours, the radial bearing component is 153,5 hours and the impeller component is 168,8 hours.\",\"PeriodicalId\":479709,\"journal\":{\"name\":\"JIME (Journal of Industrial and Manufacture Engineering)\",\"volume\":\"71 11\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-11-07\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"JIME (Journal of Industrial and Manufacture Engineering)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.31289/jime.v7i2.10133\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"JIME (Journal of Industrial and Manufacture Engineering)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.31289/jime.v7i2.10133","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

有计划的维护活动可以使生产过程顺利进行。研究对象为三相泵机。根据观察,泵的关键部件经常受到损坏。本研究旨在对水泵进行预防性维修。使用预防性维护的优点可以确定每个关键部件的最佳维护类型和维护时间间隔。研究阶段包括确定概率密度函数(pdf)和可靠性,使用将用于计划维护的停机时间最小化标准确定关键部件的维护间隔,以及确定每个关键部件的纠正和预防成本。应用预防性维护的结果是,有三个部件的维护成本降低,即电机部件的成本降低了23.7%,可靠性水平为52%;径向轴承部件的成本降低了24%,可靠性水平为66.64%;叶轮部件的成本降低了19.5%,可靠性水平为69%。电机部件的维护时间间隔为144.2小时,径向轴承部件为155.3小时,叶轮部件为168.8小时。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Perawatan Preventif Mesin Pompa Air
The Planned maintenance activities can make the production process run smoothly. The object of the research was pump machine with three phase. Based on obsevations, pumps often experience damage to critical components. This study aims to implement preventive maintenance on pump. The advantage of using preventive maintenance can determine the optimal type of maintence and maintenance time intervals for each critical component. The research stages include determining the probability density function (pdf) and reliability, determining the maintenance interval for critical component using the downtime minimization criteria that will be used to schedule maintenance and determining the cost of corrective and preventive for each critical component. The result of the application of preventive maintenance, there were three component that experienced a decrease in maintenance costs, namely the electromotor component experiencing a 23,7% cost reduction with a 52% reliability level, the radial bearing component experiencing a cost reduction by 24% with a reliability level of 66,64% and the impeller component experiencing a decrease 19,5% cost with a 69% reliability rate. While the maintenance time interval for the electromotor component is 142,4 hours, the radial bearing component is 153,5 hours and the impeller component is 168,8 hours.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Supply Chain Analysis of Traditional Fish Catches of Bagan Deli City Medan and Bagan Percut of Deli Serdang District Perawatan Preventif Mesin Pompa Air Penggunaan Metode Balanced Scorecard (BSC) untuk Pengukuran Kinerja pada UMKM XYZ Pemilihan Pemasok dan Alokasi Order Optimum pada Komoditas Hasil Laut Menggunakan Analytical Hierarchy Process dan Multi Objective Linear Programming Perancangan Tata Letak Pabrik Mie Lethek UD Garuda dengan Metode DBD, ALDEP, CORELAP dan MST
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1