Q4 Engineering Disaster Advances Pub Date : 2023-10-15 DOI:10.25303/1611da053070
T.F.K. Ngoroyemoto, A.R. Sabao, N. Ndlovu, P. Munemo, V.Y. Katte
{"title":"在PAARI采矿集团设计一个更稳定的隧道","authors":"T.F.K. Ngoroyemoto, A.R. Sabao, N. Ndlovu, P. Munemo, V.Y. Katte","doi":"10.25303/1611da053070","DOIUrl":null,"url":null,"abstract":"High fracturing and faulting at Paari Mine syndicate have resulted in weak ground conditions making it difficult to conduct mining operations safely. The hanging walls and the side walls are covered with numerous faults and intersecting striking joints forming wedges which are extremely unstable. The project aims to solve the mines problem of tunnel subsidence. The work performed included studying the rock formations within the mine and determining their properties and response to excavations. The rock mass was then classified according to the rock mass rating and the rock quality index. Support design was done using guidelines according to rock mass rating tables. Ground support practices that are currently used at the mine and analysing vulnerabilities of the system were then studied and the use of systematic rock bolting, 2 meters long with a diameter of 24 mm fully grouted was proposed. In addition, we recommend that a spacing of 1 m to 1.5 m of the bolds should be used on the crown pillars as well the walls and that wire mesh should also be used as an additional support mechanism.","PeriodicalId":50576,"journal":{"name":"Disaster Advances","volume":"45 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-10-15","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Designing a more stable tunnel at PAARI mining syndicate\",\"authors\":\"T.F.K. Ngoroyemoto, A.R. Sabao, N. Ndlovu, P. Munemo, V.Y. Katte\",\"doi\":\"10.25303/1611da053070\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"High fracturing and faulting at Paari Mine syndicate have resulted in weak ground conditions making it difficult to conduct mining operations safely. The hanging walls and the side walls are covered with numerous faults and intersecting striking joints forming wedges which are extremely unstable. The project aims to solve the mines problem of tunnel subsidence. The work performed included studying the rock formations within the mine and determining their properties and response to excavations. The rock mass was then classified according to the rock mass rating and the rock quality index. Support design was done using guidelines according to rock mass rating tables. Ground support practices that are currently used at the mine and analysing vulnerabilities of the system were then studied and the use of systematic rock bolting, 2 meters long with a diameter of 24 mm fully grouted was proposed. In addition, we recommend that a spacing of 1 m to 1.5 m of the bolds should be used on the crown pillars as well the walls and that wire mesh should also be used as an additional support mechanism.\",\"PeriodicalId\":50576,\"journal\":{\"name\":\"Disaster Advances\",\"volume\":\"45 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-10-15\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Disaster Advances\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.25303/1611da053070\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q4\",\"JCRName\":\"Engineering\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Disaster Advances","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.25303/1611da053070","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"Engineering","Score":null,"Total":0}
引用次数: 0

摘要

Paari矿山的高压裂和断层导致了脆弱的地面条件,使采矿作业难以安全进行。上、侧壁上覆有大量断层和相交的击打节理,形成楔形,极不稳定。本工程旨在解决矿山巷道沉陷问题。所做的工作包括研究矿山内的岩层,确定它们的性质和对挖掘的反应。然后根据岩体等级和岩体质量指数对岩体进行分类。根据岩体等级表进行支护设计。然后研究了矿山目前使用的地面支护方法,并分析了系统的脆弱性,提出了采用系统锚杆支护,长2米,直径24毫米全注浆。此外,我们建议在顶柱和墙壁上使用1米至1.5米的支架间距,并且还应使用金属丝网作为额外的支撑机制。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Designing a more stable tunnel at PAARI mining syndicate
High fracturing and faulting at Paari Mine syndicate have resulted in weak ground conditions making it difficult to conduct mining operations safely. The hanging walls and the side walls are covered with numerous faults and intersecting striking joints forming wedges which are extremely unstable. The project aims to solve the mines problem of tunnel subsidence. The work performed included studying the rock formations within the mine and determining their properties and response to excavations. The rock mass was then classified according to the rock mass rating and the rock quality index. Support design was done using guidelines according to rock mass rating tables. Ground support practices that are currently used at the mine and analysing vulnerabilities of the system were then studied and the use of systematic rock bolting, 2 meters long with a diameter of 24 mm fully grouted was proposed. In addition, we recommend that a spacing of 1 m to 1.5 m of the bolds should be used on the crown pillars as well the walls and that wire mesh should also be used as an additional support mechanism.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
Disaster Advances
Disaster Advances 地学-地球科学综合
CiteScore
0.70
自引率
0.00%
发文量
57
审稿时长
3.5 months
期刊介绍: Information not localized
期刊最新文献
Disaster Management and Landslide Risk Reduction Strategies in The Gebog Sub-District of Kudus Regency, Central Java, Indonesia Classification of Ionospheric Scintillations during high Solar Activity and Geomagnetic Storm over Visakhapatnam Region using Machine Learning Approach Remote Sensing based Early Warning Systems for Detection and Assessment of Landslides: A Case Study of Himachal Pradesh, India Improvement awareness of disaster management using virtual reality-based tsunami disaster drills Long-term Impact Assessment of Disasters through Predictive Analytics
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1