带卸载时间的多阶段柔性流水车间调度问题的有效两阶段启发式及下界

IF 2.2 3区 综合性期刊 Q2 MULTIDISCIPLINARY SCIENCES Symmetry-Basel Pub Date : 2023-10-31 DOI:10.3390/sym15112005
Lotfi Hidri
{"title":"带卸载时间的多阶段柔性流水车间调度问题的有效两阶段启发式及下界","authors":"Lotfi Hidri","doi":"10.3390/sym15112005","DOIUrl":null,"url":null,"abstract":"This paper addresses the flexible flow shop scheduling problem with unloading operations, which commonly occurs in modern manufacturing processes like sand casting. Although only a few related works have been proposed in the literature, the significance of this problem motivates the need for efficient algorithms and the exploration of new properties. One interesting property established is the symmetry of the problem, where scheduling from the first stage to the last or vice versa yields the same optimal solution. This property enhances solution quality. Considering the problem’s theoretical complexity as strongly NP-Hard, approximate solutions are preferable, especially for medium and large-scale instances. To address this, a new two-phase heuristic is proposed, consisting of a constructive phase and an improvement phase. This heuristic builds upon an existing efficient heuristic for the parallel machine-scheduling problem and extends it to incorporate unloading times efficiently. The selection of the two-phase heuristic is justified by its ability to generate high-quality schedules at each stage. Moreover, new efficient lower bounds based on estimating minimum idle time in each stage are presented, utilizing the polynomial parallel machine-scheduling problem with flow time minimization in the previous stage. These lower bounds contribute to assessing the performance of the two-phase heuristic over the relative gap performance measure. Extensive experiments are conducted on benchmark test problems, demonstrating the effectiveness of the proposed algorithms. The results indicate an average computation time of 9.92 s and a mean relative gap of only 2.80% for several jobs up to 200 and several stages up to 10.","PeriodicalId":48874,"journal":{"name":"Symmetry-Basel","volume":null,"pages":null},"PeriodicalIF":2.2000,"publicationDate":"2023-10-31","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Effective Two-Phase Heuristic and Lower Bounds for Multi-Stage Flexible Flow Shop Scheduling Problem with Unloading Times\",\"authors\":\"Lotfi Hidri\",\"doi\":\"10.3390/sym15112005\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This paper addresses the flexible flow shop scheduling problem with unloading operations, which commonly occurs in modern manufacturing processes like sand casting. Although only a few related works have been proposed in the literature, the significance of this problem motivates the need for efficient algorithms and the exploration of new properties. One interesting property established is the symmetry of the problem, where scheduling from the first stage to the last or vice versa yields the same optimal solution. This property enhances solution quality. Considering the problem’s theoretical complexity as strongly NP-Hard, approximate solutions are preferable, especially for medium and large-scale instances. To address this, a new two-phase heuristic is proposed, consisting of a constructive phase and an improvement phase. This heuristic builds upon an existing efficient heuristic for the parallel machine-scheduling problem and extends it to incorporate unloading times efficiently. The selection of the two-phase heuristic is justified by its ability to generate high-quality schedules at each stage. Moreover, new efficient lower bounds based on estimating minimum idle time in each stage are presented, utilizing the polynomial parallel machine-scheduling problem with flow time minimization in the previous stage. These lower bounds contribute to assessing the performance of the two-phase heuristic over the relative gap performance measure. Extensive experiments are conducted on benchmark test problems, demonstrating the effectiveness of the proposed algorithms. The results indicate an average computation time of 9.92 s and a mean relative gap of only 2.80% for several jobs up to 200 and several stages up to 10.\",\"PeriodicalId\":48874,\"journal\":{\"name\":\"Symmetry-Basel\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":2.2000,\"publicationDate\":\"2023-10-31\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Symmetry-Basel\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.3390/sym15112005\",\"RegionNum\":3,\"RegionCategory\":\"综合性期刊\",\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q2\",\"JCRName\":\"MULTIDISCIPLINARY SCIENCES\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Symmetry-Basel","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.3390/sym15112005","RegionNum":3,"RegionCategory":"综合性期刊","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q2","JCRName":"MULTIDISCIPLINARY SCIENCES","Score":null,"Total":0}
引用次数: 0

摘要

本文研究了砂型铸造等现代制造过程中常见的带卸载作业的柔性流水车间调度问题。虽然文献中只提出了一些相关的工作,但这个问题的重要性激发了对高效算法和探索新性质的需求。建立了一个有趣的性质,即问题的对称性,从第一阶段到最后阶段的调度或反之亦然,都会产生相同的最优解。此特性可提高溶液质量。考虑到问题的理论复杂性为强NP-Hard,近似解是可取的,特别是对于中型和大型实例。为了解决这个问题,提出了一种新的两阶段启发式方法,包括构建阶段和改进阶段。该启发式算法建立在现有的并行机器调度问题的有效启发式算法的基础上,并将其扩展到有效地包含卸载时间。两阶段启发式的选择是合理的,因为它能够在每个阶段生成高质量的时间表。此外,利用前一阶段流时间最小化的多项式并行机器调度问题,提出了基于估计各阶段最小空闲时间的新的有效下界。这些下界有助于评估相对差距绩效度量的两阶段启发式的性能。在基准测试问题上进行了大量实验,证明了所提出算法的有效性。结果表明,在200以下的几个作业和10以下的几个阶段,平均计算时间为9.92 s,平均相对差距仅为2.80%。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Effective Two-Phase Heuristic and Lower Bounds for Multi-Stage Flexible Flow Shop Scheduling Problem with Unloading Times
This paper addresses the flexible flow shop scheduling problem with unloading operations, which commonly occurs in modern manufacturing processes like sand casting. Although only a few related works have been proposed in the literature, the significance of this problem motivates the need for efficient algorithms and the exploration of new properties. One interesting property established is the symmetry of the problem, where scheduling from the first stage to the last or vice versa yields the same optimal solution. This property enhances solution quality. Considering the problem’s theoretical complexity as strongly NP-Hard, approximate solutions are preferable, especially for medium and large-scale instances. To address this, a new two-phase heuristic is proposed, consisting of a constructive phase and an improvement phase. This heuristic builds upon an existing efficient heuristic for the parallel machine-scheduling problem and extends it to incorporate unloading times efficiently. The selection of the two-phase heuristic is justified by its ability to generate high-quality schedules at each stage. Moreover, new efficient lower bounds based on estimating minimum idle time in each stage are presented, utilizing the polynomial parallel machine-scheduling problem with flow time minimization in the previous stage. These lower bounds contribute to assessing the performance of the two-phase heuristic over the relative gap performance measure. Extensive experiments are conducted on benchmark test problems, demonstrating the effectiveness of the proposed algorithms. The results indicate an average computation time of 9.92 s and a mean relative gap of only 2.80% for several jobs up to 200 and several stages up to 10.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
Symmetry-Basel
Symmetry-Basel MULTIDISCIPLINARY SCIENCES-
CiteScore
5.40
自引率
11.10%
发文量
2276
审稿时长
14.88 days
期刊介绍: Symmetry (ISSN 2073-8994), an international and interdisciplinary scientific journal, publishes reviews, regular research papers and short notes. Our aim is to encourage scientists to publish their experimental and theoretical research in as much detail as possible. There is no restriction on the length of the papers. Full experimental and/or methodical details must be provided, so that results can be reproduced.
期刊最新文献
The Chromatic Entropy of Linear Supertrees and Its Application Angular-Momentum Modes in a Bosonic Condensate Trapped in the Inverse-Square Potential Development of Compact Bandpass Filter Using Symmetrical Metamaterial Structures for GPS, ISM, Wi-MAX, and WLAN Applications Entanglement and Symmetry Structure of N(= 3) Quantum Oscillators with Disparate Coupling Strengths in a Common Quantum Field Bath Nuclear Shape-Phase Transitions and the Sextic Oscillator
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1