H. W. You, Z.L. Chong, W. L. Teoh, M.B.C. Khoo, W.C. Yeong
{"title":"期望平均运行长度(EARL)的SSGR和EWMA控制图性能比较","authors":"H. W. You, Z.L. Chong, W. L. Teoh, M.B.C. Khoo, W.C. Yeong","doi":"10.30880/ijie.2023.15.05.005","DOIUrl":null,"url":null,"abstract":"The acceleration use of control charts in industrial processes has led to the effectiveness in their evaluation by quality practitioners. This is crucial, as it influences their decisions on the choice of which control charts to employ. This study aims to explore and compare the performance of the side sensitive group runs (SSGR) and exponentially weighted moving average (EWMA) control charts. In general, the average run length (ARL) characteristics were used to evaluate the performance of these control charts. The ARL, which considers the exact shift size in the process, is restricted in the case when the practitioner cannot identify the process shift size (unknown shift size). In this situation, the expected average run length (EARL) is an alternative performance criterion. Upon comparison of the findings obtained, the EWMA chart has superior performance when (δmin, δmax) = (0.1, 0.4). In contrast, the SSGR chart overtakes the EWMA chart when (δmin, δmax) = (0.5, 0.8) and (δmin, δmax) = (0.9, 1.2), except when the sample size n = 3 for (δmin, δmax) = (0.5, 0.8). For this particular combination, the EWMA chart performs slightly better than the SSGR chart. The outcome of this study is expected to contribute to practitioners in identifying suitable control charts in process monitoring and implementation.","PeriodicalId":14189,"journal":{"name":"International Journal of Integrated Engineering","volume":"74 1","pages":"0"},"PeriodicalIF":0.4000,"publicationDate":"2023-10-19","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"An Expected Average Run Length (EARL) Performance Comparison of the SSGR and EWMA Control Charts\",\"authors\":\"H. W. You, Z.L. Chong, W. L. Teoh, M.B.C. Khoo, W.C. Yeong\",\"doi\":\"10.30880/ijie.2023.15.05.005\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The acceleration use of control charts in industrial processes has led to the effectiveness in their evaluation by quality practitioners. This is crucial, as it influences their decisions on the choice of which control charts to employ. This study aims to explore and compare the performance of the side sensitive group runs (SSGR) and exponentially weighted moving average (EWMA) control charts. In general, the average run length (ARL) characteristics were used to evaluate the performance of these control charts. The ARL, which considers the exact shift size in the process, is restricted in the case when the practitioner cannot identify the process shift size (unknown shift size). In this situation, the expected average run length (EARL) is an alternative performance criterion. Upon comparison of the findings obtained, the EWMA chart has superior performance when (δmin, δmax) = (0.1, 0.4). In contrast, the SSGR chart overtakes the EWMA chart when (δmin, δmax) = (0.5, 0.8) and (δmin, δmax) = (0.9, 1.2), except when the sample size n = 3 for (δmin, δmax) = (0.5, 0.8). For this particular combination, the EWMA chart performs slightly better than the SSGR chart. The outcome of this study is expected to contribute to practitioners in identifying suitable control charts in process monitoring and implementation.\",\"PeriodicalId\":14189,\"journal\":{\"name\":\"International Journal of Integrated Engineering\",\"volume\":\"74 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.4000,\"publicationDate\":\"2023-10-19\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"International Journal of Integrated Engineering\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.30880/ijie.2023.15.05.005\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q4\",\"JCRName\":\"ENGINEERING, MULTIDISCIPLINARY\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Journal of Integrated Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.30880/ijie.2023.15.05.005","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"ENGINEERING, MULTIDISCIPLINARY","Score":null,"Total":0}
An Expected Average Run Length (EARL) Performance Comparison of the SSGR and EWMA Control Charts
The acceleration use of control charts in industrial processes has led to the effectiveness in their evaluation by quality practitioners. This is crucial, as it influences their decisions on the choice of which control charts to employ. This study aims to explore and compare the performance of the side sensitive group runs (SSGR) and exponentially weighted moving average (EWMA) control charts. In general, the average run length (ARL) characteristics were used to evaluate the performance of these control charts. The ARL, which considers the exact shift size in the process, is restricted in the case when the practitioner cannot identify the process shift size (unknown shift size). In this situation, the expected average run length (EARL) is an alternative performance criterion. Upon comparison of the findings obtained, the EWMA chart has superior performance when (δmin, δmax) = (0.1, 0.4). In contrast, the SSGR chart overtakes the EWMA chart when (δmin, δmax) = (0.5, 0.8) and (δmin, δmax) = (0.9, 1.2), except when the sample size n = 3 for (δmin, δmax) = (0.5, 0.8). For this particular combination, the EWMA chart performs slightly better than the SSGR chart. The outcome of this study is expected to contribute to practitioners in identifying suitable control charts in process monitoring and implementation.
期刊介绍:
The International Journal of Integrated Engineering (IJIE) is a single blind peer reviewed journal which publishes 3 times a year since 2009. The journal is dedicated to various issues focusing on 3 different fields which are:- Civil and Environmental Engineering. Original contributions for civil and environmental engineering related practices will be publishing under this category and as the nucleus of the journal contents. The journal publishes a wide range of research and application papers which describe laboratory and numerical investigations or report on full scale projects. Electrical and Electronic Engineering. It stands as a international medium for the publication of original papers concerned with the electrical and electronic engineering. The journal aims to present to the international community important results of work in this field, whether in the form of research, development, application or design. Mechanical, Materials and Manufacturing Engineering. It is a platform for the publication and dissemination of original work which contributes to the understanding of the main disciplines underpinning the mechanical, materials and manufacturing engineering. Original contributions giving insight into engineering practices related to mechanical, materials and manufacturing engineering form the core of the journal contents.