{"title":"高层建筑结构工程实施绩效风险管理的效果(结城大厦)","authors":"Mahliza Nasution","doi":"10.52403/ijrr.20231109","DOIUrl":null,"url":null,"abstract":"There are risks in every construction project, uncontrolled risks will become a problem and cause losses to the project due to cost overruns and delays in work execution. Therefore, to manage risk, it is necessary to carry out risk management so that the project can survive, or perhaps optimize risk. The purpose of this study was to determine the dominant risk factors, how big the level of risk that occurred and the response given to the dominant risks of cost and time performance in the structural work of the Grand Jati Junction Apartment Development project. From the results of this study, it was found that 8 factors became the dominant risk factors with varying (different) levels depending on the complexity of the work and the conditions at the time of implementation of each stage of the work. Then from the results of the risk factor analysis, a risk response is obtained in the form of preventive measures to prevent or minimize these risks. Keywords: Risk Management, Building Structure Work.","PeriodicalId":13809,"journal":{"name":"International Journal of Current Research and Review","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2023-11-03","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Effect of Implementation of Performance Risk Management on High Rise Building Structure Work (Junction City Building)\",\"authors\":\"Mahliza Nasution\",\"doi\":\"10.52403/ijrr.20231109\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"There are risks in every construction project, uncontrolled risks will become a problem and cause losses to the project due to cost overruns and delays in work execution. Therefore, to manage risk, it is necessary to carry out risk management so that the project can survive, or perhaps optimize risk. The purpose of this study was to determine the dominant risk factors, how big the level of risk that occurred and the response given to the dominant risks of cost and time performance in the structural work of the Grand Jati Junction Apartment Development project. From the results of this study, it was found that 8 factors became the dominant risk factors with varying (different) levels depending on the complexity of the work and the conditions at the time of implementation of each stage of the work. Then from the results of the risk factor analysis, a risk response is obtained in the form of preventive measures to prevent or minimize these risks. Keywords: Risk Management, Building Structure Work.\",\"PeriodicalId\":13809,\"journal\":{\"name\":\"International Journal of Current Research and Review\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-11-03\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"International Journal of Current Research and Review\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.52403/ijrr.20231109\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q4\",\"JCRName\":\"Health Professions\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Journal of Current Research and Review","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.52403/ijrr.20231109","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"Health Professions","Score":null,"Total":0}
引用次数: 0

摘要

每一个建设项目都存在着风险,风险控制不了就会成为一个问题,会因为成本超支和工期延误而给项目造成损失。因此,为了管理风险,有必要进行风险管理,使项目能够生存,或者可能优化风险。本研究的目的是确定大贾提枢纽公寓开发项目结构工作中的主要风险因素,发生的风险水平有多大,以及对成本和时间绩效的主要风险的反应。从本研究的结果来看,根据工作的复杂程度和工作各阶段实施时的条件不同,有8个因素成为主导风险因素,其程度不同。然后从风险因素分析的结果中,以预防措施的形式得到风险响应,以防止或最小化这些风险。关键词:风险管理;建筑结构工程;
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Effect of Implementation of Performance Risk Management on High Rise Building Structure Work (Junction City Building)
There are risks in every construction project, uncontrolled risks will become a problem and cause losses to the project due to cost overruns and delays in work execution. Therefore, to manage risk, it is necessary to carry out risk management so that the project can survive, or perhaps optimize risk. The purpose of this study was to determine the dominant risk factors, how big the level of risk that occurred and the response given to the dominant risks of cost and time performance in the structural work of the Grand Jati Junction Apartment Development project. From the results of this study, it was found that 8 factors became the dominant risk factors with varying (different) levels depending on the complexity of the work and the conditions at the time of implementation of each stage of the work. Then from the results of the risk factor analysis, a risk response is obtained in the form of preventive measures to prevent or minimize these risks. Keywords: Risk Management, Building Structure Work.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
International Journal of Current Research and Review
International Journal of Current Research and Review Health Professions-Health Professions (miscellaneous)
自引率
0.00%
发文量
162
期刊最新文献
A Study on Public Perception Towards Reproductive Care Services in Health Care Facilities in Kerala, India Potential Methods for Alleviating Symptoms of Bruxism Knowledge, Attitude and Perception of Self-Harm in Pregnancy Among Women Attending Ante-Natal Clinics in South-Western Nigeria The Development Strategy of Natural Skincare (Case Study PT Nectars Natura Karya) Validity & Reliability of Vlosum (Het’s Device - to Instantly Test Vaginal Opening) Test the Vaginal Opening
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1