增建电力设施投资项目可行性研究的评价模型

Matsaid Budi Reksono, Abdul Rahman Rahim
{"title":"增建电力设施投资项目可行性研究的评价模型","authors":"Matsaid Budi Reksono, Abdul Rahman Rahim","doi":"10.33830/isbest.v3i1.1240","DOIUrl":null,"url":null,"abstract":"Numerous recent researches have revisited the issue of the potential conflicting feasibility method of competing investment projects. This paper provides an example of an assessment models can be built and used for feasibility analysis of electricity investment projects. An overview of feasibility assessment methods is presented, consist of general assessment model, risk analysis methods, and a new optimization method used to estimate strategic and financing requirements of electricity investment projects. This research also examines a new method to predict the optimal year to sell the investment. A case study is used to illustrate the use of a model to assess the feasibility assessment of a extra facilities in electricty project. The conclusion found that Net Present Value, Internal Rate of Return, Modified Internal Rate of Return and Payback Period combining with sensitivity analysis, scenario anaysis and simulation to analye the project risk should be used to assess feasibility model study of extra electricity facilities investment projects.","PeriodicalId":500639,"journal":{"name":"Proceeding of The International Seminar on Business Economics Social Science and Technology (ISBEST)","volume":"5 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-11-02","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Assessment Models for Feasibility Study of Extra Electricity Facilities Investment Projects\",\"authors\":\"Matsaid Budi Reksono, Abdul Rahman Rahim\",\"doi\":\"10.33830/isbest.v3i1.1240\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Numerous recent researches have revisited the issue of the potential conflicting feasibility method of competing investment projects. This paper provides an example of an assessment models can be built and used for feasibility analysis of electricity investment projects. An overview of feasibility assessment methods is presented, consist of general assessment model, risk analysis methods, and a new optimization method used to estimate strategic and financing requirements of electricity investment projects. This research also examines a new method to predict the optimal year to sell the investment. A case study is used to illustrate the use of a model to assess the feasibility assessment of a extra facilities in electricty project. The conclusion found that Net Present Value, Internal Rate of Return, Modified Internal Rate of Return and Payback Period combining with sensitivity analysis, scenario anaysis and simulation to analye the project risk should be used to assess feasibility model study of extra electricity facilities investment projects.\",\"PeriodicalId\":500639,\"journal\":{\"name\":\"Proceeding of The International Seminar on Business Economics Social Science and Technology (ISBEST)\",\"volume\":\"5 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-11-02\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Proceeding of The International Seminar on Business Economics Social Science and Technology (ISBEST)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.33830/isbest.v3i1.1240\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceeding of The International Seminar on Business Economics Social Science and Technology (ISBEST)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.33830/isbest.v3i1.1240","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

最近的许多研究都重新审视了竞争投资项目的潜在冲突可行性方法问题。本文给出了电力投资项目可行性分析中可建立评价模型的实例。概述了电力投资项目可行性评估方法,包括一般评估模型、风险分析方法和一种新的优化方法,用于估计电力投资项目的战略和融资需求。本研究还探讨了一种预测投资最佳卖出年份的新方法。通过一个实例,说明了利用模型对电力项目中附加设施进行可行性评估的方法。结论认为,应采用净现值、内部收益率、修正内部收益率和投资回收期结合敏感性分析、情景分析和模拟分析项目风险的方法来评估增建电力设施投资项目的可行性模型研究。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Assessment Models for Feasibility Study of Extra Electricity Facilities Investment Projects
Numerous recent researches have revisited the issue of the potential conflicting feasibility method of competing investment projects. This paper provides an example of an assessment models can be built and used for feasibility analysis of electricity investment projects. An overview of feasibility assessment methods is presented, consist of general assessment model, risk analysis methods, and a new optimization method used to estimate strategic and financing requirements of electricity investment projects. This research also examines a new method to predict the optimal year to sell the investment. A case study is used to illustrate the use of a model to assess the feasibility assessment of a extra facilities in electricty project. The conclusion found that Net Present Value, Internal Rate of Return, Modified Internal Rate of Return and Payback Period combining with sensitivity analysis, scenario anaysis and simulation to analye the project risk should be used to assess feasibility model study of extra electricity facilities investment projects.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Iceberg Exploration And The “U” Process As A Learning Method In Religious Moderation Strengthening Training Analysis of Monetary Policy Intervention and Macroeconomic Variable Shocks Against Capital Inflow in 4 Emerging Countries ASEAN The Effect of Receivable Turnover on Working Capital of Automotive Companies During The COVID-19 Pancemic, Through Liquidity as an Intervening Variable Efforts to Improve the Quality of Quicklime in Handling Acid Mine Drainage: A Case Study at PT. TCM The Role of Sugar Cane Plantations to Improve the Welfare of Sugar Cane Farmers in an Islamic Perspective
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1