{"title":"基于网站的建设项目计划评估电子监控应用程序设计","authors":"","doi":"10.30534/ijeter/2023/0611122023","DOIUrl":null,"url":null,"abstract":"A construction project is a series of interrelated activities to achieve certain goals (building/construction) within certain time, cost and quality limits. Rehabilitation and Reconstruction is one of the post-disaster disaster management projects. The success of a project can not only be seen from the completion time and final results of the project, but one important factor is the project progress report which is always monitored. E-monitoring is the supervision and monitoring of work processes through the use of information technology. In this research, the system development method used is the waterfall method and the system testing method uses black box testing. The monitoring and evaluation system for construction projects in rehabilitation and reconstruction at the Central Sulawesi Regional Settlement Infrastructure Center can display information about the progress of construction projects for rehabilitation and reconstruction at the Central Sulawesi Regional Settlement Infrastructure Center. This system can also speed up data searches, data processing and can process data","PeriodicalId":13964,"journal":{"name":"International Journal of Emerging Trends in Engineering Research","volume":"53 30","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2023-12-07","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Design of E-Monitoring Application for Construction Project Program Evaluation Website Based\",\"authors\":\"\",\"doi\":\"10.30534/ijeter/2023/0611122023\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"A construction project is a series of interrelated activities to achieve certain goals (building/construction) within certain time, cost and quality limits. Rehabilitation and Reconstruction is one of the post-disaster disaster management projects. The success of a project can not only be seen from the completion time and final results of the project, but one important factor is the project progress report which is always monitored. E-monitoring is the supervision and monitoring of work processes through the use of information technology. In this research, the system development method used is the waterfall method and the system testing method uses black box testing. The monitoring and evaluation system for construction projects in rehabilitation and reconstruction at the Central Sulawesi Regional Settlement Infrastructure Center can display information about the progress of construction projects for rehabilitation and reconstruction at the Central Sulawesi Regional Settlement Infrastructure Center. This system can also speed up data searches, data processing and can process data\",\"PeriodicalId\":13964,\"journal\":{\"name\":\"International Journal of Emerging Trends in Engineering Research\",\"volume\":\"53 30\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-12-07\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"International Journal of Emerging Trends in Engineering Research\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.30534/ijeter/2023/0611122023\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q2\",\"JCRName\":\"Engineering\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Journal of Emerging Trends in Engineering Research","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.30534/ijeter/2023/0611122023","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q2","JCRName":"Engineering","Score":null,"Total":0}
引用次数: 0

摘要

建设项目是在一定的时间、成本和质量限制下,为达到一定的目标(建筑/施工)而进行的一系列相互关联的活动。恢复与重建是灾后灾害管理项目之一。一个项目的成功不仅可以从项目的完成时间和最终结果来看,一个重要的因素是始终受到监控的项目进度报告。电子监控是通过使用信息技术对工作过程进行监督和监控。本研究使用的系统开发方法是瀑布法,系统测试方法是黑盒测试。中苏拉威西区域定居基础设施中心修复重建建设项目监测评估系统可以显示中苏拉威西区域定居基础设施中心修复重建建设项目进度信息。本系统还可以加快数据查询、数据处理和数据处理的速度
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Design of E-Monitoring Application for Construction Project Program Evaluation Website Based
A construction project is a series of interrelated activities to achieve certain goals (building/construction) within certain time, cost and quality limits. Rehabilitation and Reconstruction is one of the post-disaster disaster management projects. The success of a project can not only be seen from the completion time and final results of the project, but one important factor is the project progress report which is always monitored. E-monitoring is the supervision and monitoring of work processes through the use of information technology. In this research, the system development method used is the waterfall method and the system testing method uses black box testing. The monitoring and evaluation system for construction projects in rehabilitation and reconstruction at the Central Sulawesi Regional Settlement Infrastructure Center can display information about the progress of construction projects for rehabilitation and reconstruction at the Central Sulawesi Regional Settlement Infrastructure Center. This system can also speed up data searches, data processing and can process data
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
70
期刊最新文献
An Effective Data Fusion Methodology for Multi-modal Emotion Recognition: A Survey The Transformative Role of Microsoft Azure AI in Healthcare Low Costs Electrical Calibration System of SLM with the Uncertainty Measurements Compared with Primary System Platform Brūel & Kjær type 3630 Analytical Model of a New Acoustic Conductor Lined with Linear Increasing Perforated Area Enhanced Sleep Quality Through Light Modulation IoT-Based Approach ESP32 with Philips Hue Integration
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1