{"title":"利用石川图表确定假设优先次序的案例研究","authors":"Matthew Barsalou","doi":"10.2478/mspe-2023-0042","DOIUrl":null,"url":null,"abstract":"Abstract The objective of this paper is to explore a multidisciplinary problem-solving team investigating a customer-reported failure using an Ishikawa diagram with a spreadsheet for prioritizing and tracking investigation actions in a manufacturing organization. A case study methodology is used with the actions taken to investigate a customer-reported failure explained. The highest priority failure hypothesis was found to be unrelated to the failure. Two medium-rated hypotheses were found to be causing the problem; leakage was occurring at the connection between two components due to a diameter deviation of one of the components. Identifying and prioritizing hypotheses from the Ishikawa diagram provided structure to the investigation and gave the investigation team leader a tool for tracking the investigation actions. This approach is suitable for all types of failure investigations in which an Ishikawa diagram is used to list hypotheses.","PeriodicalId":44097,"journal":{"name":"Management Systems in Production Engineering","volume":" 5","pages":"381 - 388"},"PeriodicalIF":1.4000,"publicationDate":"2023-12-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Case Study in Hypothesis Prioritization with Ishikawa Diagrams\",\"authors\":\"Matthew Barsalou\",\"doi\":\"10.2478/mspe-2023-0042\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Abstract The objective of this paper is to explore a multidisciplinary problem-solving team investigating a customer-reported failure using an Ishikawa diagram with a spreadsheet for prioritizing and tracking investigation actions in a manufacturing organization. A case study methodology is used with the actions taken to investigate a customer-reported failure explained. The highest priority failure hypothesis was found to be unrelated to the failure. Two medium-rated hypotheses were found to be causing the problem; leakage was occurring at the connection between two components due to a diameter deviation of one of the components. Identifying and prioritizing hypotheses from the Ishikawa diagram provided structure to the investigation and gave the investigation team leader a tool for tracking the investigation actions. This approach is suitable for all types of failure investigations in which an Ishikawa diagram is used to list hypotheses.\",\"PeriodicalId\":44097,\"journal\":{\"name\":\"Management Systems in Production Engineering\",\"volume\":\" 5\",\"pages\":\"381 - 388\"},\"PeriodicalIF\":1.4000,\"publicationDate\":\"2023-12-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Management Systems in Production Engineering\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.2478/mspe-2023-0042\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q4\",\"JCRName\":\"ENGINEERING, INDUSTRIAL\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Management Systems in Production Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2478/mspe-2023-0042","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"ENGINEERING, INDUSTRIAL","Score":null,"Total":0}
Case Study in Hypothesis Prioritization with Ishikawa Diagrams
Abstract The objective of this paper is to explore a multidisciplinary problem-solving team investigating a customer-reported failure using an Ishikawa diagram with a spreadsheet for prioritizing and tracking investigation actions in a manufacturing organization. A case study methodology is used with the actions taken to investigate a customer-reported failure explained. The highest priority failure hypothesis was found to be unrelated to the failure. Two medium-rated hypotheses were found to be causing the problem; leakage was occurring at the connection between two components due to a diameter deviation of one of the components. Identifying and prioritizing hypotheses from the Ishikawa diagram provided structure to the investigation and gave the investigation team leader a tool for tracking the investigation actions. This approach is suitable for all types of failure investigations in which an Ishikawa diagram is used to list hypotheses.