{"title":"比较科威特 DBB 和 DB 公共建筑项目的时间和成本绩效","authors":"Sarah Soud Salem Al-enezi,&nbsp;Ruqaya Al Sabah","doi":"10.1016/j.jer.2023.11.016","DOIUrl":null,"url":null,"abstract":"<div><div>Kuwait is an enormous construction site as many vital public projects are under construction or in preparatory stages to achieve the vision of a New Kuwait by 2035. However, the new Public Tenders Law No. 49 of 2016 authorized the sole operation of the Design-Bid-Build (DBB) method as the delivery system method, preventing the employment of Design-Build (DB). Hence, this research undertook a comparative analysis of cost and time performance of DBB and DB public construction projects in Kuwait for the first time, marking the originality of this study. Moreover, 160 projects were collected from four government entities. Then, the total collected projects were categorized based on contract types and project sizes depending on contract cost. This research has recognized that DB has superior performance compared to DBB regarding cost growth for all collected projects, both contract types, projects of less than 300,000 KD, and projects between 300,000 and 12 million KD. No statistically significant differences between DBB and DB projects regarding schedule growth were found for all collected projects, both contract types and project sizes. Furthermore, the findings indicated that the DBB projects’ construction intensity was faster than that of DB projects with a value between 300,00 KD and 12 million KD. For projects that had a value of more than 12 million KD, the DB projects’ construction intensity was faster than that of DBB projects. Hence, it is concluded that the issue is not with the DB delivery systems themselves, but rather with the deployment of these systems.</div></div>","PeriodicalId":48803,"journal":{"name":"Journal of Engineering Research","volume":"12 4","pages":"Pages 680-690"},"PeriodicalIF":0.9000,"publicationDate":"2024-12-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Comparing time and cost performance of DBB and DB public construction projects in Kuwait\",\"authors\":\"Sarah Soud Salem Al-enezi,&nbsp;Ruqaya Al Sabah\",\"doi\":\"10.1016/j.jer.2023.11.016\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"<div><div>Kuwait is an enormous construction site as many vital public projects are under construction or in preparatory stages to achieve the vision of a New Kuwait by 2035. However, the new Public Tenders Law No. 49 of 2016 authorized the sole operation of the Design-Bid-Build (DBB) method as the delivery system method, preventing the employment of Design-Build (DB). Hence, this research undertook a comparative analysis of cost and time performance of DBB and DB public construction projects in Kuwait for the first time, marking the originality of this study. Moreover, 160 projects were collected from four government entities. Then, the total collected projects were categorized based on contract types and project sizes depending on contract cost. This research has recognized that DB has superior performance compared to DBB regarding cost growth for all collected projects, both contract types, projects of less than 300,000 KD, and projects between 300,000 and 12 million KD. No statistically significant differences between DBB and DB projects regarding schedule growth were found for all collected projects, both contract types and project sizes. Furthermore, the findings indicated that the DBB projects’ construction intensity was faster than that of DB projects with a value between 300,00 KD and 12 million KD. For projects that had a value of more than 12 million KD, the DB projects’ construction intensity was faster than that of DBB projects. Hence, it is concluded that the issue is not with the DB delivery systems themselves, but rather with the deployment of these systems.</div></div>\",\"PeriodicalId\":48803,\"journal\":{\"name\":\"Journal of Engineering Research\",\"volume\":\"12 4\",\"pages\":\"Pages 680-690\"},\"PeriodicalIF\":0.9000,\"publicationDate\":\"2024-12-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Journal of Engineering Research\",\"FirstCategoryId\":\"5\",\"ListUrlMain\":\"https://www.sciencedirect.com/science/article/pii/S2307187723003218\",\"RegionNum\":4,\"RegionCategory\":\"工程技术\",\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q3\",\"JCRName\":\"ENGINEERING, MULTIDISCIPLINARY\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Engineering Research","FirstCategoryId":"5","ListUrlMain":"https://www.sciencedirect.com/science/article/pii/S2307187723003218","RegionNum":4,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"ENGINEERING, MULTIDISCIPLINARY","Score":null,"Total":0}
引用次数: 0
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Comparing time and cost performance of DBB and DB public construction projects in Kuwait
Kuwait is an enormous construction site as many vital public projects are under construction or in preparatory stages to achieve the vision of a New Kuwait by 2035. However, the new Public Tenders Law No. 49 of 2016 authorized the sole operation of the Design-Bid-Build (DBB) method as the delivery system method, preventing the employment of Design-Build (DB). Hence, this research undertook a comparative analysis of cost and time performance of DBB and DB public construction projects in Kuwait for the first time, marking the originality of this study. Moreover, 160 projects were collected from four government entities. Then, the total collected projects were categorized based on contract types and project sizes depending on contract cost. This research has recognized that DB has superior performance compared to DBB regarding cost growth for all collected projects, both contract types, projects of less than 300,000 KD, and projects between 300,000 and 12 million KD. No statistically significant differences between DBB and DB projects regarding schedule growth were found for all collected projects, both contract types and project sizes. Furthermore, the findings indicated that the DBB projects’ construction intensity was faster than that of DB projects with a value between 300,00 KD and 12 million KD. For projects that had a value of more than 12 million KD, the DB projects’ construction intensity was faster than that of DBB projects. Hence, it is concluded that the issue is not with the DB delivery systems themselves, but rather with the deployment of these systems.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
Journal of Engineering Research
Journal of Engineering Research ENGINEERING, MULTIDISCIPLINARY-
CiteScore
1.60
自引率
10.00%
发文量
181
审稿时长
20 weeks
期刊介绍: Journal of Engineering Research (JER) is a international, peer reviewed journal which publishes full length original research papers, reviews, case studies related to all areas of Engineering such as: Civil, Mechanical, Industrial, Electrical, Computer, Chemical, Petroleum, Aerospace, Architectural, Biomedical, Coastal, Environmental, Marine & Ocean, Metallurgical & Materials, software, Surveying, Systems and Manufacturing Engineering. In particular, JER focuses on innovative approaches and methods that contribute to solving the environmental and manufacturing problems, which exist primarily in the Arabian Gulf region and the Middle East countries. Kuwait University used to publish the Journal "Kuwait Journal of Science and Engineering" (ISSN: 1024-8684), which included Science and Engineering articles since 1974. In 2011 the decision was taken to split KJSE into two independent Journals - "Journal of Engineering Research "(JER) and "Kuwait Journal of Science" (KJS).
期刊最新文献
Investigation of optimal feature for milling chatter identification using supervised machine learning techniques Prediction of tensile strength of biochar filled polylactic acid composites via box-behnken design Single-Walled Carbon Nanotube (SWCNT) thin films via automatic spray coating and nitric acid vapor treatment Experimental studies on performance and emission measures of a 4-stroke compression ignition engine using palm bio-diesel blended with N-butanol Performance evaluation of turbulent circular heat exchanger with a novel flow deflector-type baffle plate
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1