使用 Microsoft Project 进行成本和时间比较分析(案例研究:泗水丹绒霹雳柏联码头结构加固项目第七期工程)

Mohammad Rizal Mantovani, Michella Beatrix
{"title":"使用 Microsoft Project 进行成本和时间比较分析(案例研究:泗水丹绒霹雳柏联码头结构加固项目第七期工程)","authors":"Mohammad Rizal Mantovani, Michella Beatrix","doi":"10.30736/cvl.v8i2.1110","DOIUrl":null,"url":null,"abstract":"Sometimes the execution of a project does not proceed smoothly because there are barriers that impede the present work. Uncertain weather conditions are one of the most common challenges encountered in the field during the Tanjung Perak Diamond Pier Structure Strengthening project in Surabaya. This is because the initial planning did not account for the weather conditions that would occur during the project's implementation. As a result, rescheduling is carried out to generate a reasonable and realistic timetable. Many strategies are employed in scheduling, with the expectation that the method will help in planning and scheduling. The goal of this research is to determine the time necessary for project implementation after rescheduling. This research is analytical in character. Secondary data, such as schedules and Budget Plans (RAB), are collected by directly requesting the necessary data from related parties, then evaluating the initial schedule, and finally preparing a new schedule using Microsoft Project tools and the Critical Path Method (CPM).  The results of this study obtained a rescheduling duration of 99 days, 22 days faster than the actual planned duration of 121 days, and a fee of IDR. 28,535,441,605 of the initial planned cost of IDR. 35,017,986,296.10.","PeriodicalId":282199,"journal":{"name":"Civilla : Jurnal Teknik Sipil Universitas Islam Lamongan","volume":"1 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2023-09-19","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Cost and Time Comparison Analysis Using Microsoft Project (Case Study: Phase VII Work of the Surabaya Tanjung Perak Berlian Pier Structure Strengthening Project)\",\"authors\":\"Mohammad Rizal Mantovani, Michella Beatrix\",\"doi\":\"10.30736/cvl.v8i2.1110\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Sometimes the execution of a project does not proceed smoothly because there are barriers that impede the present work. Uncertain weather conditions are one of the most common challenges encountered in the field during the Tanjung Perak Diamond Pier Structure Strengthening project in Surabaya. This is because the initial planning did not account for the weather conditions that would occur during the project's implementation. As a result, rescheduling is carried out to generate a reasonable and realistic timetable. Many strategies are employed in scheduling, with the expectation that the method will help in planning and scheduling. The goal of this research is to determine the time necessary for project implementation after rescheduling. This research is analytical in character. Secondary data, such as schedules and Budget Plans (RAB), are collected by directly requesting the necessary data from related parties, then evaluating the initial schedule, and finally preparing a new schedule using Microsoft Project tools and the Critical Path Method (CPM).  The results of this study obtained a rescheduling duration of 99 days, 22 days faster than the actual planned duration of 121 days, and a fee of IDR. 28,535,441,605 of the initial planned cost of IDR. 35,017,986,296.10.\",\"PeriodicalId\":282199,\"journal\":{\"name\":\"Civilla : Jurnal Teknik Sipil Universitas Islam Lamongan\",\"volume\":\"1 1\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-09-19\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Civilla : Jurnal Teknik Sipil Universitas Islam Lamongan\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.30736/cvl.v8i2.1110\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Civilla : Jurnal Teknik Sipil Universitas Islam Lamongan","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.30736/cvl.v8i2.1110","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

有时,由于存在阻碍当前工作的障碍,项目的执行并不顺利。在泗水丹戎霹雳钻石码头结构加固项目中,不确定的天气条件是现场遇到的最常见挑战之一。这是因为最初的规划没有考虑到项目实施过程中会出现的天气状况。因此,需要重新制定时间安排,以制定合理、现实的时间表。在时间安排中采用了许多策略,期望这些方法有助于规划和时间安排。本研究的目标是确定重新安排后项目实施所需的时间。本研究具有分析性。通过直接向相关方索取必要的数据来收集二级数据,如进度表和预算计划 (RAB),然后评估初始进度表,最后使用 Microsoft Project 工具和关键路径法 (CPM) 编制新的进度表。 研究结果表明,重新安排的工期为 99 天,比实际计划工期 121 天快 22 天,费用为 IDR.初步计划费用为 28,535,441,605 伊朗里亚尔。35,017,986,296.10.
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Cost and Time Comparison Analysis Using Microsoft Project (Case Study: Phase VII Work of the Surabaya Tanjung Perak Berlian Pier Structure Strengthening Project)
Sometimes the execution of a project does not proceed smoothly because there are barriers that impede the present work. Uncertain weather conditions are one of the most common challenges encountered in the field during the Tanjung Perak Diamond Pier Structure Strengthening project in Surabaya. This is because the initial planning did not account for the weather conditions that would occur during the project's implementation. As a result, rescheduling is carried out to generate a reasonable and realistic timetable. Many strategies are employed in scheduling, with the expectation that the method will help in planning and scheduling. The goal of this research is to determine the time necessary for project implementation after rescheduling. This research is analytical in character. Secondary data, such as schedules and Budget Plans (RAB), are collected by directly requesting the necessary data from related parties, then evaluating the initial schedule, and finally preparing a new schedule using Microsoft Project tools and the Critical Path Method (CPM).  The results of this study obtained a rescheduling duration of 99 days, 22 days faster than the actual planned duration of 121 days, and a fee of IDR. 28,535,441,605 of the initial planned cost of IDR. 35,017,986,296.10.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Analysis of Concrete Strength Analysis K-250 With Additional Asbestos Waste Powder as a Substitute of Fine Aggregate The Shear Strength of Clay Stabilized with Palm Bunch Ash and Cement Evaluation of Wastewater Management System Implementation in Tarakan City Selumit Beach Area Analysis of Determinants of Consumer Decisions on the Use of Trans Banyumas and Gojek Cost and Time Comparison Analysis Using Microsoft Project (Case Study: Phase VII Work of the Surabaya Tanjung Perak Berlian Pier Structure Strengthening Project)
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1