PSO-LSSVM 在预测和分析慢速钻进(穿透率)中的应用

Wilma Latuny
{"title":"PSO-LSSVM 在预测和分析慢速钻进(穿透率)中的应用","authors":"Wilma Latuny","doi":"10.25299/jeee.2023.14004","DOIUrl":null,"url":null,"abstract":"The benefits of drilling include reducing the total time, maintaining the lowest possible risk, saving costs, and increasing efficiency, which occurs in (the planning and exploration stages). Slow drilling refers to a rate of penetration (ROP) that is not at the desired level. ROP characterizes the speed at which the drill bit penetrates the underlying rock to deepen the borehole, as it is directly related to controlling the speed and efficiency of drilling which ultimately impacts development costs. Predicting ROP is a very important step to optimize drilling with Machine Learning that can assist in solving complex problems with maximum possible efficiency. The model used is PSO-LSSVM treats the penetration drill bit as a continuous process. It takes drilling data sequentially, continuously predicts ROP, and achieves better ROP prediction results. In this case, Hole Depth, weight on bit (WOB), Bit Rotation per minute (RPM), Torque, Bit Depth, Time of Penetration, Hook Load, and Standpipe Pressure, demonstrated influence in keeping ROP at a high level. According to the results, the PSO-LSSVM algorithm can be used for the prediction of ROP in well X. thus providing a solution for prediction and control of operating effects which can result in a fast penetration rate and better efficiency in drilling.","PeriodicalId":33635,"journal":{"name":"Journal of Earth Energy Engineering","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2024-01-10","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"APPLICATION OF PSO-LSSVM IN PREDICTION AND ANALYSIS OF SLOW DRILLING (RATE OF PENETRATION)\",\"authors\":\"Wilma Latuny\",\"doi\":\"10.25299/jeee.2023.14004\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The benefits of drilling include reducing the total time, maintaining the lowest possible risk, saving costs, and increasing efficiency, which occurs in (the planning and exploration stages). Slow drilling refers to a rate of penetration (ROP) that is not at the desired level. ROP characterizes the speed at which the drill bit penetrates the underlying rock to deepen the borehole, as it is directly related to controlling the speed and efficiency of drilling which ultimately impacts development costs. Predicting ROP is a very important step to optimize drilling with Machine Learning that can assist in solving complex problems with maximum possible efficiency. The model used is PSO-LSSVM treats the penetration drill bit as a continuous process. It takes drilling data sequentially, continuously predicts ROP, and achieves better ROP prediction results. In this case, Hole Depth, weight on bit (WOB), Bit Rotation per minute (RPM), Torque, Bit Depth, Time of Penetration, Hook Load, and Standpipe Pressure, demonstrated influence in keeping ROP at a high level. According to the results, the PSO-LSSVM algorithm can be used for the prediction of ROP in well X. thus providing a solution for prediction and control of operating effects which can result in a fast penetration rate and better efficiency in drilling.\",\"PeriodicalId\":33635,\"journal\":{\"name\":\"Journal of Earth Energy Engineering\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2024-01-10\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Journal of Earth Energy Engineering\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.25299/jeee.2023.14004\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Earth Energy Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.25299/jeee.2023.14004","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

钻井的好处包括缩短总时间、保持尽可能低的风险、节约成本和提高效率,这些都发生在(规划和勘探阶段)。慢钻是指钻进速度(ROP)未达到预期水平。ROP 表示钻头钻进下层岩石以加深钻孔的速度,因为它与控制钻进速度和效率直接相关,而钻进速度和效率最终会影响开发成本。预测 ROP 是利用机器学习优化钻井的重要一步,机器学习可以帮助以最高效率解决复杂问题。所使用的 PSO-LSSVM 模型将穿透钻头视为一个连续过程。它按顺序获取钻井数据,连续预测 ROP,并获得更好的 ROP 预测结果。在本案例中,钻孔深度、钻头重量(WOB)、钻头每分钟转速(RPM)、扭矩、钻头深度、穿透时间、挂钩载荷和立管压力对保持高 ROP 均有影响。根据研究结果,PSO-LSSVM 算法可用于预测 X 井的 ROP,从而为预测和控制操作效果提供解决方案,从而实现更快的穿透率和更高的钻井效率。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
APPLICATION OF PSO-LSSVM IN PREDICTION AND ANALYSIS OF SLOW DRILLING (RATE OF PENETRATION)
The benefits of drilling include reducing the total time, maintaining the lowest possible risk, saving costs, and increasing efficiency, which occurs in (the planning and exploration stages). Slow drilling refers to a rate of penetration (ROP) that is not at the desired level. ROP characterizes the speed at which the drill bit penetrates the underlying rock to deepen the borehole, as it is directly related to controlling the speed and efficiency of drilling which ultimately impacts development costs. Predicting ROP is a very important step to optimize drilling with Machine Learning that can assist in solving complex problems with maximum possible efficiency. The model used is PSO-LSSVM treats the penetration drill bit as a continuous process. It takes drilling data sequentially, continuously predicts ROP, and achieves better ROP prediction results. In this case, Hole Depth, weight on bit (WOB), Bit Rotation per minute (RPM), Torque, Bit Depth, Time of Penetration, Hook Load, and Standpipe Pressure, demonstrated influence in keeping ROP at a high level. According to the results, the PSO-LSSVM algorithm can be used for the prediction of ROP in well X. thus providing a solution for prediction and control of operating effects which can result in a fast penetration rate and better efficiency in drilling.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
10
审稿时长
8 weeks
期刊最新文献
APPLICATION OF PSO-LSSVM IN PREDICTION AND ANALYSIS OF SLOW DRILLING (RATE OF PENETRATION) EVALUATION OF CONTINUOUS AND WATER ALTERNATING GAS (WAG) CO2 INJECTION ON X FIELD RECOVERY FACTOR The Effect of Different Gas Water Ratio on Recovery Factor and CO2 Storage Capacity in Water Alternating Gas Injection. A Case Study: “V” Field Development, North Sea Oil Formation Volume Factor Prediction Using Artificial Neural Network: A Case Study of Niger Delta Crudes Fracturing Fluid Optimization in Limestone Formation Using Guar Gum Crosslinked Fluid
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1