{"title":"工作、工具、机器和两组不同的横向机器人的综合调度","authors":"Andy Ham;Myoung-Ju Park;John Fowler","doi":"10.1109/TSM.2023.3343633","DOIUrl":null,"url":null,"abstract":"This paper studies simultaneous scheduling of production and material transfer that arises in the semiconductor photolithography area. In particular, the right reticle and right job both need to be present to process the job. Jobs are transferred by a material handling system that employees a fleet of vehicles. Reticles serving as an auxiliary resource are also transferred from one place to another by a different set of vehicles. This intricate scheduling challenge, encompassing jobs, reticles, machines, and two distinct sets of vehicles, is explored here for the first time. The paper introduces a multi-stage methodology that involves relaxation, a constructive heuristic, constraint programming, and a warm-start approach to address this complex problem.","PeriodicalId":451,"journal":{"name":"IEEE Transactions on Semiconductor Manufacturing","volume":"37 1","pages":"27-37"},"PeriodicalIF":2.3000,"publicationDate":"2023-12-15","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Integrated Scheduling of Jobs, Tools, Machines, and Two Different Set of Transbots\",\"authors\":\"Andy Ham;Myoung-Ju Park;John Fowler\",\"doi\":\"10.1109/TSM.2023.3343633\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This paper studies simultaneous scheduling of production and material transfer that arises in the semiconductor photolithography area. In particular, the right reticle and right job both need to be present to process the job. Jobs are transferred by a material handling system that employees a fleet of vehicles. Reticles serving as an auxiliary resource are also transferred from one place to another by a different set of vehicles. This intricate scheduling challenge, encompassing jobs, reticles, machines, and two distinct sets of vehicles, is explored here for the first time. The paper introduces a multi-stage methodology that involves relaxation, a constructive heuristic, constraint programming, and a warm-start approach to address this complex problem.\",\"PeriodicalId\":451,\"journal\":{\"name\":\"IEEE Transactions on Semiconductor Manufacturing\",\"volume\":\"37 1\",\"pages\":\"27-37\"},\"PeriodicalIF\":2.3000,\"publicationDate\":\"2023-12-15\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"IEEE Transactions on Semiconductor Manufacturing\",\"FirstCategoryId\":\"5\",\"ListUrlMain\":\"https://ieeexplore.ieee.org/document/10362968/\",\"RegionNum\":3,\"RegionCategory\":\"工程技术\",\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q2\",\"JCRName\":\"ENGINEERING, ELECTRICAL & ELECTRONIC\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"IEEE Transactions on Semiconductor Manufacturing","FirstCategoryId":"5","ListUrlMain":"https://ieeexplore.ieee.org/document/10362968/","RegionNum":3,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q2","JCRName":"ENGINEERING, ELECTRICAL & ELECTRONIC","Score":null,"Total":0}
Integrated Scheduling of Jobs, Tools, Machines, and Two Different Set of Transbots
This paper studies simultaneous scheduling of production and material transfer that arises in the semiconductor photolithography area. In particular, the right reticle and right job both need to be present to process the job. Jobs are transferred by a material handling system that employees a fleet of vehicles. Reticles serving as an auxiliary resource are also transferred from one place to another by a different set of vehicles. This intricate scheduling challenge, encompassing jobs, reticles, machines, and two distinct sets of vehicles, is explored here for the first time. The paper introduces a multi-stage methodology that involves relaxation, a constructive heuristic, constraint programming, and a warm-start approach to address this complex problem.
期刊介绍:
The IEEE Transactions on Semiconductor Manufacturing addresses the challenging problems of manufacturing complex microelectronic components, especially very large scale integrated circuits (VLSI). Manufacturing these products requires precision micropatterning, precise control of materials properties, ultraclean work environments, and complex interactions of chemical, physical, electrical and mechanical processes.