不停顿不相交轨迹问题

IF 0.9 4区 数学 Q3 MATHEMATICS, APPLIED Discrete Optimization Pub Date : 2024-04-05 DOI:10.1016/j.disopt.2024.100837
Benno Hoch , Frauke Liers , Sarah Neumann , Francisco Javier Zaragoza Martínez
{"title":"不停顿不相交轨迹问题","authors":"Benno Hoch ,&nbsp;Frauke Liers ,&nbsp;Sarah Neumann ,&nbsp;Francisco Javier Zaragoza Martínez","doi":"10.1016/j.disopt.2024.100837","DOIUrl":null,"url":null,"abstract":"<div><p>Consider an undirected network with traversal times on its edges and a set of commodities with connection requests from sources to destinations and release dates. The non-stop disjoint trajectories problem is to find trajectories that fulfill all requests, such that the commodities never meet. In this extension to the <span><math><mi>NP</mi></math></span>-complete disjoint paths problem, trajectories must satisfy a non-stop condition, which disallows waiting at vertices or along arcs. This problem variant appears, for example, when disjoint aircraft trajectories shall be determined or in bufferless packet routing. We study the border of tractability for feasibility and optimization problems on three graph classes that are frequently used where space and time are discretized simultaneously: the path, the grid, and the mesh. We show that if all commodities have a common release date, feasibility can be decided in polynomial time on paths. For the unbounded mesh and unit-costs, we show how to construct optimal trajectories. In contrast, if commodities have individual release intervals and turns are forbidden, then even feasibility is <span><math><mi>NP</mi></math></span>-complete for the path. For the mesh and arbitrary edge costs, with individual release dates and turning abilities of commodities restricted to at most 90°, we show that optimization and approximation are not fixed-parameter tractable.</p></div>","PeriodicalId":50571,"journal":{"name":"Discrete Optimization","volume":"52 ","pages":"Article 100837"},"PeriodicalIF":0.9000,"publicationDate":"2024-04-05","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://www.sciencedirect.com/science/article/pii/S1572528624000161/pdfft?md5=58a07aefa7044d86caaa7f7f71ef6b5b&pid=1-s2.0-S1572528624000161-main.pdf","citationCount":"0","resultStr":"{\"title\":\"The non-stop disjoint trajectories problem\",\"authors\":\"Benno Hoch ,&nbsp;Frauke Liers ,&nbsp;Sarah Neumann ,&nbsp;Francisco Javier Zaragoza Martínez\",\"doi\":\"10.1016/j.disopt.2024.100837\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"<div><p>Consider an undirected network with traversal times on its edges and a set of commodities with connection requests from sources to destinations and release dates. The non-stop disjoint trajectories problem is to find trajectories that fulfill all requests, such that the commodities never meet. In this extension to the <span><math><mi>NP</mi></math></span>-complete disjoint paths problem, trajectories must satisfy a non-stop condition, which disallows waiting at vertices or along arcs. This problem variant appears, for example, when disjoint aircraft trajectories shall be determined or in bufferless packet routing. We study the border of tractability for feasibility and optimization problems on three graph classes that are frequently used where space and time are discretized simultaneously: the path, the grid, and the mesh. We show that if all commodities have a common release date, feasibility can be decided in polynomial time on paths. For the unbounded mesh and unit-costs, we show how to construct optimal trajectories. In contrast, if commodities have individual release intervals and turns are forbidden, then even feasibility is <span><math><mi>NP</mi></math></span>-complete for the path. For the mesh and arbitrary edge costs, with individual release dates and turning abilities of commodities restricted to at most 90°, we show that optimization and approximation are not fixed-parameter tractable.</p></div>\",\"PeriodicalId\":50571,\"journal\":{\"name\":\"Discrete Optimization\",\"volume\":\"52 \",\"pages\":\"Article 100837\"},\"PeriodicalIF\":0.9000,\"publicationDate\":\"2024-04-05\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"https://www.sciencedirect.com/science/article/pii/S1572528624000161/pdfft?md5=58a07aefa7044d86caaa7f7f71ef6b5b&pid=1-s2.0-S1572528624000161-main.pdf\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Discrete Optimization\",\"FirstCategoryId\":\"100\",\"ListUrlMain\":\"https://www.sciencedirect.com/science/article/pii/S1572528624000161\",\"RegionNum\":4,\"RegionCategory\":\"数学\",\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q3\",\"JCRName\":\"MATHEMATICS, APPLIED\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Discrete Optimization","FirstCategoryId":"100","ListUrlMain":"https://www.sciencedirect.com/science/article/pii/S1572528624000161","RegionNum":4,"RegionCategory":"数学","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"MATHEMATICS, APPLIED","Score":null,"Total":0}
引用次数: 0

摘要

考虑一个边上有遍历时间的无向网络,以及一组具有从来源地到目的地的连接请求和发布日期的商品。不停顿不相交轨迹问题就是要找到满足所有请求的轨迹,使商品永远不会相遇。在这一 NP-完全不相交路径问题的扩展中,轨迹必须满足不停止条件,即不允许在顶点或沿弧等待。例如,在确定不相交的飞机轨迹或无缓冲数据包路由时,就会出现这种问题变体。我们研究了在空间和时间同时离散化的情况下常用的三类图:路径图、网格图和网状图上可行性和优化问题的可处理性边界。我们发现,如果所有商品都有一个共同的发布日期,那么在路径上可以在多项式时间内决定可行性。对于无界网格和单位成本,我们展示了如何构建最优轨迹。相反,如果商品有各自的发布时间间隔,并且禁止转弯,那么即使是路径的可行性也是 NP-complete。对于网格和任意边成本,商品的单独释放日期和转弯能力被限制为最多 90°,我们证明优化和近似都不具有固定参数的可操作性。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
The non-stop disjoint trajectories problem

Consider an undirected network with traversal times on its edges and a set of commodities with connection requests from sources to destinations and release dates. The non-stop disjoint trajectories problem is to find trajectories that fulfill all requests, such that the commodities never meet. In this extension to the NP-complete disjoint paths problem, trajectories must satisfy a non-stop condition, which disallows waiting at vertices or along arcs. This problem variant appears, for example, when disjoint aircraft trajectories shall be determined or in bufferless packet routing. We study the border of tractability for feasibility and optimization problems on three graph classes that are frequently used where space and time are discretized simultaneously: the path, the grid, and the mesh. We show that if all commodities have a common release date, feasibility can be decided in polynomial time on paths. For the unbounded mesh and unit-costs, we show how to construct optimal trajectories. In contrast, if commodities have individual release intervals and turns are forbidden, then even feasibility is NP-complete for the path. For the mesh and arbitrary edge costs, with individual release dates and turning abilities of commodities restricted to at most 90°, we show that optimization and approximation are not fixed-parameter tractable.

求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
Discrete Optimization
Discrete Optimization 管理科学-应用数学
CiteScore
2.10
自引率
9.10%
发文量
30
审稿时长
>12 weeks
期刊介绍: Discrete Optimization publishes research papers on the mathematical, computational and applied aspects of all areas of integer programming and combinatorial optimization. In addition to reports on mathematical results pertinent to discrete optimization, the journal welcomes submissions on algorithmic developments, computational experiments, and novel applications (in particular, large-scale and real-time applications). The journal also publishes clearly labelled surveys, reviews, short notes, and open problems. Manuscripts submitted for possible publication to Discrete Optimization should report on original research, should not have been previously published, and should not be under consideration for publication by any other journal.
期刊最新文献
A polynomial-time algorithm for conformable coloring on regular bipartite and subcubic graphs Generalized min-up/min-down polytopes Editorial Board Anchor-robust project scheduling with non-availability periods Corrigendum to “Bilevel time minimizing transportation problem” [Discrete Optim.] 5 (4) (2008) 714–723
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1