三宝垄 Plasa Simpang Lima 发展的 HBU 分析和交通饱和机会

Alberta Kristi Purwandari, Agung Sugiarto, Lintang Jata Angghita
{"title":"三宝垄 Plasa Simpang Lima 发展的 HBU 分析和交通饱和机会","authors":"Alberta Kristi Purwandari, Agung Sugiarto, Lintang Jata Angghita","doi":"10.24167/praxis.v6i1.11715","DOIUrl":null,"url":null,"abstract":"Simpang Lima Plaza is a Semarang City Government asset which is located in the city center, precisely on Jalan Ahmad Yani, Semarang City. The Plaza Simpang Lima building was built in 1990 with a building area of 38,935 m2. Plaza Simpang Lima is managed by PT Argamukti with a 30 year contract system which will end in 2024. When the contract ends, the age of the Plaza Simpang Lima building will be 30 years, so the use of the Plaza Simpang Lima building needs to be reviewed in relation to its potential utilization. Previous research discussed asset optimization but ignored the impact on traffic potential of selected land uses. This research was conducted to find out the most effective land optimization and the resulting traffic impacts. In this research the analysis was carried out using the Highest and Best Use method to determine alternative uses that are appropriate and technically and financially possible to determine the optimum value and the trip generation method to determine the potential traffic impacts that occur from the selected land use. The results of this research were obtained that the alternative effective use of land is a mall which will result in an increase in land value in the 7 year projection period of IDR 379,259,450,817 with an increase in roundabout delays of 35.23% and the chance of this condition occurring is 36.2%.","PeriodicalId":403309,"journal":{"name":"Praxis : Jurnal Sains, Teknologi, Masyarakat dan Jejaring","volume":"35 3","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2024-03-27","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Analisis HBU dan Peluang Kejenuhan Lalu Lintas pada Pengembangan Plasa Simpang Lima Semarang\",\"authors\":\"Alberta Kristi Purwandari, Agung Sugiarto, Lintang Jata Angghita\",\"doi\":\"10.24167/praxis.v6i1.11715\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Simpang Lima Plaza is a Semarang City Government asset which is located in the city center, precisely on Jalan Ahmad Yani, Semarang City. The Plaza Simpang Lima building was built in 1990 with a building area of 38,935 m2. Plaza Simpang Lima is managed by PT Argamukti with a 30 year contract system which will end in 2024. When the contract ends, the age of the Plaza Simpang Lima building will be 30 years, so the use of the Plaza Simpang Lima building needs to be reviewed in relation to its potential utilization. Previous research discussed asset optimization but ignored the impact on traffic potential of selected land uses. This research was conducted to find out the most effective land optimization and the resulting traffic impacts. In this research the analysis was carried out using the Highest and Best Use method to determine alternative uses that are appropriate and technically and financially possible to determine the optimum value and the trip generation method to determine the potential traffic impacts that occur from the selected land use. The results of this research were obtained that the alternative effective use of land is a mall which will result in an increase in land value in the 7 year projection period of IDR 379,259,450,817 with an increase in roundabout delays of 35.23% and the chance of this condition occurring is 36.2%.\",\"PeriodicalId\":403309,\"journal\":{\"name\":\"Praxis : Jurnal Sains, Teknologi, Masyarakat dan Jejaring\",\"volume\":\"35 3\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2024-03-27\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Praxis : Jurnal Sains, Teknologi, Masyarakat dan Jejaring\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.24167/praxis.v6i1.11715\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Praxis : Jurnal Sains, Teknologi, Masyarakat dan Jejaring","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.24167/praxis.v6i1.11715","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

辛邦利马广场(Simpang Lima Plaza)是三宝垄市政府的资产,位于市中心,即三宝垄市艾哈迈德亚尼路(Jalan Ahmad Yani)。Simpang Lima 广场建于 1990 年,建筑面积为 38,935 平方米。Plaza Simpang Lima 由 PT Argamukti 管理,合同期为 30 年,将于 2024 年到期。当合同结束时,辛邦利马广场的楼龄将达到 30 年,因此需要对辛邦利马广场的潜在使用情况进行审查。以往的研究讨论了资产优化问题,但忽略了所选土地用途对交通潜力的影响。本研究旨在找出最有效的土地优化方案及其对交通的影响。在这项研究中,使用了 "最高和最佳利用 "方法进行分析,以确定在技术和经济上都可行的适当替代用途,从而确定最佳值,并使用 "行程生成 "方法确定所选土地用途对交通的潜在影响。研究结果表明,土地的有效替代用途是一座购物中心,在 7 年的预测期内,该购物中心的土地价值将增加 379,259,450,817 印尼盾,环岛延误时间将增加 35.23%,这种情况发生的几率为 36.2%。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Analisis HBU dan Peluang Kejenuhan Lalu Lintas pada Pengembangan Plasa Simpang Lima Semarang
Simpang Lima Plaza is a Semarang City Government asset which is located in the city center, precisely on Jalan Ahmad Yani, Semarang City. The Plaza Simpang Lima building was built in 1990 with a building area of 38,935 m2. Plaza Simpang Lima is managed by PT Argamukti with a 30 year contract system which will end in 2024. When the contract ends, the age of the Plaza Simpang Lima building will be 30 years, so the use of the Plaza Simpang Lima building needs to be reviewed in relation to its potential utilization. Previous research discussed asset optimization but ignored the impact on traffic potential of selected land uses. This research was conducted to find out the most effective land optimization and the resulting traffic impacts. In this research the analysis was carried out using the Highest and Best Use method to determine alternative uses that are appropriate and technically and financially possible to determine the optimum value and the trip generation method to determine the potential traffic impacts that occur from the selected land use. The results of this research were obtained that the alternative effective use of land is a mall which will result in an increase in land value in the 7 year projection period of IDR 379,259,450,817 with an increase in roundabout delays of 35.23% and the chance of this condition occurring is 36.2%.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Analisis HBU dan Peluang Kejenuhan Lalu Lintas pada Pengembangan Plasa Simpang Lima Semarang Perencanaan Pesan Komunikasi Vaksin Covid-19 Dalam Membentuk Sikap Publik Untuk Vaksinasi (Studi Kasus Komunikasi Vaksin Pemerintah D.I. Yogyakarta) Evaluasi Dampak Peningkatan Populasi Terhadap Ketersediaan Air Tanah pada Perumahan CitraGrand Kota Semarang Analisis Kualitas Produk Keripik Tempe dan Waffle Tiwul Selama Penyimpanan Analysis of Reinforced Concrete Durability Against Corrosion Due to Chloride Penetration
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1