将贝利桥重建为带斜拉桥 - 案例研究

Andrzej Ambroziak, Maciej Malinowski, Mirosław Wałęga
{"title":"将贝利桥重建为带斜拉桥 - 案例研究","authors":"Andrzej Ambroziak, Maciej Malinowski, Mirosław Wałęga","doi":"10.7250/bjrbe.2024-19.631","DOIUrl":null,"url":null,"abstract":"The structural analysis of a road foldable prefabricated steel Bailey- type bridge located over the Tuga River in Żelichowo, Poland is performed in this paper. Interesting and untypical bridge redevelopment performed made it possible to lift the middle foldable bridge span by approximately 4.0 m concerning the existing state. The paper begins with a survey of literature carried out on the investigations of foldable Bailey-type bridge subject matter. A description of the numerical modelling of foldable prefabricated bridges is performed. The comparison of the proof load test results with the FEM numerical model results has shown very good compatibility. This paper can provide scientists, engineers, and designers the basis for structural analysis in the field of foldable Bailey-type bridge constructions and numerical simulations.","PeriodicalId":506825,"journal":{"name":"The Baltic Journal of Road and Bridge Engineering","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2024-03-25","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Rebuilding Bailey Bridge to Bridge With Bascule Span – A Case Study\",\"authors\":\"Andrzej Ambroziak, Maciej Malinowski, Mirosław Wałęga\",\"doi\":\"10.7250/bjrbe.2024-19.631\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The structural analysis of a road foldable prefabricated steel Bailey- type bridge located over the Tuga River in Żelichowo, Poland is performed in this paper. Interesting and untypical bridge redevelopment performed made it possible to lift the middle foldable bridge span by approximately 4.0 m concerning the existing state. The paper begins with a survey of literature carried out on the investigations of foldable Bailey-type bridge subject matter. A description of the numerical modelling of foldable prefabricated bridges is performed. The comparison of the proof load test results with the FEM numerical model results has shown very good compatibility. This paper can provide scientists, engineers, and designers the basis for structural analysis in the field of foldable Bailey-type bridge constructions and numerical simulations.\",\"PeriodicalId\":506825,\"journal\":{\"name\":\"The Baltic Journal of Road and Bridge Engineering\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2024-03-25\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"The Baltic Journal of Road and Bridge Engineering\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.7250/bjrbe.2024-19.631\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"The Baltic Journal of Road and Bridge Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.7250/bjrbe.2024-19.631","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

本文对位于波兰Żelichowo 的 Tuga 河上的一座公路可折叠预制钢贝里式桥进行了结构分析。该桥进行了有趣的非典型重建,使中间的可折叠桥跨度在现有基础上提高了约 4.0 米。本文首先概述了有关可折叠贝雷桥研究的文献。对可折叠预制桥梁的数值建模进行了描述。验证荷载试验结果与有限元数值模型结果的对比显示两者具有很好的兼容性。本文可为科学家、工程师和设计师提供可折叠贝雷式桥梁结构分析和数值模拟的依据。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Rebuilding Bailey Bridge to Bridge With Bascule Span – A Case Study
The structural analysis of a road foldable prefabricated steel Bailey- type bridge located over the Tuga River in Żelichowo, Poland is performed in this paper. Interesting and untypical bridge redevelopment performed made it possible to lift the middle foldable bridge span by approximately 4.0 m concerning the existing state. The paper begins with a survey of literature carried out on the investigations of foldable Bailey-type bridge subject matter. A description of the numerical modelling of foldable prefabricated bridges is performed. The comparison of the proof load test results with the FEM numerical model results has shown very good compatibility. This paper can provide scientists, engineers, and designers the basis for structural analysis in the field of foldable Bailey-type bridge constructions and numerical simulations.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Investigation of the Stiffness of a Specially Strengthened Bridge When Crossed by Very Heavy Vehicles – A Case Study Rebuilding Bailey Bridge to Bridge With Bascule Span – A Case Study Identification of Road Black Spots Based on the Sliding Window Optimization and Safety Performance Function Development Effects of Transition Curves and Superelevation on the Critical States of Truck Rollovers on Sharp Curves Limit States of Shallow Bridge Foundations With Sheet Piling Covers
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1