对有再入流车间的工作量控制方法的研究

IF 1.4 Q4 ENGINEERING, INDUSTRIAL Management Systems in Production Engineering Pub Date : 2024-02-26 DOI:10.2478/mspe-2024-0014
Aruna Prabhu, K. Raghunandana, Pai P Yogesh, Augustine B.V. Barboza
{"title":"对有再入流车间的工作量控制方法的研究","authors":"Aruna Prabhu, K. Raghunandana, Pai P Yogesh, Augustine B.V. Barboza","doi":"10.2478/mspe-2024-0014","DOIUrl":null,"url":null,"abstract":"\n The re-entrant flow with an unpredictable nature of arrival would apparently harm production plans and schedules in flow type of shops. The re-entrant flow with varied arrival frequencies in rotor blade manufacturing is quite complicated and results in disproportionate workloads. Hence, an attempt has been made to study the significant influence of disproportionate workloads and research on an innovative order release method to enhance performance. The manufacturing process was observed thoroughly to incorporate the uncertain events that cause disturbance in the production. A simulation model was developed on a discrete event simulation platform by analysing problem phenomena right from the conceptualization phase. The model has been verified and validated to ensure the accuracy. The model was subjected to 288 experiments representing different scenarios that a flow shop undergoes in reality. The factors considered in the experimentation were re-entrant frequency, re-entrant proportions, order release methods and priority dispatching rules. A refined load release policy for disproportionate loads has been proposed to judge its effectiveness in terms of profit computation by comparing it with other relevant policies. Results of the experiment revealed that the order release methods contribute 95.93% to throughput performance, in addition, the use of the new re-entrant method policy in the above scenario was productive in improving the overall shop performance.","PeriodicalId":44097,"journal":{"name":"Management Systems in Production Engineering","volume":null,"pages":null},"PeriodicalIF":1.4000,"publicationDate":"2024-02-26","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Investigation of Workload Control Methods for Shops with Re-Entrant Flows\",\"authors\":\"Aruna Prabhu, K. Raghunandana, Pai P Yogesh, Augustine B.V. Barboza\",\"doi\":\"10.2478/mspe-2024-0014\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\\n The re-entrant flow with an unpredictable nature of arrival would apparently harm production plans and schedules in flow type of shops. The re-entrant flow with varied arrival frequencies in rotor blade manufacturing is quite complicated and results in disproportionate workloads. Hence, an attempt has been made to study the significant influence of disproportionate workloads and research on an innovative order release method to enhance performance. The manufacturing process was observed thoroughly to incorporate the uncertain events that cause disturbance in the production. A simulation model was developed on a discrete event simulation platform by analysing problem phenomena right from the conceptualization phase. The model has been verified and validated to ensure the accuracy. The model was subjected to 288 experiments representing different scenarios that a flow shop undergoes in reality. The factors considered in the experimentation were re-entrant frequency, re-entrant proportions, order release methods and priority dispatching rules. A refined load release policy for disproportionate loads has been proposed to judge its effectiveness in terms of profit computation by comparing it with other relevant policies. Results of the experiment revealed that the order release methods contribute 95.93% to throughput performance, in addition, the use of the new re-entrant method policy in the above scenario was productive in improving the overall shop performance.\",\"PeriodicalId\":44097,\"journal\":{\"name\":\"Management Systems in Production Engineering\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":1.4000,\"publicationDate\":\"2024-02-26\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Management Systems in Production Engineering\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.2478/mspe-2024-0014\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q4\",\"JCRName\":\"ENGINEERING, INDUSTRIAL\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Management Systems in Production Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2478/mspe-2024-0014","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"ENGINEERING, INDUSTRIAL","Score":null,"Total":0}
引用次数: 0

摘要

到达频率不可预测的再入流显然会损害流动型车间的生产计划和进度。在转子叶片制造中,具有不同到达频率的再入流相当复杂,会导致不成比例的工作量。因此,我们尝试研究工作量不成比例的重大影响,并研究一种创新的订单释放方法,以提高绩效。对生产流程进行了全面观察,以纳入对生产造成干扰的不确定事件。在离散事件仿真平台上开发了一个仿真模型,从概念化阶段就开始分析问题现象。为确保模型的准确性,对模型进行了验证和确认。该模型经过了 288 次实验,代表了流水车间在现实中经历的不同场景。实验中考虑的因素包括再进入频率、再进入比例、订单释放方法和优先调度规则。通过与其他相关策略的比较,提出了一种针对不成比例负载的改进负载释放策略,以判断其在利润计算方面的有效性。实验结果表明,订单释放方法对吞吐量性能的贡献率为 95.93%,此外,在上述场景中使用新的再进入方法策略在提高车间整体性能方面卓有成效。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Investigation of Workload Control Methods for Shops with Re-Entrant Flows
The re-entrant flow with an unpredictable nature of arrival would apparently harm production plans and schedules in flow type of shops. The re-entrant flow with varied arrival frequencies in rotor blade manufacturing is quite complicated and results in disproportionate workloads. Hence, an attempt has been made to study the significant influence of disproportionate workloads and research on an innovative order release method to enhance performance. The manufacturing process was observed thoroughly to incorporate the uncertain events that cause disturbance in the production. A simulation model was developed on a discrete event simulation platform by analysing problem phenomena right from the conceptualization phase. The model has been verified and validated to ensure the accuracy. The model was subjected to 288 experiments representing different scenarios that a flow shop undergoes in reality. The factors considered in the experimentation were re-entrant frequency, re-entrant proportions, order release methods and priority dispatching rules. A refined load release policy for disproportionate loads has been proposed to judge its effectiveness in terms of profit computation by comparing it with other relevant policies. Results of the experiment revealed that the order release methods contribute 95.93% to throughput performance, in addition, the use of the new re-entrant method policy in the above scenario was productive in improving the overall shop performance.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
CiteScore
4.30
自引率
13.30%
发文量
48
审稿时长
10 weeks
期刊最新文献
Analysis of the Possibility of Modeling Gas Separators using Computational Fluid Dynamics Process of Incubators in Morocco: Overview of the “Forsa” Program Research of Green Innovation of Companies of Countries with Different Levels of Technological Development of Production Work-Life Balance in SME Sector and Large Enterprises Bibliometric Analysis and Systematic Literature Review in Social Manufacturing
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1