阻尼孔作用下挡土桩结构的减振效果--案例研究

IF 2.1 Q2 ENGINEERING, CIVIL International Journal of Protective Structures Pub Date : 2024-04-15 DOI:10.1177/20414196241246285
Yingbo Ren, Nan Jiang, Chuan-bo Zhou, Yingkang Yao, Guopeng Lyu
{"title":"阻尼孔作用下挡土桩结构的减振效果--案例研究","authors":"Yingbo Ren, Nan Jiang, Chuan-bo Zhou, Yingkang Yao, Guopeng Lyu","doi":"10.1177/20414196241246285","DOIUrl":null,"url":null,"abstract":"In the context of mitigating the impact of blasting-induced seismic waves on excavation processes and reducing the vibrational load on retaining pile structures, this study examines the influence of predetermined damping hole parameters on the damping effect. It also evaluates the protective efficacy of damping holes on retaining pile structures. Leveraging the foundation pit project at the Julong Avenue Station of Wuhan Metro Line 7 as a reference, on-site blasting construction was monitored to obtain vibration velocities at the top of the retaining pile structure. A numerical calculation model for blasting in the foundation pit was established using LS-DYNA software, and its reliability was verified through the integration of on-site monitoring data at the top of the retaining pile. Multiple damping hole excavation schemes were devised, and their effects on the damping effectiveness were analyzed with respect to various parameters. Safety criteria for the stability of the retaining pile structure were proposed based on the ultimate tensile stress criterion, ultimate shear stress criterion, and Mohr’s criterion. Under the optimized scheme, the dynamic response characteristics of the retaining pile structure were analyzed, and the practical application effects on-site were observed. The research findings indicate that the depth, spacing, and number of damping holes have a significant impact on the damping effect. The safety criterion for the vibrational velocity of the retaining pile structure during blasting is determined to be 26.10 cm/s. Under the optimized scheme, the vibrational velocities at various monitoring points on the retaining pile structure all fall within the safe range, with a maximum reduction rate of 30.9%.","PeriodicalId":46272,"journal":{"name":"International Journal of Protective Structures","volume":null,"pages":null},"PeriodicalIF":2.1000,"publicationDate":"2024-04-15","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Vibration reduction effect of retaining pile structure under the action of damping hole—A case study\",\"authors\":\"Yingbo Ren, Nan Jiang, Chuan-bo Zhou, Yingkang Yao, Guopeng Lyu\",\"doi\":\"10.1177/20414196241246285\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"In the context of mitigating the impact of blasting-induced seismic waves on excavation processes and reducing the vibrational load on retaining pile structures, this study examines the influence of predetermined damping hole parameters on the damping effect. It also evaluates the protective efficacy of damping holes on retaining pile structures. Leveraging the foundation pit project at the Julong Avenue Station of Wuhan Metro Line 7 as a reference, on-site blasting construction was monitored to obtain vibration velocities at the top of the retaining pile structure. A numerical calculation model for blasting in the foundation pit was established using LS-DYNA software, and its reliability was verified through the integration of on-site monitoring data at the top of the retaining pile. Multiple damping hole excavation schemes were devised, and their effects on the damping effectiveness were analyzed with respect to various parameters. Safety criteria for the stability of the retaining pile structure were proposed based on the ultimate tensile stress criterion, ultimate shear stress criterion, and Mohr’s criterion. Under the optimized scheme, the dynamic response characteristics of the retaining pile structure were analyzed, and the practical application effects on-site were observed. The research findings indicate that the depth, spacing, and number of damping holes have a significant impact on the damping effect. The safety criterion for the vibrational velocity of the retaining pile structure during blasting is determined to be 26.10 cm/s. Under the optimized scheme, the vibrational velocities at various monitoring points on the retaining pile structure all fall within the safe range, with a maximum reduction rate of 30.9%.\",\"PeriodicalId\":46272,\"journal\":{\"name\":\"International Journal of Protective Structures\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":2.1000,\"publicationDate\":\"2024-04-15\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"International Journal of Protective Structures\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1177/20414196241246285\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q2\",\"JCRName\":\"ENGINEERING, CIVIL\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Journal of Protective Structures","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1177/20414196241246285","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q2","JCRName":"ENGINEERING, CIVIL","Score":null,"Total":0}
引用次数: 0

摘要

为了减轻爆破引起的地震波对开挖过程的影响,降低挡土桩结构的振动荷载,本研究探讨了预先确定的阻尼孔参数对阻尼效果的影响。研究还评估了阻尼孔对护桩结构的保护作用。以武汉地铁 7 号线巨龙大道站基坑工程为参考,对现场爆破施工进行监测,以获得护壁桩结构顶部的振动速度。利用 LS-DYNA 软件建立了基坑爆破数值计算模型,并通过整合护壁桩顶部的现场监测数据验证了模型的可靠性。设计了多种阻尼孔开挖方案,并分析了各种参数对阻尼效果的影响。根据极限拉应力准则、极限剪应力准则和莫尔准则,提出了护壁桩结构稳定性的安全准则。在优化方案下,分析了护壁桩结构的动态响应特性,并观察了现场实际应用效果。研究结果表明,阻尼孔的深度、间距和数量对阻尼效果有显著影响。确定爆破时护壁桩结构振动速度的安全标准为 26.10 cm/s。在优化方案下,护壁桩结构上各监测点的振动速度均在安全范围内,最大降低率为 30.9%。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Vibration reduction effect of retaining pile structure under the action of damping hole—A case study
In the context of mitigating the impact of blasting-induced seismic waves on excavation processes and reducing the vibrational load on retaining pile structures, this study examines the influence of predetermined damping hole parameters on the damping effect. It also evaluates the protective efficacy of damping holes on retaining pile structures. Leveraging the foundation pit project at the Julong Avenue Station of Wuhan Metro Line 7 as a reference, on-site blasting construction was monitored to obtain vibration velocities at the top of the retaining pile structure. A numerical calculation model for blasting in the foundation pit was established using LS-DYNA software, and its reliability was verified through the integration of on-site monitoring data at the top of the retaining pile. Multiple damping hole excavation schemes were devised, and their effects on the damping effectiveness were analyzed with respect to various parameters. Safety criteria for the stability of the retaining pile structure were proposed based on the ultimate tensile stress criterion, ultimate shear stress criterion, and Mohr’s criterion. Under the optimized scheme, the dynamic response characteristics of the retaining pile structure were analyzed, and the practical application effects on-site were observed. The research findings indicate that the depth, spacing, and number of damping holes have a significant impact on the damping effect. The safety criterion for the vibrational velocity of the retaining pile structure during blasting is determined to be 26.10 cm/s. Under the optimized scheme, the vibrational velocities at various monitoring points on the retaining pile structure all fall within the safe range, with a maximum reduction rate of 30.9%.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
CiteScore
4.30
自引率
25.00%
发文量
48
期刊最新文献
Investigating the significance of non-ideal effects in large-scale blast propagation A high explosive blast simulator Pounding response of concrete rods with rough impacting surfaces Airblast observations and near-field modeling of the large surface explosion coupling experiment Development of a fast-running method for prediction of blast propagation in partially confined spaces
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1