{"title":"因果关系石川图在工业企业成本管理中的应用","authors":"С. О. Пасічник, Т. О. Меліхова","doi":"10.32702/2306-6814.2024.7.66","DOIUrl":null,"url":null,"abstract":"of the cost management process and, using the example of the Ishikawa diagram, clearly shows the relationship between the causes and consequences of existing problems. The authors proved that in order to solve the problem as soon as possible, it is necessary to find the shortest path with the least number of steps for its solution and with a more effective impact on the final result","PeriodicalId":518502,"journal":{"name":"Журнал \"Інвестиції: практика та досвід\" ","volume":"27 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2024-04-04","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"ЗАСТОСУВАННЯ ПРИЧИННО- НАСЛІДКОВОЇ ДІАГРАМИ ІСІКАВИ В УПРАВЛІННІ ВИТРАТАМИ ПРОМИСЛОВИХ ПІДПРИЄМСТВ\",\"authors\":\"С. О. Пасічник, Т. О. Меліхова\",\"doi\":\"10.32702/2306-6814.2024.7.66\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"of the cost management process and, using the example of the Ishikawa diagram, clearly shows the relationship between the causes and consequences of existing problems. The authors proved that in order to solve the problem as soon as possible, it is necessary to find the shortest path with the least number of steps for its solution and with a more effective impact on the final result\",\"PeriodicalId\":518502,\"journal\":{\"name\":\"Журнал \\\"Інвестиції: практика та досвід\\\" \",\"volume\":\"27 1\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2024-04-04\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Журнал \\\"Інвестиції: практика та досвід\\\" \",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.32702/2306-6814.2024.7.66\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Журнал \"Інвестиції: практика та досвід\" ","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.32702/2306-6814.2024.7.66","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
ЗАСТОСУВАННЯ ПРИЧИННО- НАСЛІДКОВОЇ ДІАГРАМИ ІСІКАВИ В УПРАВЛІННІ ВИТРАТАМИ ПРОМИСЛОВИХ ПІДПРИЄМСТВ
of the cost management process and, using the example of the Ishikawa diagram, clearly shows the relationship between the causes and consequences of existing problems. The authors proved that in order to solve the problem as soon as possible, it is necessary to find the shortest path with the least number of steps for its solution and with a more effective impact on the final result