增强抗灾能力:了解洪水灾害和脆弱性对业务中断和损失的影响

IF 4.6 Q2 MATERIALS SCIENCE, BIOMATERIALS ACS Applied Bio Materials Pub Date : 2024-04-01 DOI:10.1016/j.wre.2024.100244
Thijs Endendijk , W.J. Wouter Botzen , Hans de Moel , Kymo Slager , Matthijs Kok , Jeroen C.J.H. Aerts
{"title":"增强抗灾能力:了解洪水灾害和脆弱性对业务中断和损失的影响","authors":"Thijs Endendijk ,&nbsp;W.J. Wouter Botzen ,&nbsp;Hans de Moel ,&nbsp;Kymo Slager ,&nbsp;Matthijs Kok ,&nbsp;Jeroen C.J.H. Aerts","doi":"10.1016/j.wre.2024.100244","DOIUrl":null,"url":null,"abstract":"<div><p>Without taking additional measures, flooding is becoming more likely and intense in a changing climate, which causes large economic damage. Households and firms are directly impacted by physical flood damage, but further ripple effects on society occur through business disruptions. By using post-disaster survey data from the 2021 flood event in the Netherlands, this study adds to the literature on business interruption duration and losses after flooding. The current empirical literature on flood impacts on firms is often unable to distinguish separate effects for flooded and non-flooded firms and does not incorporate flood severity and the influence of risk reduction measures. Here, we use multivariate regression models to determine depth-duration functions that describe the relationship between flood hazard characteristics and business interruption duration. This relationship can be used to calibrate flood damage models that capture indirect firm impacts. The prediction of business interruption after flooding allows for differentiation in business interruption between firms within a flooded area, reducing the reliance of these macroeconomic models on restrictive assumptions. Our results indicate that a day of business interruption duration costs a firm on average 0.5 % of their annual revenue; an effect that is stronger for firms with a weaker connection to their region. Flood damage mitigation (FDM) measures taken at the building level do not significantly affect business interruption duration, although further research on this is required. Finally, quick damage compensation is found to reduce business interruption duration and thus revenue losses, calling for higher insurance uptake and rapid and streamlined post-disaster insurance and government compensation.</p></div>","PeriodicalId":2,"journal":{"name":"ACS Applied Bio Materials","volume":null,"pages":null},"PeriodicalIF":4.6000,"publicationDate":"2024-04-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://www.sciencedirect.com/science/article/pii/S2212428424000082/pdfft?md5=b11f6fa92a3792b158c6dd6ca61c1fec&pid=1-s2.0-S2212428424000082-main.pdf","citationCount":"0","resultStr":"{\"title\":\"Enhancing resilience: Understanding the impact of flood hazard and vulnerability on business interruption and losses\",\"authors\":\"Thijs Endendijk ,&nbsp;W.J. Wouter Botzen ,&nbsp;Hans de Moel ,&nbsp;Kymo Slager ,&nbsp;Matthijs Kok ,&nbsp;Jeroen C.J.H. Aerts\",\"doi\":\"10.1016/j.wre.2024.100244\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"<div><p>Without taking additional measures, flooding is becoming more likely and intense in a changing climate, which causes large economic damage. Households and firms are directly impacted by physical flood damage, but further ripple effects on society occur through business disruptions. By using post-disaster survey data from the 2021 flood event in the Netherlands, this study adds to the literature on business interruption duration and losses after flooding. The current empirical literature on flood impacts on firms is often unable to distinguish separate effects for flooded and non-flooded firms and does not incorporate flood severity and the influence of risk reduction measures. Here, we use multivariate regression models to determine depth-duration functions that describe the relationship between flood hazard characteristics and business interruption duration. This relationship can be used to calibrate flood damage models that capture indirect firm impacts. The prediction of business interruption after flooding allows for differentiation in business interruption between firms within a flooded area, reducing the reliance of these macroeconomic models on restrictive assumptions. Our results indicate that a day of business interruption duration costs a firm on average 0.5 % of their annual revenue; an effect that is stronger for firms with a weaker connection to their region. Flood damage mitigation (FDM) measures taken at the building level do not significantly affect business interruption duration, although further research on this is required. Finally, quick damage compensation is found to reduce business interruption duration and thus revenue losses, calling for higher insurance uptake and rapid and streamlined post-disaster insurance and government compensation.</p></div>\",\"PeriodicalId\":2,\"journal\":{\"name\":\"ACS Applied Bio Materials\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":4.6000,\"publicationDate\":\"2024-04-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"https://www.sciencedirect.com/science/article/pii/S2212428424000082/pdfft?md5=b11f6fa92a3792b158c6dd6ca61c1fec&pid=1-s2.0-S2212428424000082-main.pdf\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"ACS Applied Bio Materials\",\"FirstCategoryId\":\"93\",\"ListUrlMain\":\"https://www.sciencedirect.com/science/article/pii/S2212428424000082\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q2\",\"JCRName\":\"MATERIALS SCIENCE, BIOMATERIALS\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"ACS Applied Bio Materials","FirstCategoryId":"93","ListUrlMain":"https://www.sciencedirect.com/science/article/pii/S2212428424000082","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q2","JCRName":"MATERIALS SCIENCE, BIOMATERIALS","Score":null,"Total":0}
引用次数: 0

摘要

如果不采取更多措施,在气候不断变化的情况下,洪水发生的可能性和强度都会增加,从而造成巨大的经济损失。家庭和企业直接受到洪水造成的物质损失的影响,但通过业务中断对社会产生进一步的连锁反应。通过使用荷兰 2021 年洪水事件的灾后调查数据,本研究为有关洪水后业务中断持续时间和损失的文献增添了新的内容。目前有关洪灾对企业影响的实证文献往往无法区分洪灾和非洪灾对企业的不同影响,也没有纳入洪灾严重程度和降低风险措施的影响。在此,我们使用多元回归模型来确定描述洪水灾害特征与业务中断持续时间之间关系的深度-持续时间函数。这种关系可用于校准洪水损害模型,以捕捉企业的间接影响。通过预测洪灾后的业务中断情况,可以区分洪灾区域内不同企业的业务中断情况,从而减少这些宏观经济模型对限制性假设的依赖。我们的研究结果表明,一天的业务中断时间平均会使企业损失 0.5% 的年收入;对于与所在区域联系较弱的企业来说,这种影响更大。在建筑物层面采取的洪灾损失缓解(FDM)措施对业务中断持续时间的影响不大,但仍需进一步研究。最后,研究发现快速的损失赔偿可缩短业务中断时间,从而减少收入损失,这就要求提高保险覆盖率,快速简化灾后保险和政府赔偿。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Enhancing resilience: Understanding the impact of flood hazard and vulnerability on business interruption and losses

Without taking additional measures, flooding is becoming more likely and intense in a changing climate, which causes large economic damage. Households and firms are directly impacted by physical flood damage, but further ripple effects on society occur through business disruptions. By using post-disaster survey data from the 2021 flood event in the Netherlands, this study adds to the literature on business interruption duration and losses after flooding. The current empirical literature on flood impacts on firms is often unable to distinguish separate effects for flooded and non-flooded firms and does not incorporate flood severity and the influence of risk reduction measures. Here, we use multivariate regression models to determine depth-duration functions that describe the relationship between flood hazard characteristics and business interruption duration. This relationship can be used to calibrate flood damage models that capture indirect firm impacts. The prediction of business interruption after flooding allows for differentiation in business interruption between firms within a flooded area, reducing the reliance of these macroeconomic models on restrictive assumptions. Our results indicate that a day of business interruption duration costs a firm on average 0.5 % of their annual revenue; an effect that is stronger for firms with a weaker connection to their region. Flood damage mitigation (FDM) measures taken at the building level do not significantly affect business interruption duration, although further research on this is required. Finally, quick damage compensation is found to reduce business interruption duration and thus revenue losses, calling for higher insurance uptake and rapid and streamlined post-disaster insurance and government compensation.

求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
ACS Applied Bio Materials
ACS Applied Bio Materials Chemistry-Chemistry (all)
CiteScore
9.40
自引率
2.10%
发文量
464
期刊最新文献
A Systematic Review of Sleep Disturbance in Idiopathic Intracranial Hypertension. Advancing Patient Education in Idiopathic Intracranial Hypertension: The Promise of Large Language Models. Anti-Myelin-Associated Glycoprotein Neuropathy: Recent Developments. Approach to Managing the Initial Presentation of Multiple Sclerosis: A Worldwide Practice Survey. Association Between LACE+ Index Risk Category and 90-Day Mortality After Stroke.
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1