基于综合搜索机制的工作车间调度问题混合算法

Lin Huang;Shikui Zhao;Yingjie Xiong
{"title":"基于综合搜索机制的工作车间调度问题混合算法","authors":"Lin Huang;Shikui Zhao;Yingjie Xiong","doi":"10.23919/CSMS.2024.0001","DOIUrl":null,"url":null,"abstract":"The research on complex workshop scheduling methods has important academic significance and has wide applications in industrial manufacturing. Aiming at the job shop scheduling problem, a hybrid algorithm based on comprehensive search mechanisms (HACSM) is proposed to optimize the maximum completion time. HACSM combines three search methods with different optimization scales, including fireworks algorithm (FW), extended Akers graphical method (LS1+_AKERS_EXT), and tabu search algorithm (TS). FW realizes global search through information interaction and resource allocation, ensuring the diversity of the population. LS1+_AKERS_EXT realizes compound movement with Akers graphical method, so it has advanced global and local search capabilities. In LS1+_AKERS_EXT, the shortest path is the core of the algorithm, which directly affects the encoding and decoding of scheduling. In order to find the shortest path, an effective node expansion method is designed to improve the node expansion efficiency. In the part of centralized search, TS based on the neighborhood structure is used. Finally, the effectiveness and superiority of HACSM are verified by testing the relevant instances in the literature.","PeriodicalId":65786,"journal":{"name":"复杂系统建模与仿真(英文)","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2024-03-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://ieeexplore.ieee.org/stamp/stamp.jsp?tp=&arnumber=10525670","citationCount":"0","resultStr":"{\"title\":\"A Hybrid Algorithm Based on Comprehensive Search Mechanisms for Job Shop Scheduling Problem\",\"authors\":\"Lin Huang;Shikui Zhao;Yingjie Xiong\",\"doi\":\"10.23919/CSMS.2024.0001\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The research on complex workshop scheduling methods has important academic significance and has wide applications in industrial manufacturing. Aiming at the job shop scheduling problem, a hybrid algorithm based on comprehensive search mechanisms (HACSM) is proposed to optimize the maximum completion time. HACSM combines three search methods with different optimization scales, including fireworks algorithm (FW), extended Akers graphical method (LS1+_AKERS_EXT), and tabu search algorithm (TS). FW realizes global search through information interaction and resource allocation, ensuring the diversity of the population. LS1+_AKERS_EXT realizes compound movement with Akers graphical method, so it has advanced global and local search capabilities. In LS1+_AKERS_EXT, the shortest path is the core of the algorithm, which directly affects the encoding and decoding of scheduling. In order to find the shortest path, an effective node expansion method is designed to improve the node expansion efficiency. In the part of centralized search, TS based on the neighborhood structure is used. Finally, the effectiveness and superiority of HACSM are verified by testing the relevant instances in the literature.\",\"PeriodicalId\":65786,\"journal\":{\"name\":\"复杂系统建模与仿真(英文)\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2024-03-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"https://ieeexplore.ieee.org/stamp/stamp.jsp?tp=&arnumber=10525670\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"复杂系统建模与仿真(英文)\",\"FirstCategoryId\":\"1089\",\"ListUrlMain\":\"https://ieeexplore.ieee.org/document/10525670/\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"复杂系统建模与仿真(英文)","FirstCategoryId":"1089","ListUrlMain":"https://ieeexplore.ieee.org/document/10525670/","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

复杂车间调度方法的研究具有重要的学术意义,并在工业制造领域有着广泛的应用。针对作业车间调度问题,提出了一种基于综合搜索机制的混合算法(HACSM)来优化最大完成时间。HACSM 结合了三种不同优化尺度的搜索方法,包括烟花算法(FW)、扩展 Akers 图形方法(LS1+_AKERS_EXT)和塔布搜索算法(TS)。FW 通过信息交互和资源分配实现全局搜索,确保种群的多样性。LS1+_AKERS_EXT 利用 Akers 图形方法实现了复合运动,因此具有先进的全局和局部搜索能力。在 LS1+_AKERS_EXT 中,最短路径是算法的核心,直接影响调度的编码和解码。为了找到最短路径,设计了一种有效的节点扩展方法,以提高节点扩展效率。在集中搜索部分,采用了基于邻域结构的 TS。最后,通过测试文献中的相关实例,验证了 HACSM 的有效性和优越性。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
A Hybrid Algorithm Based on Comprehensive Search Mechanisms for Job Shop Scheduling Problem
The research on complex workshop scheduling methods has important academic significance and has wide applications in industrial manufacturing. Aiming at the job shop scheduling problem, a hybrid algorithm based on comprehensive search mechanisms (HACSM) is proposed to optimize the maximum completion time. HACSM combines three search methods with different optimization scales, including fireworks algorithm (FW), extended Akers graphical method (LS1+_AKERS_EXT), and tabu search algorithm (TS). FW realizes global search through information interaction and resource allocation, ensuring the diversity of the population. LS1+_AKERS_EXT realizes compound movement with Akers graphical method, so it has advanced global and local search capabilities. In LS1+_AKERS_EXT, the shortest path is the core of the algorithm, which directly affects the encoding and decoding of scheduling. In order to find the shortest path, an effective node expansion method is designed to improve the node expansion efficiency. In the part of centralized search, TS based on the neighborhood structure is used. Finally, the effectiveness and superiority of HACSM are verified by testing the relevant instances in the literature.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
CiteScore
7.80
自引率
0.00%
发文量
0
期刊最新文献
Front Cover Contents Research on Digital Twin System Platform Framework and Key Technologies of Unmanned Ground Equipment Hierarchical Disturbance Propagation Mechanism and Improved Contract Net Protocol for Satellite TT&C Resource Dynamic Scheduling Modeling and Analysis of Risk Propagation and Loss Causing Capacity for Key Nodes in Cyber-Physical Coupled Power Network
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1