地质变量建模中参数不确定性的重要性

IF 4.8 2区 地球科学 Q1 GEOSCIENCES, MULTIDISCIPLINARY Natural Resources Research Pub Date : 2024-05-28 DOI:10.1007/s11053-024-10363-z
Oktay Erten, Clayton V. Deutsch
{"title":"地质变量建模中参数不确定性的重要性","authors":"Oktay Erten, Clayton V. Deutsch","doi":"10.1007/s11053-024-10363-z","DOIUrl":null,"url":null,"abstract":"<p>Quantitative modeling of geological heterogeneity is critical for resource management and decision-making. However, in the early stages of a mining project, the only data available for modeling the spatial variability of the variables are from a limited number of exploration drill holes. This means that the empirical cumulative distribution function of the data, which is one of the key inputs for the geostatistical simulation, is uncertain, and ignoring this uncertainty may lead to biased resource risk assessments. The parameter uncertainty can be quantified by the multivariate spatial bootstrap procedure and propagated through geostatistical simulation workflows. This methodology is demonstrated in a case study using the data from the former lead and zinc mine at Lisheen, Ireland. The joint modeling of the lead and zinc grades is carried out by using (1) all of the available data, (2) a representative subset (approximately 10% of the available data) without parameter uncertainty, and (3) the same subset with parameter uncertainty. In all cases, the turning bands simulation approach generates realizations of lead and zinc grades. In the third case, the uncertainty in the lead and zinc grade distributions is first quantified (i.e., prior uncertainty) by the correlated bootstrap realizations. This joint prior uncertainty is then updated in simulation by the conditioning data and domain limits, which results in posterior uncertainty. The results indicate that a more realistic resource risk assessment can be achieved when parameter uncertainty is considered.</p>","PeriodicalId":54284,"journal":{"name":"Natural Resources Research","volume":"25 1","pages":""},"PeriodicalIF":4.8000,"publicationDate":"2024-05-28","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Importance of Parameter Uncertainty in the Modeling of Geological Variables\",\"authors\":\"Oktay Erten, Clayton V. Deutsch\",\"doi\":\"10.1007/s11053-024-10363-z\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"<p>Quantitative modeling of geological heterogeneity is critical for resource management and decision-making. However, in the early stages of a mining project, the only data available for modeling the spatial variability of the variables are from a limited number of exploration drill holes. This means that the empirical cumulative distribution function of the data, which is one of the key inputs for the geostatistical simulation, is uncertain, and ignoring this uncertainty may lead to biased resource risk assessments. The parameter uncertainty can be quantified by the multivariate spatial bootstrap procedure and propagated through geostatistical simulation workflows. This methodology is demonstrated in a case study using the data from the former lead and zinc mine at Lisheen, Ireland. The joint modeling of the lead and zinc grades is carried out by using (1) all of the available data, (2) a representative subset (approximately 10% of the available data) without parameter uncertainty, and (3) the same subset with parameter uncertainty. In all cases, the turning bands simulation approach generates realizations of lead and zinc grades. In the third case, the uncertainty in the lead and zinc grade distributions is first quantified (i.e., prior uncertainty) by the correlated bootstrap realizations. This joint prior uncertainty is then updated in simulation by the conditioning data and domain limits, which results in posterior uncertainty. The results indicate that a more realistic resource risk assessment can be achieved when parameter uncertainty is considered.</p>\",\"PeriodicalId\":54284,\"journal\":{\"name\":\"Natural Resources Research\",\"volume\":\"25 1\",\"pages\":\"\"},\"PeriodicalIF\":4.8000,\"publicationDate\":\"2024-05-28\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Natural Resources Research\",\"FirstCategoryId\":\"89\",\"ListUrlMain\":\"https://doi.org/10.1007/s11053-024-10363-z\",\"RegionNum\":2,\"RegionCategory\":\"地球科学\",\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q1\",\"JCRName\":\"GEOSCIENCES, MULTIDISCIPLINARY\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Natural Resources Research","FirstCategoryId":"89","ListUrlMain":"https://doi.org/10.1007/s11053-024-10363-z","RegionNum":2,"RegionCategory":"地球科学","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q1","JCRName":"GEOSCIENCES, MULTIDISCIPLINARY","Score":null,"Total":0}
引用次数: 0

摘要

地质异质性的定量建模对于资源管理和决策至关重要。然而,在采矿项目的早期阶段,唯一可用于变量空间变异性建模的数据来自数量有限的勘探钻孔。这意味着作为地质统计模拟关键输入之一的数据经验累积分布函数是不确定的,而忽略这种不确定性可能会导致资源风险评估出现偏差。参数的不确定性可以通过多元空间自举程序进行量化,并通过地质统计模拟工作流程进行传播。爱尔兰利辛前铅锌矿的数据在案例研究中演示了这一方法。铅锌品位的联合建模是通过以下方式进行的:(1) 使用所有可用数据;(2) 使用不带参数不确定性的代表性子集(约占可用数据的 10%);(3) 使用带参数不确定性的相同子集。在所有情况下,转折带模拟方法都会产生铅锌品位的现实值。在第三种情况下,铅锌品位分布的不确定性首先由相关的 Bootstrap 真实值量化(即先验不确定性)。然后,在模拟中通过条件数据和域限制更新联合先验不确定性,从而得出后验不确定性。结果表明,在考虑参数不确定性的情况下,可以实现更真实的资源风险评估。
本文章由计算机程序翻译,如有差异,请以英文原文为准。

摘要图片

查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Importance of Parameter Uncertainty in the Modeling of Geological Variables

Quantitative modeling of geological heterogeneity is critical for resource management and decision-making. However, in the early stages of a mining project, the only data available for modeling the spatial variability of the variables are from a limited number of exploration drill holes. This means that the empirical cumulative distribution function of the data, which is one of the key inputs for the geostatistical simulation, is uncertain, and ignoring this uncertainty may lead to biased resource risk assessments. The parameter uncertainty can be quantified by the multivariate spatial bootstrap procedure and propagated through geostatistical simulation workflows. This methodology is demonstrated in a case study using the data from the former lead and zinc mine at Lisheen, Ireland. The joint modeling of the lead and zinc grades is carried out by using (1) all of the available data, (2) a representative subset (approximately 10% of the available data) without parameter uncertainty, and (3) the same subset with parameter uncertainty. In all cases, the turning bands simulation approach generates realizations of lead and zinc grades. In the third case, the uncertainty in the lead and zinc grade distributions is first quantified (i.e., prior uncertainty) by the correlated bootstrap realizations. This joint prior uncertainty is then updated in simulation by the conditioning data and domain limits, which results in posterior uncertainty. The results indicate that a more realistic resource risk assessment can be achieved when parameter uncertainty is considered.

求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
Natural Resources Research
Natural Resources Research Environmental Science-General Environmental Science
CiteScore
11.90
自引率
11.10%
发文量
151
期刊介绍: This journal publishes quantitative studies of natural (mainly but not limited to mineral) resources exploration, evaluation and exploitation, including environmental and risk-related aspects. Typical articles use geoscientific data or analyses to assess, test, or compare resource-related aspects. NRR covers a wide variety of resources including minerals, coal, hydrocarbon, geothermal, water, and vegetation. Case studies are welcome.
期刊最新文献
Petrophysical Characteristics of the Paleocene Zelten Formation in the Gialo Oil Field, Sirte Basin, Libya Research on Coal Reservoir Pore Structures: Progress, Current Status, and Advancing Lateritic Ni–Co Prospectivity Modeling in Eastern Australia Using an Enhanced Generative Adversarial Network and Positive-Unlabeled Bagging Risk-Based Optimization of Post-Blast Dig-Limits Incorporating Blast Movement and Grade Uncertainties with Multiple Destinations in Open-Pit Mines Correlation Between and Mechanisms of Gas Desorption and Infrasound Signals
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1