经验教训:快速项目的影响

Yaamini Devi L, Sachin Simant, Rohit Thakur
{"title":"经验教训:快速项目的影响","authors":"Yaamini Devi L, Sachin Simant, Rohit Thakur","doi":"10.37285/ajmt.4.2.3","DOIUrl":null,"url":null,"abstract":"Program management and execution are key skills required in any organization. Project management practices, principles, people, processes, tools and techniques play a key role in the successful execution of projects. This paper will focus on the lessons learnt in the Power Generator set programs executed to meet the recent emission change levels. The programs started late, but had to meet the launch timeline for the emission change and also had to be made available in the market at the right time. The program was launched in the market at the right time, overcoming the challenge of meeting the short timelines, with added complexities on manufacturing location change and other scope of work. This paper tries to bring out the ramifications of running the program at a high pace. This paper will focus on the key challenges faced during the program and how the team effectively mitigated the challenges. This will give food for thought for future programs to meet any short project timelines requirement and meeting quality requirements. Though the team tried to compress activities and timelines, product reliability and the work content needed to meet reliability requirements were never compromised.\nKeywords: Program management, Expeditious Project, Emission compliant product, information technology, Conflict Management, Change Management","PeriodicalId":504792,"journal":{"name":"ARAI Journal of Mobility Technology","volume":"42 s195","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2024-06-06","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Lessons Learnt: Ramifications in an Expeditious Project\",\"authors\":\"Yaamini Devi L, Sachin Simant, Rohit Thakur\",\"doi\":\"10.37285/ajmt.4.2.3\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Program management and execution are key skills required in any organization. Project management practices, principles, people, processes, tools and techniques play a key role in the successful execution of projects. This paper will focus on the lessons learnt in the Power Generator set programs executed to meet the recent emission change levels. The programs started late, but had to meet the launch timeline for the emission change and also had to be made available in the market at the right time. The program was launched in the market at the right time, overcoming the challenge of meeting the short timelines, with added complexities on manufacturing location change and other scope of work. This paper tries to bring out the ramifications of running the program at a high pace. This paper will focus on the key challenges faced during the program and how the team effectively mitigated the challenges. This will give food for thought for future programs to meet any short project timelines requirement and meeting quality requirements. Though the team tried to compress activities and timelines, product reliability and the work content needed to meet reliability requirements were never compromised.\\nKeywords: Program management, Expeditious Project, Emission compliant product, information technology, Conflict Management, Change Management\",\"PeriodicalId\":504792,\"journal\":{\"name\":\"ARAI Journal of Mobility Technology\",\"volume\":\"42 s195\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2024-06-06\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"ARAI Journal of Mobility Technology\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.37285/ajmt.4.2.3\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"ARAI Journal of Mobility Technology","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.37285/ajmt.4.2.3","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

计划管理和执行是任何组织都需要的关键技能。项目管理实践、原则、人员、流程、工具和技术在项目的成功执行中发挥着关键作用。本文将重点介绍为满足近期排放变化水平而执行的发电机组项目的经验教训。这些项目起步较晚,但必须满足排放变化的启动时间表,还必须在适当的时候投放市场。该计划在正确的时间投放市场,克服了时间紧迫的挑战,同时还增加了生产地点变更和其他工作范围的复杂性。本文试图揭示高速运行该计划所带来的影响。本文将重点介绍项目过程中面临的主要挑战,以及团队如何有效地应对这些挑战。这将为今后的项目提供参考,以满足任何较短的项目时限要求和质量要求。尽管项目组努力压缩活动和时间,但产品可靠性和满足可靠性要求所需的工作内容从未受到影响:项目管理、快速项目、符合排放标准的产品、信息技术、冲突管理、变更管理
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Lessons Learnt: Ramifications in an Expeditious Project
Program management and execution are key skills required in any organization. Project management practices, principles, people, processes, tools and techniques play a key role in the successful execution of projects. This paper will focus on the lessons learnt in the Power Generator set programs executed to meet the recent emission change levels. The programs started late, but had to meet the launch timeline for the emission change and also had to be made available in the market at the right time. The program was launched in the market at the right time, overcoming the challenge of meeting the short timelines, with added complexities on manufacturing location change and other scope of work. This paper tries to bring out the ramifications of running the program at a high pace. This paper will focus on the key challenges faced during the program and how the team effectively mitigated the challenges. This will give food for thought for future programs to meet any short project timelines requirement and meeting quality requirements. Though the team tried to compress activities and timelines, product reliability and the work content needed to meet reliability requirements were never compromised. Keywords: Program management, Expeditious Project, Emission compliant product, information technology, Conflict Management, Change Management
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Dynamic Analysis on a Sub-Scaled Physical Model of a 4-Ton Truck Composite Ladder Type Cassis Sizing of an Electric Powertrain based on Urban Traffic Parameters and Hybridizing of a Two-Wheeler Synthesis and Experimental Characterization of the Potting Material to Reduce the Radio Frequency Signal Attenuation Lessons Learnt: Ramifications in an Expeditious Project Solar Powered Proton Exchange Membrane Electrolyser for Hydrogen Production
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1