{"title":"海拔 5000 米及以下地区的特高压变电站间距","authors":"Xiuyuan Yao, Yu Su, Songsong Zhou, Yujian Ding, Yifan Lin, Ling Jiang, Shijun Xie","doi":"10.1088/1742-6596/2797/1/012015","DOIUrl":null,"url":null,"abstract":"\n In view of the increasing energy consumption and power demand, the construction of UHV AC is growing rapidly, and the construction of the project is gradually advancing to higher altitudes. It is urgent to conduct research on typical gap discharge in substations at high altitudes. Combined with the engineering requirements, this paper corrects the test data at an altitude of 0 m according to GB/T 24842 standard through altitude correction and combines the discharge voltage requirements of various typical gaps in substations to obtain the minimum air gap distance in UHV substations at an altitude of 5000 m and below. The calculation results of the two altitude correction methods are compared and analyzed, and the applicability of the two methods is analyzed.","PeriodicalId":506941,"journal":{"name":"Journal of Physics: Conference Series","volume":"10 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2024-07-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Gap distance of UHV substation in areas with an altitude of 5000 m and below\",\"authors\":\"Xiuyuan Yao, Yu Su, Songsong Zhou, Yujian Ding, Yifan Lin, Ling Jiang, Shijun Xie\",\"doi\":\"10.1088/1742-6596/2797/1/012015\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\\n In view of the increasing energy consumption and power demand, the construction of UHV AC is growing rapidly, and the construction of the project is gradually advancing to higher altitudes. It is urgent to conduct research on typical gap discharge in substations at high altitudes. Combined with the engineering requirements, this paper corrects the test data at an altitude of 0 m according to GB/T 24842 standard through altitude correction and combines the discharge voltage requirements of various typical gaps in substations to obtain the minimum air gap distance in UHV substations at an altitude of 5000 m and below. The calculation results of the two altitude correction methods are compared and analyzed, and the applicability of the two methods is analyzed.\",\"PeriodicalId\":506941,\"journal\":{\"name\":\"Journal of Physics: Conference Series\",\"volume\":\"10 1\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2024-07-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Journal of Physics: Conference Series\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1088/1742-6596/2797/1/012015\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Physics: Conference Series","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1088/1742-6596/2797/1/012015","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

鉴于能源消耗和电力需求的不断增长,特高压交流建设发展迅速,工程建设逐步向高海拔地区推进。开展高海拔地区变电站典型间隙放电研究迫在眉睫。结合工程要求,本文根据 GB/T 24842 标准,通过海拔高度修正,对海拔 0 m 的试验数据进行修正,并结合变电站各种典型间隙的放电电压要求,得出海拔 5000 m 及以下特高压变电站的最小空气间隙距离。对比分析了两种海拔修正方法的计算结果,分析了两种方法的适用性。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Gap distance of UHV substation in areas with an altitude of 5000 m and below
In view of the increasing energy consumption and power demand, the construction of UHV AC is growing rapidly, and the construction of the project is gradually advancing to higher altitudes. It is urgent to conduct research on typical gap discharge in substations at high altitudes. Combined with the engineering requirements, this paper corrects the test data at an altitude of 0 m according to GB/T 24842 standard through altitude correction and combines the discharge voltage requirements of various typical gaps in substations to obtain the minimum air gap distance in UHV substations at an altitude of 5000 m and below. The calculation results of the two altitude correction methods are compared and analyzed, and the applicability of the two methods is analyzed.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
LPI radar waveform recognition model based on multiple feature image and quasi-residual attention module About the 3D virtualization of the Millikan oil drop experiment Study on the characteristics of the bypass flow field of the net structure under different Reynolds number conditions Exploring the Universe through Gamma-Ray Astronomy: Characterization and Performance of the LST-1 Telescope Analysis of structural dynamic response of vertical sound barriers under natural wind and vehicle induced pulsating wind effects
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1