在项目管理实践中实施 BIM,促进可持续发展:局部最小平方法

IF 6 2区 工程技术 Q1 ENGINEERING, MULTIDISCIPLINARY Ain Shams Engineering Journal Pub Date : 2024-09-07 DOI:10.1016/j.asej.2024.103048
Muhammad Sajjad, Anfeng Hu, Dorin RADU, Ahsan Waqar, Hamad R. Almujibah, Abdul Mateen
{"title":"在项目管理实践中实施 BIM,促进可持续发展:局部最小平方法","authors":"Muhammad Sajjad, Anfeng Hu, Dorin RADU, Ahsan Waqar, Hamad R. Almujibah, Abdul Mateen","doi":"10.1016/j.asej.2024.103048","DOIUrl":null,"url":null,"abstract":"As an emerging area with far-reaching implications for project management practices, Despite the growing global adoption of Building Information Modelling (BIM), its implementation in the Pakistani construction sector faces significant challenges, particularly in relation to conflict and risk management, communication, and technical safety practices. The primary objective of this study is to identify and evaluate the key factors influencing BIM adoption in Pakistan, with a specific focus on understanding the roles of conflict and risk management, communication, technical safety management, and resource management in successful BIM implementation. The research used a combined pilot survey with 90 contributors, a prime questionnaire with 125 contributors, an exploratory factor analysis (EFA), and a structural equation modelling (SEM) approach has been used to do in depth statistical analysis. The results indicated the highest relation among planning and technical safety management and BIM implementation with path impact value of 0.613 followed by conflict and risk management with path value 272. According to the findings, every contributes appreciably to BIM’s usefulness in construction and project management. This examination contributes to the development of BIM research.","PeriodicalId":48648,"journal":{"name":"Ain Shams Engineering Journal","volume":null,"pages":null},"PeriodicalIF":6.0000,"publicationDate":"2024-09-07","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"BIM implementation in project management practices for sustainable development: Partial Least square approach\",\"authors\":\"Muhammad Sajjad, Anfeng Hu, Dorin RADU, Ahsan Waqar, Hamad R. Almujibah, Abdul Mateen\",\"doi\":\"10.1016/j.asej.2024.103048\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"As an emerging area with far-reaching implications for project management practices, Despite the growing global adoption of Building Information Modelling (BIM), its implementation in the Pakistani construction sector faces significant challenges, particularly in relation to conflict and risk management, communication, and technical safety practices. The primary objective of this study is to identify and evaluate the key factors influencing BIM adoption in Pakistan, with a specific focus on understanding the roles of conflict and risk management, communication, technical safety management, and resource management in successful BIM implementation. The research used a combined pilot survey with 90 contributors, a prime questionnaire with 125 contributors, an exploratory factor analysis (EFA), and a structural equation modelling (SEM) approach has been used to do in depth statistical analysis. The results indicated the highest relation among planning and technical safety management and BIM implementation with path impact value of 0.613 followed by conflict and risk management with path value 272. According to the findings, every contributes appreciably to BIM’s usefulness in construction and project management. This examination contributes to the development of BIM research.\",\"PeriodicalId\":48648,\"journal\":{\"name\":\"Ain Shams Engineering Journal\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":6.0000,\"publicationDate\":\"2024-09-07\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Ain Shams Engineering Journal\",\"FirstCategoryId\":\"5\",\"ListUrlMain\":\"https://doi.org/10.1016/j.asej.2024.103048\",\"RegionNum\":2,\"RegionCategory\":\"工程技术\",\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q1\",\"JCRName\":\"ENGINEERING, MULTIDISCIPLINARY\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Ain Shams Engineering Journal","FirstCategoryId":"5","ListUrlMain":"https://doi.org/10.1016/j.asej.2024.103048","RegionNum":2,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q1","JCRName":"ENGINEERING, MULTIDISCIPLINARY","Score":null,"Total":0}
引用次数: 0

摘要

建筑信息模型(BIM)是一个新兴领域,对项目管理实践具有深远影响,尽管全球采用 BIM 的情况日益增多,但其在巴基斯坦建筑部门的实施却面临重大挑战,特别是在冲突和风险管理、沟通和技术安全实践方面。本研究的主要目的是确定和评估影响巴基斯坦采用 BIM 的关键因素,重点是了解冲突和风险管理、沟通、技术安全管理和资源管理在成功实施 BIM 中的作用。研究采用了有 90 名贡献者参与的综合试点调查、有 125 名贡献者参与的主要问卷、探索性因素分析(EFA)以及结构方程建模(SEM)方法来进行深入的统计分析。结果表明,规划和技术安全管理与 BIM 实施之间的关系最大,路径影响值为 0.613,其次是冲突和风险管理,路径值为 272。根据研究结果,每个因素都对 BIM 在施工和项目管理中的实用性做出了显著贡献。这项研究有助于 BIM 研究的发展。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
BIM implementation in project management practices for sustainable development: Partial Least square approach
As an emerging area with far-reaching implications for project management practices, Despite the growing global adoption of Building Information Modelling (BIM), its implementation in the Pakistani construction sector faces significant challenges, particularly in relation to conflict and risk management, communication, and technical safety practices. The primary objective of this study is to identify and evaluate the key factors influencing BIM adoption in Pakistan, with a specific focus on understanding the roles of conflict and risk management, communication, technical safety management, and resource management in successful BIM implementation. The research used a combined pilot survey with 90 contributors, a prime questionnaire with 125 contributors, an exploratory factor analysis (EFA), and a structural equation modelling (SEM) approach has been used to do in depth statistical analysis. The results indicated the highest relation among planning and technical safety management and BIM implementation with path impact value of 0.613 followed by conflict and risk management with path value 272. According to the findings, every contributes appreciably to BIM’s usefulness in construction and project management. This examination contributes to the development of BIM research.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
Ain Shams Engineering Journal
Ain Shams Engineering Journal Engineering-General Engineering
CiteScore
10.80
自引率
13.30%
发文量
441
审稿时长
49 weeks
期刊介绍: in Shams Engineering Journal is an international journal devoted to publication of peer reviewed original high-quality research papers and review papers in both traditional topics and those of emerging science and technology. Areas of both theoretical and fundamental interest as well as those concerning industrial applications, emerging instrumental techniques and those which have some practical application to an aspect of human endeavor, such as the preservation of the environment, health, waste disposal are welcome. The overall focus is on original and rigorous scientific research results which have generic significance. Ain Shams Engineering Journal focuses upon aspects of mechanical engineering, electrical engineering, civil engineering, chemical engineering, petroleum engineering, environmental engineering, architectural and urban planning engineering. Papers in which knowledge from other disciplines is integrated with engineering are especially welcome like nanotechnology, material sciences, and computational methods as well as applied basic sciences: engineering mathematics, physics and chemistry.
期刊最新文献
Editorial Board BIM implementation in project management practices for sustainable development: Partial Least square approach Daylighting and energy consumption in museums and bridging the gap by multi-objective optimization An Improved digital multi-resonant controller for 3 [formula omitted] grid-tied and standalone PV system under balanced and unbalanced conditions Editorial Board
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1