多工厂预制供应链的数据驱动型物流协作

IF 9.6 1区 工程技术 Q1 CONSTRUCTION & BUILDING TECHNOLOGY Automation in Construction Pub Date : 2024-10-04 DOI:10.1016/j.autcon.2024.105802
Yishu Yang , Ying Yu , Chenglin Yu , Ray Y. Zhong
{"title":"多工厂预制供应链的数据驱动型物流协作","authors":"Yishu Yang ,&nbsp;Ying Yu ,&nbsp;Chenglin Yu ,&nbsp;Ray Y. Zhong","doi":"10.1016/j.autcon.2024.105802","DOIUrl":null,"url":null,"abstract":"<div><div>Prefabricated construction is increasingly replacing traditional methods due to its higher productivity, superior quality, and shorter construction time. This paper aims to optimize production and logistics collaboration within a three-tier prefabricated supply chain network to reduce overall costs and enhance response efficiency. A decision model was developed that integrates factory and logistics capacity, on-site assembly sequence, and outsourcing decisions to optimize resource allocation. The model demonstrates superior cost efficiency and resource allocation effectiveness over the Earliest Due Date (EDD) method through a hypothetical case study. This result provides robust decision support for supply chain professionals, offering significant practical implications for cost reduction and resource optimization. Our findings lay a foundation for future studies on supply chain management and optimization under dynamic conditions, offering new perspectives and methodologies.</div></div>","PeriodicalId":8660,"journal":{"name":"Automation in Construction","volume":null,"pages":null},"PeriodicalIF":9.6000,"publicationDate":"2024-10-04","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Data-driven logistics collaboration for prefabricated supply chain with multiple factories\",\"authors\":\"Yishu Yang ,&nbsp;Ying Yu ,&nbsp;Chenglin Yu ,&nbsp;Ray Y. Zhong\",\"doi\":\"10.1016/j.autcon.2024.105802\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"<div><div>Prefabricated construction is increasingly replacing traditional methods due to its higher productivity, superior quality, and shorter construction time. This paper aims to optimize production and logistics collaboration within a three-tier prefabricated supply chain network to reduce overall costs and enhance response efficiency. A decision model was developed that integrates factory and logistics capacity, on-site assembly sequence, and outsourcing decisions to optimize resource allocation. The model demonstrates superior cost efficiency and resource allocation effectiveness over the Earliest Due Date (EDD) method through a hypothetical case study. This result provides robust decision support for supply chain professionals, offering significant practical implications for cost reduction and resource optimization. Our findings lay a foundation for future studies on supply chain management and optimization under dynamic conditions, offering new perspectives and methodologies.</div></div>\",\"PeriodicalId\":8660,\"journal\":{\"name\":\"Automation in Construction\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":9.6000,\"publicationDate\":\"2024-10-04\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Automation in Construction\",\"FirstCategoryId\":\"5\",\"ListUrlMain\":\"https://www.sciencedirect.com/science/article/pii/S0926580524005387\",\"RegionNum\":1,\"RegionCategory\":\"工程技术\",\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q1\",\"JCRName\":\"CONSTRUCTION & BUILDING TECHNOLOGY\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Automation in Construction","FirstCategoryId":"5","ListUrlMain":"https://www.sciencedirect.com/science/article/pii/S0926580524005387","RegionNum":1,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q1","JCRName":"CONSTRUCTION & BUILDING TECHNOLOGY","Score":null,"Total":0}
引用次数: 0

摘要

预制建筑因其更高的生产率、更优的质量和更短的施工时间,正日益取代传统方法。本文旨在优化三级预制供应链网络中的生产和物流协作,以降低总体成本,提高响应效率。本文建立了一个决策模型,将工厂和物流能力、现场组装顺序和外包决策整合在一起,以优化资源配置。通过一个假设案例研究,该模型展示了比最早到期日(EDD)方法更优越的成本效率和资源分配效果。这一结果为供应链专业人士提供了强有力的决策支持,对降低成本和优化资源具有重要的现实意义。我们的研究结果为未来动态条件下的供应链管理和优化研究奠定了基础,提供了新的视角和方法。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Data-driven logistics collaboration for prefabricated supply chain with multiple factories
Prefabricated construction is increasingly replacing traditional methods due to its higher productivity, superior quality, and shorter construction time. This paper aims to optimize production and logistics collaboration within a three-tier prefabricated supply chain network to reduce overall costs and enhance response efficiency. A decision model was developed that integrates factory and logistics capacity, on-site assembly sequence, and outsourcing decisions to optimize resource allocation. The model demonstrates superior cost efficiency and resource allocation effectiveness over the Earliest Due Date (EDD) method through a hypothetical case study. This result provides robust decision support for supply chain professionals, offering significant practical implications for cost reduction and resource optimization. Our findings lay a foundation for future studies on supply chain management and optimization under dynamic conditions, offering new perspectives and methodologies.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
Automation in Construction
Automation in Construction 工程技术-工程:土木
CiteScore
19.20
自引率
16.50%
发文量
563
审稿时长
8.5 months
期刊介绍: Automation in Construction is an international journal that focuses on publishing original research papers related to the use of Information Technologies in various aspects of the construction industry. The journal covers topics such as design, engineering, construction technologies, and the maintenance and management of constructed facilities. The scope of Automation in Construction is extensive and covers all stages of the construction life cycle. This includes initial planning and design, construction of the facility, operation and maintenance, as well as the eventual dismantling and recycling of buildings and engineering structures.
期刊最新文献
Robust optimization model for traceable procurement of construction materials considering contract claims Editorial Board Rutting extraction from vehicle-borne laser point clouds Self-supervised monocular depth estimation on construction sites in low-light conditions and dynamic scenes Automated reinforcement of 3D-printed engineered cementitious composite beams
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1