在弹性配电系统中利用微电网形成分布式最小生成树方法恢复关键负载

IF 3.3 3区 工程技术 Q2 ENGINEERING, ELECTRICAL & ELECTRONIC Electric Power Systems Research Pub Date : 2024-11-06 DOI:10.1016/j.epsr.2024.111186
Hooman Saki , Ali Zangeneh , Jamshid Aghaei
{"title":"在弹性配电系统中利用微电网形成分布式最小生成树方法恢复关键负载","authors":"Hooman Saki ,&nbsp;Ali Zangeneh ,&nbsp;Jamshid Aghaei","doi":"10.1016/j.epsr.2024.111186","DOIUrl":null,"url":null,"abstract":"<div><div>Power grid is a vital infrastructure for society that can be severely damaged when facing high-impact and low-probability (HILP) events. Following these events, the power supply to critical infrastructures, known as critical loads (CLs), is often interrupted. This interruption can result in substantial financial, social, and security damage. Therefore, it is crucial to quickly restore de-energized CLs based on their priority and importance to society. This paper presents a distributed heuristic algorithm using a Distributed Minimum Spanning Tree (DMST) approach to restore CLs. The proposed algorithm offers several advantages over centralized optimization solutions, including robustness to single-point failures, scalability to large-scale networks, and reduced computational burden. In this algorithm, each controllable distributed generator (CDG), which has a restoration ancillary service contract with the distribution system, individually forms an islanded microgrid to restore CLs. The restoration process aims to maximize the number of restored CLs, enhance post-restoration reliability, and adjust restoration times. The effectiveness of the proposed approach is demonstrated through several case studies on the IEEE 123-bus test system. The results show that the algorithm successfully restores the maximum number of CLs.</div></div>","PeriodicalId":50547,"journal":{"name":"Electric Power Systems Research","volume":"239 ","pages":"Article 111186"},"PeriodicalIF":3.3000,"publicationDate":"2024-11-06","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Distributed minimum spanning tree approach for critical load restoration using microgrid formation in resilient distribution systems\",\"authors\":\"Hooman Saki ,&nbsp;Ali Zangeneh ,&nbsp;Jamshid Aghaei\",\"doi\":\"10.1016/j.epsr.2024.111186\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"<div><div>Power grid is a vital infrastructure for society that can be severely damaged when facing high-impact and low-probability (HILP) events. Following these events, the power supply to critical infrastructures, known as critical loads (CLs), is often interrupted. This interruption can result in substantial financial, social, and security damage. Therefore, it is crucial to quickly restore de-energized CLs based on their priority and importance to society. This paper presents a distributed heuristic algorithm using a Distributed Minimum Spanning Tree (DMST) approach to restore CLs. The proposed algorithm offers several advantages over centralized optimization solutions, including robustness to single-point failures, scalability to large-scale networks, and reduced computational burden. In this algorithm, each controllable distributed generator (CDG), which has a restoration ancillary service contract with the distribution system, individually forms an islanded microgrid to restore CLs. The restoration process aims to maximize the number of restored CLs, enhance post-restoration reliability, and adjust restoration times. The effectiveness of the proposed approach is demonstrated through several case studies on the IEEE 123-bus test system. The results show that the algorithm successfully restores the maximum number of CLs.</div></div>\",\"PeriodicalId\":50547,\"journal\":{\"name\":\"Electric Power Systems Research\",\"volume\":\"239 \",\"pages\":\"Article 111186\"},\"PeriodicalIF\":3.3000,\"publicationDate\":\"2024-11-06\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Electric Power Systems Research\",\"FirstCategoryId\":\"5\",\"ListUrlMain\":\"https://www.sciencedirect.com/science/article/pii/S0378779624010721\",\"RegionNum\":3,\"RegionCategory\":\"工程技术\",\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q2\",\"JCRName\":\"ENGINEERING, ELECTRICAL & ELECTRONIC\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Electric Power Systems Research","FirstCategoryId":"5","ListUrlMain":"https://www.sciencedirect.com/science/article/pii/S0378779624010721","RegionNum":3,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q2","JCRName":"ENGINEERING, ELECTRICAL & ELECTRONIC","Score":null,"Total":0}
引用次数: 0

摘要

电网是社会的重要基础设施,在面临高影响、低概率(HILP)事件时会受到严重破坏。这些事件发生后,关键基础设施(称为关键负载 (CL))的电力供应往往会中断。这种中断会造成巨大的经济、社会和安全损失。因此,根据断电负载的优先级和对社会的重要性,快速恢复断电负载至关重要。本文提出了一种采用分布式最小生成树 (DMST) 方法的分布式启发式算法,用于恢复 CL。与集中式优化解决方案相比,所提出的算法具有多项优势,包括对单点故障的鲁棒性、对大规模网络的可扩展性以及计算负担的减轻。在该算法中,每个与配电系统签订了恢复辅助服务合同的可控分布式发电机(CDG)单独组成一个孤岛微电网来恢复 CL。恢复过程旨在最大限度地增加已恢复 CL 的数量,提高恢复后的可靠性,并调整恢复时间。通过在 IEEE 123 总线测试系统上进行多个案例研究,证明了所提方法的有效性。结果表明,该算法成功地恢复了最大数量的 CL。
本文章由计算机程序翻译,如有差异,请以英文原文为准。

摘要图片

查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Distributed minimum spanning tree approach for critical load restoration using microgrid formation in resilient distribution systems
Power grid is a vital infrastructure for society that can be severely damaged when facing high-impact and low-probability (HILP) events. Following these events, the power supply to critical infrastructures, known as critical loads (CLs), is often interrupted. This interruption can result in substantial financial, social, and security damage. Therefore, it is crucial to quickly restore de-energized CLs based on their priority and importance to society. This paper presents a distributed heuristic algorithm using a Distributed Minimum Spanning Tree (DMST) approach to restore CLs. The proposed algorithm offers several advantages over centralized optimization solutions, including robustness to single-point failures, scalability to large-scale networks, and reduced computational burden. In this algorithm, each controllable distributed generator (CDG), which has a restoration ancillary service contract with the distribution system, individually forms an islanded microgrid to restore CLs. The restoration process aims to maximize the number of restored CLs, enhance post-restoration reliability, and adjust restoration times. The effectiveness of the proposed approach is demonstrated through several case studies on the IEEE 123-bus test system. The results show that the algorithm successfully restores the maximum number of CLs.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
Electric Power Systems Research
Electric Power Systems Research 工程技术-工程:电子与电气
CiteScore
7.50
自引率
17.90%
发文量
963
审稿时长
3.8 months
期刊介绍: Electric Power Systems Research is an international medium for the publication of original papers concerned with the generation, transmission, distribution and utilization of electrical energy. The journal aims at presenting important results of work in this field, whether in the form of applied research, development of new procedures or components, orginal application of existing knowledge or new designapproaches. The scope of Electric Power Systems Research is broad, encompassing all aspects of electric power systems. The following list of topics is not intended to be exhaustive, but rather to indicate topics that fall within the journal purview. • Generation techniques ranging from advances in conventional electromechanical methods, through nuclear power generation, to renewable energy generation. • Transmission, spanning the broad area from UHV (ac and dc) to network operation and protection, line routing and design. • Substation work: equipment design, protection and control systems. • Distribution techniques, equipment development, and smart grids. • The utilization area from energy efficiency to distributed load levelling techniques. • Systems studies including control techniques, planning, optimization methods, stability, security assessment and insulation coordination.
期刊最新文献
Electromechanical analysis of underbuilt wire use in transmission lines Optimal power flow solution via noise-resilient quantum interior-point methods Protection without current transformers for electrical installations with three-phase bus ducts Joint trading of energy and reserve considering microgrid agent fraudulent behaviors Aggregated vulnerability assessment of power transmission lines under operational and hurricane induced outages
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1