Yaxian Dong , Yuqing Hu , Shuai Li , Jiannan Cai , Zhu Han
{"title":"预制建筑项目的 BIM-区块链集成自动资产跟踪和延迟传播分析","authors":"Yaxian Dong , Yuqing Hu , Shuai Li , Jiannan Cai , Zhu Han","doi":"10.1016/j.autcon.2024.105854","DOIUrl":null,"url":null,"abstract":"<div><div>Asset tracking is crucial for managing prefabricated construction projects, as delayed deliveries might disrupt interdependent offsite and onsite activities, causing economic losses and disputes. To clarify liabilities, tamperproof asset tracking and delay propagation analysis are necessary. To achieve this, a BIM-blockchain integrated framework via smart contracts is proposed given rich information in BIM and blockchain's immutable records. First, asset information and interdependent activity schedule are automatically transmitted from BIM to blockchain. Then, QR codes are generated and attached to physical assets for tracking. If any delays, compiled smart contracts will automatically derive propagated impacts on offsite and onsite activities considering their interdependencies and proactively notify relevant parties. Affected activities with assets, certification time, and responsible parties are automatically visualized in 4D BIM for timely collaboration. The developed IFC-Ethereum prototype demonstrates the framework's feasibility and effectiveness, reducing coordination overhead costs and time. Traceable records help further calculate parties' penalties and compensation.</div></div>","PeriodicalId":8660,"journal":{"name":"Automation in Construction","volume":"168 ","pages":"Article 105854"},"PeriodicalIF":9.6000,"publicationDate":"2024-11-15","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"BIM-blockchain integrated automatic asset tracking and delay propagation analysis for prefabricated construction projects\",\"authors\":\"Yaxian Dong , Yuqing Hu , Shuai Li , Jiannan Cai , Zhu Han\",\"doi\":\"10.1016/j.autcon.2024.105854\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"<div><div>Asset tracking is crucial for managing prefabricated construction projects, as delayed deliveries might disrupt interdependent offsite and onsite activities, causing economic losses and disputes. To clarify liabilities, tamperproof asset tracking and delay propagation analysis are necessary. To achieve this, a BIM-blockchain integrated framework via smart contracts is proposed given rich information in BIM and blockchain's immutable records. First, asset information and interdependent activity schedule are automatically transmitted from BIM to blockchain. Then, QR codes are generated and attached to physical assets for tracking. If any delays, compiled smart contracts will automatically derive propagated impacts on offsite and onsite activities considering their interdependencies and proactively notify relevant parties. Affected activities with assets, certification time, and responsible parties are automatically visualized in 4D BIM for timely collaboration. The developed IFC-Ethereum prototype demonstrates the framework's feasibility and effectiveness, reducing coordination overhead costs and time. Traceable records help further calculate parties' penalties and compensation.</div></div>\",\"PeriodicalId\":8660,\"journal\":{\"name\":\"Automation in Construction\",\"volume\":\"168 \",\"pages\":\"Article 105854\"},\"PeriodicalIF\":9.6000,\"publicationDate\":\"2024-11-15\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Automation in Construction\",\"FirstCategoryId\":\"5\",\"ListUrlMain\":\"https://www.sciencedirect.com/science/article/pii/S0926580524005909\",\"RegionNum\":1,\"RegionCategory\":\"工程技术\",\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q1\",\"JCRName\":\"CONSTRUCTION & BUILDING TECHNOLOGY\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Automation in Construction","FirstCategoryId":"5","ListUrlMain":"https://www.sciencedirect.com/science/article/pii/S0926580524005909","RegionNum":1,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q1","JCRName":"CONSTRUCTION & BUILDING TECHNOLOGY","Score":null,"Total":0}
BIM-blockchain integrated automatic asset tracking and delay propagation analysis for prefabricated construction projects
Asset tracking is crucial for managing prefabricated construction projects, as delayed deliveries might disrupt interdependent offsite and onsite activities, causing economic losses and disputes. To clarify liabilities, tamperproof asset tracking and delay propagation analysis are necessary. To achieve this, a BIM-blockchain integrated framework via smart contracts is proposed given rich information in BIM and blockchain's immutable records. First, asset information and interdependent activity schedule are automatically transmitted from BIM to blockchain. Then, QR codes are generated and attached to physical assets for tracking. If any delays, compiled smart contracts will automatically derive propagated impacts on offsite and onsite activities considering their interdependencies and proactively notify relevant parties. Affected activities with assets, certification time, and responsible parties are automatically visualized in 4D BIM for timely collaboration. The developed IFC-Ethereum prototype demonstrates the framework's feasibility and effectiveness, reducing coordination overhead costs and time. Traceable records help further calculate parties' penalties and compensation.
期刊介绍:
Automation in Construction is an international journal that focuses on publishing original research papers related to the use of Information Technologies in various aspects of the construction industry. The journal covers topics such as design, engineering, construction technologies, and the maintenance and management of constructed facilities.
The scope of Automation in Construction is extensive and covers all stages of the construction life cycle. This includes initial planning and design, construction of the facility, operation and maintenance, as well as the eventual dismantling and recycling of buildings and engineering structures.