Olga Menagarishvili;Rebecca E. Burnett;Andy Frazee
{"title":"弄错了:计算机科学与技术交流关联课程中学生对时间和草稿数量的估计","authors":"Olga Menagarishvili;Rebecca E. Burnett;Andy Frazee","doi":"10.1109/TPC.2024.3477012","DOIUrl":null,"url":null,"abstract":"Background: Students in technical communication classes need to develop expert-like competence in project schedule management to prepare for academic and career success. We address two aspects of project schedule management—estimating time and estimating the number of drafts—that affect undergraduate computer science students in linked computer science–technical communication courses as they prepare documents for their client-based team project. Literature review: Our research considers three areas (developing expert-like behaviors, estimating time, and estimating the number of drafts) that students need to address in their coursework with complex, client-based problems. Research question: What percentage of students accurately estimate, overestimate, or underestimate the time needed to complete project tasks in face-to-face and hybrid sections? We define accurately estimating time as an expert-like behavior and categorize both generating documents and estimating the number of drafts as project tasks. Research methodology: To discuss this research question, we introduce the participants, explain our informed consent, describe our survey instrument for collecting data, and detail our research design. Results/discussion: We present student estimations in two categories: estimated versus actual time to complete assignments and the number of estimated versus actual drafts completed. We learn that students misjudge the amount of time and the number of drafts needed to complete a project, suggesting that technical communication coursework can better prepare students in developing these competencies.","PeriodicalId":46950,"journal":{"name":"IEEE Transactions on Professional Communication","volume":"67 4","pages":"471-487"},"PeriodicalIF":1.6000,"publicationDate":"2024-11-07","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Getting it Wrong: Student Estimations of Time and the Number of Drafts in Linked Computer Science and Technical Communication Courses\",\"authors\":\"Olga Menagarishvili;Rebecca E. Burnett;Andy Frazee\",\"doi\":\"10.1109/TPC.2024.3477012\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Background: Students in technical communication classes need to develop expert-like competence in project schedule management to prepare for academic and career success. We address two aspects of project schedule management—estimating time and estimating the number of drafts—that affect undergraduate computer science students in linked computer science–technical communication courses as they prepare documents for their client-based team project. Literature review: Our research considers three areas (developing expert-like behaviors, estimating time, and estimating the number of drafts) that students need to address in their coursework with complex, client-based problems. Research question: What percentage of students accurately estimate, overestimate, or underestimate the time needed to complete project tasks in face-to-face and hybrid sections? We define accurately estimating time as an expert-like behavior and categorize both generating documents and estimating the number of drafts as project tasks. Research methodology: To discuss this research question, we introduce the participants, explain our informed consent, describe our survey instrument for collecting data, and detail our research design. Results/discussion: We present student estimations in two categories: estimated versus actual time to complete assignments and the number of estimated versus actual drafts completed. We learn that students misjudge the amount of time and the number of drafts needed to complete a project, suggesting that technical communication coursework can better prepare students in developing these competencies.\",\"PeriodicalId\":46950,\"journal\":{\"name\":\"IEEE Transactions on Professional Communication\",\"volume\":\"67 4\",\"pages\":\"471-487\"},\"PeriodicalIF\":1.6000,\"publicationDate\":\"2024-11-07\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"IEEE Transactions on Professional Communication\",\"FirstCategoryId\":\"98\",\"ListUrlMain\":\"https://ieeexplore.ieee.org/document/10746861/\",\"RegionNum\":2,\"RegionCategory\":\"文学\",\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q2\",\"JCRName\":\"COMMUNICATION\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"IEEE Transactions on Professional Communication","FirstCategoryId":"98","ListUrlMain":"https://ieeexplore.ieee.org/document/10746861/","RegionNum":2,"RegionCategory":"文学","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q2","JCRName":"COMMUNICATION","Score":null,"Total":0}
Getting it Wrong: Student Estimations of Time and the Number of Drafts in Linked Computer Science and Technical Communication Courses
Background: Students in technical communication classes need to develop expert-like competence in project schedule management to prepare for academic and career success. We address two aspects of project schedule management—estimating time and estimating the number of drafts—that affect undergraduate computer science students in linked computer science–technical communication courses as they prepare documents for their client-based team project. Literature review: Our research considers three areas (developing expert-like behaviors, estimating time, and estimating the number of drafts) that students need to address in their coursework with complex, client-based problems. Research question: What percentage of students accurately estimate, overestimate, or underestimate the time needed to complete project tasks in face-to-face and hybrid sections? We define accurately estimating time as an expert-like behavior and categorize both generating documents and estimating the number of drafts as project tasks. Research methodology: To discuss this research question, we introduce the participants, explain our informed consent, describe our survey instrument for collecting data, and detail our research design. Results/discussion: We present student estimations in two categories: estimated versus actual time to complete assignments and the number of estimated versus actual drafts completed. We learn that students misjudge the amount of time and the number of drafts needed to complete a project, suggesting that technical communication coursework can better prepare students in developing these competencies.
期刊介绍:
The IEEE Transactions on Professional Communication is a peer-reviewed journal devoted to applied research on professional communication—including but not limited to technical and business communication. Papers should address the research interests and needs of technical communicators, engineers, scientists, information designers, editors, linguists, translators, managers, business professionals, and others from around the globe who practice, conduct research on, and teach others about effective professional communication. The Transactions publishes original, empirical research that addresses one of these contexts: The communication practices of technical professionals, such as engineers and scientists The practices of professional communicators who work in technical or business environments Evidence-based methods for teaching and practicing professional and technical communication.